us-gaap:ScheduleOfLossContingenciesByContingencyTextBlock

Line Company Text Block
1 ALTRIA GROUP, INC.

Note 14.  Contingencies:

Legal proceedings covering a wide range of matters are pending or threatened in various United States and foreign jurisdictions against Altria Group, Inc. and its subsidiaries, including PM USA and UST and its subsidiaries, as well as their respective indemnitees. Various types of claims are raised in these proceedings, including product liability, consumer protection, antitrust, tax, contraband shipments, patent infringement, employment matters, claims for contribution and claims of distributors.

Litigation is subject to uncertainty and it is possible that there could be adverse developments in pending or future cases. An unfavorable outcome or settlement of pending tobacco-related or other litigation could encourage the commencement of additional litigation. Damages claimed in some tobacco-related and other litigation are or can be significant and, in certain cases, range in the billions of dollars. The variability in pleadings in multiple jurisdictions, together with the actual experience of management in litigating claims, demonstrate that the monetary relief that may be specified in a lawsuit bears little relevance to the ultimate outcome.

Although PM USA has historically been able to obtain required bonds or relief from bonding requirements in order to prevent plaintiffs from seeking to collect judgments while adverse verdicts have been appealed, there remains a risk that such relief may not be obtainable in all cases. This risk has been substantially reduced given that 43 states now limit the dollar amount of bonds or require no bond at all.

Altria Group, Inc. and its subsidiaries record provisions in the consolidated financial statements for pending litigation when they determine that an unfavorable outcome is probable and the amount of the loss can be reasonably estimated. At the present time, while it is reasonably possible that an unfavorable outcome in a case may occur, except as discussed elsewhere in this Report on Form 10-Q: (i) management has concluded that it is not probable that a loss has been incurred in any of the pending tobacco-related cases; (ii) management is unable to estimate the possible loss or range of loss that could result from an unfavorable outcome in any of the pending tobacco-related cases; and (iii) accordingly, management has not provided any amounts in the consolidated financial statements for unfavorable outcomes, if any. Legal defense costs are expensed as incurred.

Altria Group, Inc. and its subsidiaries have achieved substantial success in managing litigation. Nevertheless, litigation is subject to uncertainty and significant challenges remain. It is possible that the consolidated results of operations, cash flows or financial position of Altria Group, Inc., or one or more of its subsidiaries, could be materially affected in a particular fiscal quarter or fiscal year by an unfavorable outcome or settlement of certain pending litigation. Altria Group, Inc. and each of its subsidiaries named as a defendant believe, and each has been so advised by counsel handling the respective cases, that it has valid defenses to the litigation pending against it, as well as valid bases for appeal of adverse verdicts. Each of the companies has defended, and will continue to defend, vigorously against litigation challenges. However, Altria Group, Inc. and its subsidiaries may enter into settlement discussions in particular cases if they believe it is in the best interests of Altria Group, Inc. to do so.

Overview of Altria Group, Inc. and/or PM USA Tobacco-Related Litigation

Types and Number of Cases

Claims related to tobacco products generally fall within the following categories: (i) smoking and health cases alleging personal injury brought on behalf of individual plaintiffs; (ii) smoking and health cases primarily alleging personal injury or seeking court-supervised programs for ongoing medical monitoring and purporting to be brought on behalf of a class of individual plaintiffs, including cases in which the aggregated claims of a number of individual plaintiffs are to be tried in a single proceeding; (iii) health care cost recovery cases brought by governmental (both domestic and foreign) and non-governmental plaintiffs seeking reimbursement for health care expenditures allegedly caused by cigarette smoking and/or disgorgement of profits; (iv) class action suits alleging that the uses of the terms “Lights” and “Ultra Lights” constitute deceptive and unfair trade practices, common law fraud, or violations of the Racketeer Influenced and Corrupt Organizations Act (“RICO”); and (v) other tobacco-related litigation described below. Plaintiffs’ theories of recovery and the defenses raised in pending smoking and health, health care cost recovery and “Lights/Ultra Lights” cases are discussed below.

The table below lists the number of certain tobacco-related cases pending in the United States against PM USA and, in some instances, Altria Group, Inc. as of October 26, 2009, November 1, 2008 and November 1, 2007.

 

Type of Case

   Number of
Cases
Pending as of
October 26,
2009
   Number of
Cases
Pending as of
November 1,
2008
   Number of
Cases

Pending as of
November 1,
2007

Individual Smoking and Health Cases (1)

   93    98    195

Smoking and Health Class Actions and
Aggregated Claims Litigation (2)

   8    9    10

Health Care Cost Recovery Actions

   3    3    3

“Lights/Ultra Lights” Class Actions

   33    17    17

Tobacco Price Cases

   2    2    2

 

  (1)

Does not include 2,595 cases brought by flight attendants seeking compensatory damages for personal injuries allegedly caused by exposure to environmental tobacco smoke (“ETS”). The flight attendants allege that they are members of an ETS smoking and health class action, which was settled in 1997. The terms of the court-approved settlement in that case allow class members to file individual lawsuits seeking compensatory damages, but prohibit them from seeking punitive damages. Also, does not include eight individual smoking and health cases brought against certain retailers that are indemnitees of PM USA. Additionally, does not include approximately 3,330 individual smoking and health cases (3,280 state court cases and 50 federal court cases) brought by or on behalf of approximately 9,019 plaintiffs in Florida (5,102 state court plaintiffs and 3,917 federal court plaintiffs) following the decertification of the Engle case discussed below. It is possible that some of these cases are duplicates and additional cases have been filed but not yet recorded on the courts’ dockets.

 

  (2)

Includes as one case the 693 civil actions (of which 393 are actions against PM USA) that are proposed to be tried in a single proceeding in West Virginia. Middleton and USSTC were named as defendants in this action but they, along with other non-cigarette manufacturers, have been severed from this case. The West Virginia Supreme Court of Appeals has ruled that the United States Constitution does not preclude a trial in two phases in this case. Issues related to defendants’ conduct, plaintiffs’ entitlement to punitive damages and a punitive damages multiplier, if any, would be determined in the first phase. The second phase would consist of individual trials to determine liability, if any, and compensatory damages. In November 2007, the West Virginia Supreme Court of Appeals denied defendants’ renewed motion for review of the trial plan. In December 2007, defendants filed a petition for writ of certiorari with the United States Supreme Court, which was denied in February 2008. The first phase of the trial is scheduled for February 1, 2010.

 

International Tobacco-Related Cases

As of October 26, 2009, PM USA is a named defendant in Israel in a “Lights” class action, a health care cost recovery action, and an individual smoking and health action. PM USA is a named defendant in three health care cost recovery actions in Canada, two of which also name Altria Group, Inc. as a defendant. PM USA and Altria Group, Inc. are also named defendants in four smoking and health class action lawsuits filed in various Canadian provinces.

Pending and Upcoming Trials

As of October 26, 2009, 3 Engle-progeny cases against PM USA are set for trial in 2009 (1 of the 3 cases has a scheduled 2009 trial date). Cases against other tobacco companies are also scheduled for trial through the end of 2009. Trial dates are subject to change.

Trial Results

Since January 1999, verdicts have been returned in 51 smoking and health, “Lights/Ultra Lights” and health care cost recovery cases in which PM USA was a defendant. Verdicts in favor of PM USA and other defendants were returned in 31 of the 51 cases. These 31 cases were tried in California (5), Florida (11), Mississippi (1), Missouri (2), New Hampshire (1), New Jersey (1), New York (3), Ohio (2), Pennsylvania (1), Rhode Island (1), Tennessee (2), and West Virginia (1). A motion for a new trial was granted in one of the cases in Florida.

Of the 20 cases in which verdicts were returned in favor of plaintiffs, eight have reached final resolution and one case (Williams – see below) has reached partial final resolution. A verdict against defendants in one health care cost recovery case has been reversed and all claims were dismissed with prejudice. In addition, a verdict against defendants in a purported “Lights” class action in Illinois (Price) was reversed and the case was dismissed with prejudice in December 2006. In December 2008, the plaintiff in Price filed a motion with the state trial court to vacate the judgment dismissing this case in light of the United States Supreme Court’s decision in Good (see below for a discussion of developments in Good and Price). After exhausting all appeals, PM USA has paid judgments in these cases totaling $106.1 million and interest totaling $63.8 million.

The chart below lists the verdicts and post-trial developments in the twelve pending cases that have gone to trial since January 1999 in which verdicts were returned in favor of plaintiffs.

 

Date

  

Location

of Court/

Name of

Plaintiff

  

Type of

Case

    

Verdict

  

Post-Trial Developments

August 2009

  

Florida/

Campbell

  

Engle progeny

    

On August 19, 2009, the jury in the Campbell trial (conducted in Escambia County) returned a verdict in favor of the plaintiff and against R.J. Reynolds, PM USA and Liggett Group. The jury awarded $7.8 million in compensatory damages. There

    

On August 31, 2009, defendants filed a joint motion to set aside the verdict, to enter judgment in accordance with defendants’ motion for directed verdict, or, in the alternative, to order a new trial or for remittitur of the jury’s

 

 

Date

  

Location

of Court/

Name of

Plaintiff

  

Type of

Case

  

Verdict

    

Post-Trial Developments

        

was no punitive damages award. On September 14, 2009, the trial court entered final judgment and awarded the plaintiff $156,000 in damages against PM USA due to the jury allocating only 2% of the fault to PM USA.

      

actual damages award. The trial court has not yet addressed this post-verdict motion.

 

August 2009

  

Florida/

Barbanell

  

Engle progeny

  

On August 13, 2009, a Broward County jury in the Barbanell trial returned a verdict in favor of the plaintiff, awarding $5.3 million in compensatory damages. The judge had previously dismissed the punitive damages claim. On September 4, 2009, the trial court entered final judgment and awarded plaintiff $1.95 million in actual damages. The judgment reduced the jury’s $5.3 million award of compensatory damages due to the jury allocating 36.5% of the fault to PM USA.

      

A notice of appeal was filed on September 30, 2009, and PM USA posted a $1.95 million appeal bond.

 

February 2009

  

Florida/

Hess

  

Engle progeny

  

In February 2009, a Broward County jury in the Hess trial found in favor of plaintiffs and against PM USA. The jury awarded $3 million in compensatory damages and $5 million in punitive damages. In June 2009, the trial court entered final judgment and awarded plaintiffs $1,260,000 in actual damages and $5 million in punitive damages. The judgment reduced the jury’s $3 million award of compensatory damages due to the jury allocating 42% of the fault to PM USA.

      

PM USA noticed an appeal to the Fourth District Court of Appeal on July 2, 2009 and posted a $7.3 million appeal bond.

 

May 2007

  

California/

Whiteley

  

Individual Smoking and Health

  

Approximately $2.5 million in compensatory damages against PM USA and the other defendant in the case, as well as $250,000 in punitive damages against the other defendant in the case.

      

In October 2007, in a limited retrial on the issue of punitive damages, the jury found that plaintiffs are not entitled to punitive damages against PM USA. In November 2007, the

 

 

Date

  

Location

of Court/

Name of

Plaintiff

  

Type of

Case

  

Verdict

    

Post-Trial Developments

               

trial court entered final judgment and PM USA filed a motion for a new trial and for judgment notwithstanding the verdict. The trial court rejected these motions in January 2008. In March 2008, PM USA noticed an appeal to the California Court of Appeal, First Appellate District and in May 2008, posted a $2.2 million appeal bond. The court affirmed the judgment on October 14, 2009.

 

August

2006

  

District of Columbia/ United States of America

  

Health Care Cost Recovery

  

Finding that defendants, including Altria Group, Inc. and PM USA, violated the civil provisions of the Racketeer Influenced and Corrupt Organizations Act (RICO). No monetary damages were assessed, but the court made specific findings and issued injunctions. See Federal Government’s Lawsuit below.

      

See Federal Government’s Lawsuit below.

 

March

2005

  

New York/ Rose (now known as Adamo)

  

Individual Smoking and Health

  

$3.42 million in compensatory damages against two defendants, including PM USA, and $17.1 million in punitive damages against PM USA.

      

In April 2008, an intermediate New York appellate court reversed the verdict and vacated the compensatory and punitive damages awards against PM USA. In December 2008, the New York Court of Appeals affirmed the appellate court decision. In January 2009, plaintiffs filed a petition with the New York Court of Appeals requesting that the court either vacate its earlier decision and reinstate the jury verdict or remand the case to the trial court for a new trial. The New York Court of Appeals denied plaintiffs’ motion in March 2009.

 

 

Date

  

Location

of Court/

Name of

Plaintiff

  

Type of

Case

  

Verdict

    

Post-Trial Developments

               

Plaintiffs filed a petition for a writ of certiorari with the United States Supreme Court, which was denied on October 5, 2009.

 

May

2004

  

Louisiana/ Scott

  

Smoking and Health Class Action

  

Approximately $590 million against all defendants, including PM USA, jointly and severally, to fund a 10-year smoking cessation program.

      

See Scott Class Action below.

 

October

2002

  

California/ Bullock

  

Individual Smoking and Health

  

$850,000 in compensatory damages and $28 billion in punitive damages against PM USA.

      

In December 2002, the trial court reduced the punitive damages award to $28 million. In April 2006, the California Court of Appeal affirmed the $28 million punitive damages award. In January 2008, the California Court of Appeal reversed the judgment with respect to the $28 million punitive damages award, affirmed the judgment in all other respects, and remanded the case to the trial court to conduct a new trial on the amount of punitive damages. In April 2008, the California Supreme Court denied PM USA’s petition for review. On August 24, 2009, the jury returned a verdict awarding plaintiff $13.8 million in punitive damages. See discussion (1) below.

 

June

2002

  

Florida/

Lukacs

  

Individual Smoking and Health

  

$37.5 million in compensatory damages against all defendants, including PM USA.

      

In March 2003, the trial court reduced the damages award to $24.8 million. PM USA’s share of the damages award is approximately $6 million. In January 2007, defendants petitioned the trial court to set aside the jury’s verdict and dismiss plaintiffs’ punitive damages claim. In August

 

 

Date

  

Location

of Court/

Name of

Plaintiff

  

Type of

Case

  

Verdict

    

Post-Trial Developments

               

2008, the trial court granted plaintiffs’ motion for entry of judgment and ordered compensatory damages of $24.8 million plus interest from the date of the verdict. In August 2008, PM USA filed a motion for reconsideration, which was denied. Final judgment was entered in November 2008, awarding plaintiffs actual damages of $24.8 million, plus interest from the date of the verdict. Defendants filed a notice of appeal in December 2008 and posted an appeal bond of $30.3 million.

 

March

2002

  

Oregon/ Schwarz

  

Individual Smoking and Health

  

$168,500 in compensatory damages and $150 million in punitive damages against PM USA.

      

In May 2002, the trial court reduced the punitive damages award to $100 million. In May 2006, the Oregon Court of Appeals affirmed the compensatory damages verdict, reversed the award of punitive damages and remanded the case to the trial court for a second trial to determine the amount of punitive damages, if any. In June 2006, plaintiff petitioned the Oregon Supreme Court to review the portion of the Court of Appeals’ decision reversing and remanding the case for a new trial on punitive damages. The Oregon Supreme Court held this petition in abeyance until the United States Supreme Court decided the Williams case described in (2) below. In May 2009, the Oregon Supreme Court issued an order granting plaintiff’s petition for review. Argument is scheduled to be held on

 

 

Date

  

Location

of Court/

Name of

Plaintiff

  

Type of

Case

  

Verdict

  

Post-Trial Developments

           

November 2, 2009.

July

2000

  

Florida/ Engle

  

Smoking and Health Class Action

  

$145 billion in punitive damages against all defendants, including $74 billion against PM USA.

  

See Engle Class Action below.

March

1999

  

Oregon/ Williams

  

Individual Smoking and Health

  

$800,000 in compensatory damages (capped statutorily at $500,000), $21,500 in medical expenses and $79.5 million in punitive damages against PM USA.

  

See discussion (2) below.

 

(1)

Bullock: In August 2006, the California Supreme Court denied plaintiffs’ petition to overturn the trial court’s reduction of the punitive damages award and granted PM USA’s petition for review challenging the punitive damages award. The court granted review of the case on a “grant and hold” basis under which further action by the court was deferred pending the United States Supreme Court’s 2007 decision on punitive damages in the Williams case described below. In February 2007, the United States Supreme Court vacated the punitive damages judgment in Williams and remanded the case to the Oregon Supreme Court for proceedings consistent with its decision. In May 2007, the California Supreme Court transferred the case to the Second District of the California Court of Appeal with directions that the court vacate its 2006 decision and reconsider the case in light of the United States Supreme Court’s decision in Williams. In January 2008, the California Court of Appeal reversed the judgment with respect to the $28 million punitive damages award, affirmed the judgment in all other respects, and remanded the case to the trial court to conduct a new trial on the amount of punitive damages. In March 2008, plaintiffs and PM USA appealed to the California Supreme Court. In April 2008, the California Supreme Court denied both petitions for review. In July 2008, $43.3 million of escrow funds were returned to PM USA. The case was remanded to the superior court for a new trial on the amount of punitive damages, if any. On August 24, 2009, the jury returned a verdict awarding plaintiff $13.8 million in punitive damages. No final judgment has yet been entered. PM USA has recorded a provision of approximately $1.6 million for compensatory damages, costs and interest.

 

(2)

Williams: The trial court reduced the punitive damages award to $32 million, and PM USA and plaintiff appealed. In June 2002, the Oregon Court of Appeals reinstated the $79.5 million punitive damages award. Following the Oregon Supreme Court’s refusal to hear PM USA’s appeal, PM USA recorded a provision of $32 million and petitioned the United States Supreme Court for further review (PM USA later recorded additional provisions of approximately $29 million related primarily to accrued interest). In October 2003, the United States Supreme Court set aside the Oregon appellate court’s ruling and directed the Oregon court to reconsider the case in light of the 2003 State Farm decision by the United States Supreme Court, which limited punitive damages. In June 2004, the Oregon Court of Appeals reinstated the $79.5 million punitive damages award. In February 2006, the Oregon Supreme Court affirmed the Court of Appeals’ decision. The United States Supreme Court granted PM USA’s petition for writ of certiorari in May 2006. In February 2007, the United States Supreme Court vacated the $79.5 million punitive damages award, holding that the United States Constitution prohibits basing punitive damages awards on harm to non-parties. The Court also found that states must assure that appropriate procedures are in place so that juries are provided with proper legal guidance as to the constitutional limitations on awards of punitive damages. Accordingly, the Court remanded the case to the Oregon Supreme Court for further proceedings consistent with this decision. In January 2008, the Oregon Supreme Court affirmed the Oregon Court of Appeals’ June 2004 decision, which in turn, upheld the jury’s compensatory damage award and reinstated the jury’s award of $79.5 million in punitive damages. In March 2008, PM USA filed a petition for writ of certiorari with the United States Supreme Court, which was granted in June 2008. In March 2009, the United States Supreme Court dismissed the writ of certiorari as being improvidently granted. Subsequent to the United States Supreme Court’s dismissal, PM USA paid $61.1 million to the plaintiffs, representing the compensatory damages award, forty percent of the punitive damages award and accrued interest. Oregon state law requires that sixty percent of any punitive damages award be paid to the state. However, PM USA believes that, as a result of the Master Settlement Agreement (“MSA”), it is not liable for the sixty percent that would be paid to the state. Oregon and PM USA are parties to a proceeding in Oregon state court that seeks a determination of PM USA’s liability for that sixty percent. If PM USA prevails, its obligation to pay punitive damages will be limited to the forty percent previously paid to the plaintiff. The court has consolidated that MSA proceeding with Williams, where plaintiff seeks to challenge the constitutionality of the Oregon statute apportioning the punitive damages award and claims that any punitive damages award released by the state reverts to plaintiff.

Security for Judgments

To obtain stays of judgments pending current appeals, as of September 30, 2009, PM USA has posted various forms of security totaling approximately $97 million, the majority of which has been collateralized with cash deposits that are included in other assets on the consolidated balance sheets.

Engle Class Action

In July 2000, in the second phase of the Engle smoking and health class action in Florida, a jury returned a verdict assessing punitive damages totaling approximately $145 billion against various defendants, including $74 billion against PM USA. Following entry of judgment, PM USA posted a bond in the amount of $100 million and appealed.

In May 2001, the trial court approved a stipulation providing that execution of the punitive damages component of the Engle judgment will remain stayed against PM USA and the other participating defendants through the completion of all judicial review. As a result of the stipulation, PM USA placed $500 million into a separate interest-bearing escrow account that, regardless of the outcome of the judicial review, will be paid to the court and the court will determine how to allocate or distribute it consistent with Florida Rules of Civil Procedure. In July 2001, PM USA also placed $1.2 billion into an interest-bearing escrow account, which was returned to PM USA in December 2007. In addition, the $100 million bond related to the case has been discharged. In connection with the stipulation, PM USA recorded a $500 million pre-tax charge in its consolidated statement of earnings for the quarter ended March 31, 2001. In May 2003, the Florida Third District Court of Appeal reversed the judgment entered by the trial court and instructed the trial court to order the decertification of the class. Plaintiffs petitioned the Florida Supreme Court for further review.

In July 2006, the Florida Supreme Court ordered that the punitive damages award be vacated, that the class approved by the trial court be decertified, and that members of the decertified class could file individual actions against defendants within one year of issuance of the mandate. The court further declared the following Phase I findings are entitled to res judicata effect in such individual actions brought within one year of the issuance of the mandate: (i) that smoking causes various diseases; (ii) that nicotine in cigarettes is addictive; (iii) that defendants’ cigarettes were defective and unreasonably dangerous; (iv) that defendants concealed or omitted material information not otherwise known or available knowing that the material was false or misleading or failed to disclose a material fact concerning the health effects or addictive nature of smoking; (v) that defendants agreed to misrepresent information regarding the health effects or addictive nature of cigarettes with the intention of causing the public to rely on this information to their detriment; (vi) that defendants agreed to conceal or omit information regarding the health effects of cigarettes or their addictive nature with the intention that smokers would rely on the information to their detriment; (vii) that all defendants sold or supplied cigarettes that were defective; and (viii) that defendants were negligent. The court also reinstated compensatory damage awards totaling approximately $6.9 million to two individual plaintiffs and found that a third plaintiff’s claim was barred by the statute of limitations. In February 2008, PM USA paid a total of $2,964,685, which represents its share of compensatory damages and interest to the two individual plaintiffs identified in the Florida Supreme Court’s order.

In August 2006, PM USA sought rehearing from the Florida Supreme Court on parts of its July 2006 opinion, including the ruling (described above) that certain jury findings have res judicata effect in subsequent individual trials timely brought by Engle class members. The rehearing motion also asked, among other things, that legal errors that were raised but not expressly ruled upon in the Third District Court of Appeal or in the Florida Supreme Court now be addressed. Plaintiffs also filed a motion for rehearing in August 2006 seeking clarification of the applicability of the statute of limitations to non-members of the decertified class. In December 2006, the Florida Supreme Court refused to revise its July 2006 ruling, except that it revised the set of Phase I findings entitled to res judicata effect by excluding finding (v) listed above (relating to agreement to misrepresent information), and added the finding that defendants sold or supplied cigarettes that, at the time of sale or supply, did not conform to the representations of fact made by defendants. In January 2007, the Florida Supreme Court issued the mandate from its revised opinion. Defendants then filed a motion with the Florida Third District Court of Appeal requesting that the court address legal errors that were previously raised by defendants but have not yet been addressed either by the Third District Court of Appeal or by the Florida Supreme Court. In February 2007, the Third District Court of Appeal denied defendants’ motion. In May 2007, defendants’ motion for a partial stay of the mandate pending the completion of appellate review was denied by the Third District Court of Appeal. In May 2007, defendants filed a petition for writ of certiorari with the United States Supreme Court. In October 2007, the United States Supreme Court denied defendants’ petition. In November 2007, the United States Supreme Court denied defendants’ petition for rehearing from the denial of their petition for writ of certiorari.

The deadline for filing Engle-progeny cases, as required by the Florida Supreme Court’s decision, expired in January 2008. As of October 26, 2009, approximately 3,330 cases (3,280 state court cases and 50 federal court cases) were pending against PM USA or Altria Group, Inc. asserting individual claims by or on behalf of approximately 9,019 plaintiffs (5,102 state court plaintiffs and 3,917 federal court plaintiffs). It is possible that some of these cases are duplicates. Some of these cases have been removed from various Florida state courts to the federal district courts in Florida, while others were filed in federal court. In July 2007, PM USA and other defendants requested that the multi-district litigation panel order the transfer of all such cases pending in the federal courts, as well as any other Engle-progeny cases that may be filed, to the Middle District of Florida for pretrial coordination. The panel denied this request in December 2007. In October 2007, attorneys for plaintiffs filed a motion to consolidate all pending and future cases filed in the state trial court in Hillsborough County. The court denied this motion in November 2007. In February 2008, the trial court decertified the class except for purposes of the May 2001 bond stipulation, and formally vacated the punitive damage award pursuant to the Florida Supreme Court’s mandate. In April 2008, the trial court ruled that certain defendants, including PM USA, lacked standing with respect to allocation of the funds escrowed under the May 2001 bond stipulation and will receive no credit at this time from the $500 million paid by PM USA against any future punitive damages awards in cases brought by former Engle class members.

 

In May 2008, the trial court, among other things, decertified the limited class maintained for purposes of the May 2001 bond stipulation and, in July 2008, severed the remaining plaintiffs’ claims except for those of Howard Engle. The only remaining plaintiff in the Engle case, Howard Engle, voluntarily dismissed his claims with prejudice. In July 2008, attorneys for a putative former Engle class member petitioned the Florida Supreme Court to permit members of the Engle class additional time to file individual lawsuits. The Florida Supreme Court denied this petition in January 2009.

Three federal district courts (in the Merlob, Brown and Burr cases) have ruled that the findings in the first phase of the Engle proceedings cannot be used to satisfy elements of plaintiffs’ claims, and two of those rulings (Brown and Burr) have been certified by the trial court for interlocutory review. The certification in both cases has been granted by the United States Court of Appeals for the Eleventh Circuit and the appeals have been consolidated. Argument is now scheduled for the week of January 25, 2010. In February 2009, the appeal in Burr was dismissed for lack of prosecution. Engle-progeny cases pending in the federal district courts in the Middle District of Florida asserting individual claims by or on behalf of approximately 4,000 plaintiffs have been stayed pending interlocutory review by the Eleventh Circuit. State trial court judges have issued contrary rulings that allowed plaintiffs to use the Engle findings to establish elements of their claims and required certain defenses to be stricken.

In June 2009, Florida amended its existing bond cap statute by adding a $200 million bond cap that applies to all Engle-progeny lawsuits in the aggregate and establishes individual bond caps for individual Engle-progeny cases in amounts that vary depending on the number of judgments in effect at a given time. The legislation, which became effective in June 2009, applies to judgments entered after the effective date and remains in effect until December 31, 2012.

As of October 26, 2009, five Engle-progeny cases involving PM USA have resulted in verdicts since the Florida Supreme Court Engle decision. Three verdicts (see Hess, Barbanell and Campbell descriptions in the table above) were returned in favor of plaintiffs and two verdicts were returned in favor of PM USA (Gelep and Kalyvas). The plaintiff in Gelep initially appealed the defense verdict, but on September 22, 2009 voluntarily dismissed her appeal. Engle-progeny trial results are included in the totals provided in Trial Results above.

Scott Class Action

In July 2003, following the first phase of the trial in the Scott class action, in which plaintiffs sought creation of a fund to pay for medical monitoring and smoking cessation programs, a Louisiana jury returned a verdict in favor of defendants, including PM USA, in connection with plaintiffs’ medical monitoring claims, but also found that plaintiffs could benefit from smoking cessation assistance. The jury also found that cigarettes as designed are not defective but that the defendants failed to disclose all they knew about smoking and diseases and marketed their products to minors. In May 2004, in the second phase of the trial, the jury awarded plaintiffs approximately $590 million against all defendants jointly and severally, to fund a 10-year smoking cessation program.

In June 2004, the court entered judgment, which awarded plaintiffs the approximately $590 million jury award plus prejudgment interest accruing from the date the suit commenced. PM USA’s share of the jury award and prejudgment interest has not been allocated. Defendants, including PM USA, appealed. Pursuant to a stipulation of the parties, the trial court entered an order setting the amount of the bond at $50 million for all defendants in accordance with an article of the Louisiana Code of Civil Procedure, and a Louisiana statute (the “bond cap law”), fixing the amount of security in civil cases involving a signatory to the MSA. Under the terms of the stipulation, plaintiffs reserve the right to contest, at a later date, the sufficiency or amount of the bond on any grounds including the applicability or constitutionality of the bond cap law. In September 2004, defendants collectively posted a bond in the amount of $50 million.

 

In February 2007, the Louisiana Court of Appeal issued a ruling on defendants’ appeal that, among other things: affirmed class certification but limited the scope of the class; struck certain of the categories of damages included in the judgment, reducing the amount of the award by approximately $312 million; vacated the award of prejudgment interest, which totaled approximately $444 million as of February 15, 2007; and ruled that the only class members who are eligible to participate in the smoking cessation program are those who began smoking before, and whose claims accrued by, September 1, 1988. As a result, the Louisiana Court of Appeal remanded the case for proceedings consistent with its opinion, including further reduction of the amount of the award based on the size of the new class. In March 2007, the Louisiana Court of Appeal rejected defendants’ motion for rehearing and clarification. In January 2008, the Louisiana Supreme Court denied plaintiffs’ and defendants’ petitions for writ of certiorari. Following the Louisiana Supreme Court’s denial of defendants’ petition for writ of certiorari, PM USA recorded a provision of $26 million in connection with the case and has recorded additional provisions of approximately $4.2 million related to accrued interest. In March 2008, plaintiffs filed a motion to execute the approximately $279 million judgment plus post-judgment interest or, in the alternative, for an order to the parties to submit revised damages figures. Defendants filed a motion to have judgment entered in favor of defendants based on accrual of all class member claims after September 1, 1988 or, in the alternative, for the entry of a case management order. In April 2008, the Louisiana Supreme Court denied defendants’ motion to stay proceedings and the defendants filed a petition for writ of certiorari with the United States Supreme Court. In June 2008, the United States Supreme Court denied the defendant’s petition. Plaintiffs filed a motion to enter judgment in the amount of approximately $280 million (subsequently changed to approximately $264 million) and defendants filed a motion to enter judgment in their favor dismissing the case entirely or, alternatively, to enter a case management order for a new trial. In July 2008, the trial court entered an Amended Judgment and Reasons for Judgment denying both motions, but ordering defendants to deposit into the registry of the court the sum of $263,532,762 plus post-judgment interest of approximately $102 million (as of September 30, 2009) while stating, however, that the judgment award “may be satisfied with something less than a full cash payment now” and that the court would “favorably consider” returning unused funds annually to defendants if monies allocated for that year were not fully expended.

In September 2008, defendants filed an application for writ of mandamus or supervisory writ to secure the right to appeal with the Louisiana Circuit Court of Appeals. The appellate court, in November 2008, granted the defendants’ writ and directed the trial court to enter an order permitting the appeal and to set the appeal bond in accordance with Louisiana law. In December 2008, plaintiffs’ supervisory writ petition to the Louisiana Supreme Court was denied and the trial court entered an order permitting the appeal and approving a $50 million bond for all defendants in accordance with the Louisiana bond cap law discussed above. In April 2009, plaintiffs filed a cross-appeal seeking to reinstate the June 2004 judgment and to award the medical monitoring rejected by the jury. Argument before the Louisiana Court of Appeal, Fourth Circuit, was held on September 1, 2009.

Smoking and Health Litigation

Overview

Plaintiffs’ allegations of liability in smoking and health cases are based on various theories of recovery, including negligence, gross negligence, strict liability, fraud, misrepresentation, design defect, failure to warn, nuisance, breach of express and implied warranties, breach of special duty, conspiracy, concert of action, violations of deceptive trade practice laws and consumer protection statutes, and claims under the federal and state anti-racketeering statutes. Plaintiffs in the smoking and health actions seek various forms of relief, including compensatory and punitive damages, treble/multiple damages and other statutory damages and penalties, creation of medical monitoring and smoking cessation funds, disgorgement of profits, and injunctive and equitable relief. Defenses raised in these cases include lack of proximate cause, assumption of the risk, comparative fault and/or contributory negligence, statutes of limitations and preemption by the Federal Cigarette Labeling and Advertising Act.

In July 2008, the New York Supreme Court, Appellate Division, First Department in Fabiano, an individual personal injury case, held that plaintiffs’ punitive damages claim was barred by the MSA (as defined below) based on principles of res judicata because the New York Attorney General had already litigated the punitive damages claim on behalf of all New York residents. In August 2008, plaintiffs filed a motion for permission to appeal to the Court of Appeals. The motion was denied in November 2008.

Smoking and Health Class Actions

Since the dismissal in May 1996 of a purported nationwide class action brought on behalf of allegedly addicted smokers, plaintiffs have filed numerous putative smoking and health class action suits in various state and federal courts. In general, these cases purport to be brought on behalf of residents of a particular state or states (although a few cases purport to be nationwide in scope) and raise addiction claims and, in many cases, claims of physical injury as well.

Class certification has been denied or reversed by courts in 57 smoking and health class actions involving PM USA in Arkansas (1), the District of Columbia (2), Florida (2), Illinois (2), Iowa (1), Kansas (1), Louisiana (1), Maryland (1), Michigan (1), Minnesota (1), Nevada (29), New Jersey (6), New York (2), Ohio (1), Oklahoma (1), Pennsylvania (1), Puerto Rico (1), South Carolina (1), Texas (1) and Wisconsin (1). A class remains certified in the Scott class action discussed above.

Two purported class actions pending against PM USA have been brought in New York (Caronia, filed in January 2006 in the United States District Court for the Eastern District of New York) and Massachusetts (Donovan, filed in December 2006 in the United States District Court for the District of Massachusetts) on behalf of each state’s respective residents who: are age 50 or older; have smoked the Marlboro brand for 20 pack-years or more; and have neither been diagnosed with lung cancer nor are under investigation by a physician for suspected lung cancer. Plaintiffs in these cases seek to impose liability under various product-based causes of action and the creation of a court-supervised program providing members of the purported class Low Dose CT Scanning in order to identify and diagnose lung cancer. Neither claim seeks punitive damages. Plaintiffs’ motion for class certification and defendant’s motion for summary judgment are pending in Caronia. Defendants’ motions for summary judgment and judgment on the pleadings and plaintiffs’ motion for class certification are pending in Donovan. In Donovan, the Supreme Judicial Court of Massachusetts heard arguments in June 2009 on the questions certified to it by the district court regarding medical monitoring and statute of limitations issues. On October 19, 2009, the Supreme Judicial Court of Massachusetts, in answering the questions certified to it, held that under certain circumstances state law recognizes a claim by individual smokers for medical monitoring despite the absence of an actual injury. The court also ruled that whether or not the case is barred by the applicable statute of limitations is a factual issue to be determined by the trial court.

In November 2008, a purported class action naming PM USA, Altria Group, Inc. and the other major cigarette manufacturers as defendants was filed in the United States District Court for the Northern District of Georgia on behalf of a purported class of cigarette smokers who seek medical monitoring (Peoples). Plaintiffs allege that the tobacco companies conspired to convince the National Cancer Institute (“NCI”) to not recommend spiral CT scans to screen for lung cancer and plaintiffs assert claims based on defendants’ purported violations of RICO. The complaint identifies the purported class as all residents of the State of Georgia who, by virtue of their age and history of smoking cigarettes, are at increased risk for developing lung cancer; are 50 years of age or older; have cigarette smoking histories of 20 pack-years or more; and are covered by an insurance company, Medicare, Medicaid or a third party medical payor. Plaintiffs seek relief in the form of the creation of a fund for medical monitoring and punitive damages. In February 2009, defendants filed a motion to dismiss. On September 11, 2009, the district judge entered judgment against plaintiffs and dismissed the case, concluding that plaintiffs failed to allege sufficient facts to state a claim for relief under RICO. A similar purported class action (Jackson) was filed in the United States District Court for the Northern District of Georgia in May 2009. Altria Group, Inc. and PM USA are named as defendants. Motions to dismiss are pending.

In July 2009, PM USA and Altria Group, Inc. were named as defendants, along with other cigarette manufacturers, in four actions filed in various Canadian provinces. In the Province of Saskatchewan, plaintiffs seek class certification on behalf of individuals who suffer or have suffered from various diseases including chronic obstructive pulmonary disease, emphysema, heart disease or cancer. In each of the other actions, plaintiffs seek certification of a class of all individuals who smoked defendants’ cigarettes. See “Guarantees” for a discussion of the Distribution Agreement between Altria Group, Inc. and PMI that provides for indemnities for certain liabilities concerning tobacco products.

Health Care Cost Recovery Litigation

Overview

In health care cost recovery litigation, governmental entities and non-governmental plaintiffs seek reimbursement of health care cost expenditures allegedly caused by tobacco products and, in some cases, of future expenditures and damages as well. Relief sought by some but not all plaintiffs includes punitive damages, multiple damages and other statutory damages and penalties, injunctions prohibiting alleged marketing and sales to minors, disclosure of research, disgorgement of profits, funding of anti-smoking programs, additional disclosure of nicotine yields, and payment of attorney and expert witness fees.

The claims asserted include the claim that cigarette manufacturers were “unjustly enriched” by plaintiffs’ payment of health care costs allegedly attributable to smoking, as well as claims of indemnity, negligence, strict liability, breach of express and implied warranty, violation of a voluntary undertaking or special duty, fraud, negligent misrepresentation, conspiracy, public nuisance, claims under federal and state statutes governing consumer fraud, antitrust, deceptive trade practices and false advertising, and claims under federal and state anti-racketeering statutes.

Defenses raised include lack of proximate cause, remoteness of injury, failure to state a valid claim, lack of benefit, adequate remedy at law, “unclean hands” (namely, that plaintiffs cannot obtain equitable relief because they participated in, and benefited from, the sale of cigarettes), lack of antitrust standing and injury, federal preemption, lack of statutory authority to bring suit, and statutes of limitations. In addition, defendants argue that they should be entitled to “set off” any alleged damages to the extent the plaintiffs benefit economically from the sale of cigarettes through the receipt of excise taxes or otherwise. Defendants also argue that these cases are improper because plaintiffs must proceed under principles of subrogation and assignment. Under traditional theories of recovery, a payor of medical costs (such as an insurer) can seek recovery of health care costs from a third party solely by “standing in the shoes” of the injured party. Defendants argue that plaintiffs should be required to bring any actions as subrogees of individual health care recipients and should be subject to all defenses available against the injured party.

Although there have been some decisions to the contrary, most judicial decisions have dismissed all or most health care cost recovery claims against cigarette manufacturers. Nine federal circuit courts of appeals and six state appellate courts, relying primarily on grounds that plaintiffs’ claims were too remote, have ordered or affirmed dismissals of health care cost recovery actions. The United States Supreme Court has refused to consider plaintiffs’ appeals from the cases decided by five circuit courts of appeals.

In March 1999, in the first health care cost recovery case to go to trial, an Ohio jury returned a verdict in favor of defendants on all counts. In addition, a $17.8 million verdict against defendants (including $6.8 million against PM USA) was reversed in a health care cost recovery case in New York, and all claims were dismissed with prejudice in February 2005 (Blue Cross/Blue Shield). In June 2009, the trial court denied two of defendants’ motions for summary judgment in a health care cost recovery case brought by the City of St. Louis, Missouri and approximately 40 Missouri hospitals, in which PM USA, USSTC and Altria Group, Inc. are defendants. Trial is currently scheduled to begin on June 7, 2010.

Individuals and associations have also sued in purported class actions or as private attorneys general under the Medicare as Secondary Payer (“MSP”) provisions of the Social Security Act to recover from defendants Medicare expenditures allegedly incurred for the treatment of smoking-related diseases. Cases brought in New York (Mason), Florida (Glover) and Massachusetts (United Seniors Association) have been dismissed by federal courts. In April 2008, an action, National Committee to Preserve Social Security and Medicare, et al. v. Philip Morris USA, et al. (“National Committee I”), was brought under the Medicare as Secondary Payer statute in the Circuit Court of the Eleventh Judicial Circuit of and for Miami County, Florida, but was dismissed voluntarily in May 2008. The action purported to be brought on behalf of Medicare to recover an unspecified amount of damages equal to double the amount paid by Medicare for smoking-related health care services provided from April 19, 2002 to the present.

In May 2008, an action, National Committee to Preserve Social Security, et al. v. Philip Morris USA, et al., was brought under the Medicare as Secondary Payer statute in United States District Court for the Eastern District of New York. This action was brought by the same plaintiffs as National Committee I and similarly purports to be brought on behalf of Medicare to recover an unspecified amount of damages equal to double the amount paid by Medicare for smoking-related health care services provided from May 21, 2002 to the present. In July 2008, defendants filed a motion to dismiss plaintiffs’ claims and plaintiffs filed a motion for partial summary judgment. In March 2009, the court granted defendants’ motion to dismiss. Plaintiffs noticed an appeal in May 2009 after the district court denied their motion for reconsideration. On September 1, 2009, defendants filed a motion for summary disposition of the appeal.

In addition to the cases brought in the United States, health care cost recovery actions have also been brought against tobacco industry participants, including PM USA, in Israel (1), the Marshall Islands (1 dismissed), and Canada (3) and other entities have stated that they are considering filing such actions. In September 2005, in the first of the three health care recovery cases filed in Canada, the Canadian Supreme Court ruled that legislation passed in British Columbia permitting the lawsuit is constitutional, and, as a result, the case, which had previously been dismissed by the trial court, was permitted to proceed. PM USA’s and other defendants’ challenge to the British Columbia court’s exercise of jurisdiction was rejected by the Court of Appeals of British Columbia and, in April 2007, the Supreme Court of Canada denied review of that decision. During 2008, the Province of New Brunswick, Canada, proclaimed into law previously adopted legislation allowing reimbursement claims to be brought against cigarette manufacturers, and it filed suit shortly thereafter. On September 29, 2009, the Province of Ontario, Canada, filed suit against a number of cigarette manufacturers based on previously adopted legislation nearly identical in substance to the New Brunswick health care cost recovery legislation. Altria Group, Inc. and PM USA are named as defendants in the New Brunswick and Ontario cases. Several other provinces in Canada have enacted similar legislation or are in the process of enacting similar legislation. See “Guarantees” for a discussion of the Distribution Agreement between Altria Group, Inc. and PMI that provides for indemnities for certain liabilities concerning tobacco products.

Settlements of Health Care Cost Recovery Litigation

In November 1998, PM USA and certain other United States tobacco product manufacturers entered into the MSA with 46 states, the District of Columbia, Puerto Rico, Guam, the United States Virgin Islands, American Samoa and the Northern Marianas to settle asserted and unasserted health care cost recovery and other claims. PM USA and certain other United States tobacco product manufacturers had previously settled similar claims brought by Mississippi, Florida, Texas and Minnesota (together with the MSA, the “State Settlement Agreements”). The State Settlement Agreements require that the original participating manufacturers make substantial annual payments of approximately $9.4 billion each year (excluding future annual payments, if any, under the National Tobacco Grower Settlement Trust discussed below), subject to adjustments for several factors, including inflation, market share and industry volume. In addition, the original participating manufacturers are required to pay settling plaintiffs’ attorneys’ fees, subject to an annual cap of $500 million. For the nine and three months ended September 30, 2009, the aggregate amount recorded in cost of sales with respect to the State Settlement Agreements and the Fair and Equitable Tobacco Reform Act of 2004 (“FETRA”) was approximately $3.8 billion and $1.3 billion, respectively.

The State Settlement Agreements also include provisions relating to advertising and marketing restrictions, public disclosure of certain industry documents, limitations on challenges to certain tobacco control and underage use laws, restrictions on lobbying activities and other provisions.

Possible Adjustments in MSA Payments for 2003 to 2008

Pursuant to the provisions of the MSA, domestic tobacco product manufacturers, including PM USA, who are original signatories to the MSA (the “Original Participating Manufacturers” or “OPMs”) are participating in proceedings that may result in downward adjustments to the amounts paid by the OPMs and the other MSA-participating manufacturers to the states and territories that are parties to the MSA for each of the years 2003 to 2008. The proceedings relate to an MSA payment adjustment (the “NPM Adjustment”) based on the collective loss of market share for the relevant year by all participating manufacturers who are subject to the payment obligations and marketing restrictions of the MSA to non-participating manufacturers (“NPMs”) who are not subject to such obligations and restrictions.

As part of these proceedings, an independent economic consulting firm jointly selected by the MSA parties or otherwise selected pursuant to the MSA’s provisions is required to determine whether the disadvantages of the MSA were a “significant factor” contributing to the collective loss of market share for the year in question. If the firm determines that the disadvantages of the MSA were such a “significant factor,” each state may avoid a downward adjustment to its share of the participating manufacturers’ annual payments for that year by establishing that it diligently enforced a qualifying escrow statute during the entirety of that year. Any potential downward adjustment would then be reallocated to any states that do not establish such diligent enforcement. PM USA believes that the MSA’s arbitration clause requires a state to submit its claim to have diligently enforced a qualifying escrow statute to binding arbitration before a panel of three former federal judges in the manner provided for in the MSA. A number of states have taken the position that this claim should be decided in state court on a state-by-state basis.

In March 2006, an independent economic consulting firm determined that the disadvantages of the MSA were a significant factor contributing to the participating manufacturers’ collective loss of market share for the year 2003. In February 2007, this same firm determined that the disadvantages of the MSA were a significant factor contributing to the participating manufacturers’ collective loss of market share for the year 2004. In February 2008, the same economic consulting firm determined that the disadvantages of the MSA were a significant factor contributing to the participating manufacturers’ collective loss of market share for the year 2005. A different economic consulting firm was selected to make the “significant factor” determination regarding the participating manufacturers’ collective loss of market share for the year 2006. In March 2009, this firm determined that the disadvantages of the MSA were a significant factor contributing to the participating manufacturers’ collective loss of market share for the year 2006. Following the firm’s determination for 2006, the OPMs and the states agreed that the states will not contest that the disadvantages of the MSA were a significant factor contributing to the participating manufacturers’ collective loss of market share for the years 2007 and 2008 (and 2009, if the participating manufacturers collectively sustain a sufficient loss of market share for that year as well). Accordingly, the OPMs and the states have agreed that no “significant factor” determination by the firm will be necessary with respect to the participating manufacturers’ collective loss of market share for the years 2007, 2008 and 2009.

 

Following the economic consulting firm’s determination with respect to 2003, thirty-eight states filed declaratory judgment actions in state courts seeking a declaration that the state diligently enforced its escrow statute during 2003. The OPMs and other MSA-participating manufacturers have responded to these actions by filing motions to compel arbitration in accordance with the terms of the MSA, including filing motions to compel arbitration in eleven MSA states and territories that have not filed declaratory judgment actions. Courts in all but one of the forty-six MSA states and the District of Columbia and Puerto Rico have ruled that the question of whether a state diligently enforced its escrow statute during 2003 is subject to arbitration. One state court has ruled that the diligent enforcement claims of that state may be litigated in state court, rather than in arbitration. Several of these rulings may be subject to further review. PM USA, the other OPMs and approximately twenty-five other MSA-participating manufacturers have entered into an agreement regarding arbitration with over forty MSA states concerning the 2003 NPM Adjustment, including the states’ claims of diligent enforcement for 2003. The agreement provides for selection of the arbitration panel for the 2003 NPM Adjustment beginning during the last quarter of 2009 and for the arbitration then to proceed. The agreement further provides for a partial liability reduction for the 2003 NPM Adjustment for states that entered into the agreement by January 30, 2009 and are determined in the arbitration not to have diligently enforced a qualifying escrow statute during 2003. Based on the number of states that entered into the agreement by January 30, 2009 (forty-five), the partial liability reduction for those states is 20%. The partial liability reduction would reduce the amount of PM USA’s 2003 NPM Adjustment by up to a corresponding percentage. Proceedings to determine state diligent enforcement claims for the years 2004 through 2008 have not yet been scheduled.

The availability and the precise amount of any NPM Adjustment for 2003, 2004, 2005, 2006, 2007 and 2008 will not be finally determined until 2010 or thereafter. There is no certainty that the OPMs and other MSA-participating manufacturers will ultimately receive any adjustment as a result of these proceedings. If the OPMs do receive such an adjustment through these proceedings, the adjustment would be allocated among the OPMs pursuant to the MSA’s provisions, and PM USA’s share would likely be applied as a credit against one or several future MSA payments.

National Grower Settlement Trust

As part of the MSA, the settling defendants committed to work cooperatively with the tobacco-growing states to address concerns about the potential adverse economic impact of the MSA on tobacco growers and quota holders. To that end, in 1999, four of the major domestic tobacco product manufacturers, including PM USA, established the National Tobacco Grower Settlement Trust (“NTGST”), a trust fund to provide aid to tobacco growers and quota holders. The trust was to be funded by these four manufacturers over 12 years with payments, subject to application of various adjustments, scheduled to total $5.15 billion. Provisions of the NTGST allowed for offsets to the extent that industry-funded payments were made for the benefit of growers or quota holders as part of a legislated end to the federal tobacco quota and price support program.

In October 2004, FETRA was signed into law. FETRA provides for the elimination of the federal tobacco quota and price support program through an industry-funded buy-out of tobacco growers and quota holders. The cost of the buy-out, which is estimated at approximately $9.5 billion, is being paid over 10 years by manufacturers and importers of each kind of tobacco product. The cost is being allocated based on the relative market shares of manufacturers and importers of each kind of tobacco product. The quota buy-out payments offset already scheduled payments to the NTGST. However, two of the grower states, Maryland and Pennsylvania, have filed claims in the North Carolina state courts, asserting that the companies which established the NTGST (including PM USA) must continue making payments under the NTGST through 2010 for the benefit of Maryland and Pennsylvania growers (such continuing payments would represent slightly more than one percent of the originally scheduled payments that would have been due to the NTGST for the years 2005 through 2010) notwithstanding the offsets resulting from the FETRA payments. The North Carolina trial court held in favor of Maryland and Pennsylvania, and the companies (including PM USA) appealed. The North Carolina Court of Appeals, in December 2008, reversed the trial court ruling. In January 2009, Maryland and Pennsylvania filed a notice of appeal to the North Carolina Supreme Court. The court heard oral argument on September 10, 2009. In addition to the approximately $9.5 billion cost of the buy-out, FETRA also obligated manufacturers and importers of tobacco products to cover any losses (up to $500 million) that the government incurred on the disposition of tobacco pool stock accumulated under the previous tobacco price support program. PM USA, Middleton and USSTC are subject to the requirements of FETRA. Altria Group, Inc. does not currently anticipate that the quota buy-out will have a material adverse impact on its consolidated results in 2009 and beyond.

Other MSA-Related Litigation

PM USA was named as a defendant in an action brought in October 2008 in federal court in Kentucky by an MSA participating manufacturer that is not an OPM. Other defendants include various other participating manufacturers and the Attorneys General of all 52 states and territories that are parties to the MSA. The plaintiff alleged that certain of the MSA’s payment provisions discriminate against it in favor of certain other participating manufacturers in violation of the federal antitrust laws and the United States Constitution. The plaintiff also sought injunctive relief, alteration of certain MSA payment provisions as applied to it, treble damages under the federal antitrust laws, and/or rescission of its joinder in the MSA. The plaintiff also filed a motion for a preliminary injunction enjoining the states from enforcing the allegedly discriminatory payment provisions against it during the pendency of action. In November 2008, defendants filed a motion to dismiss the complaint on various grounds and, in January 2009, the court dismissed the complaint and denied plaintiff’s request for preliminary injunctive relief.

In December 2008, PM USA was named as a defendant in an action seeking declaratory relief under the MSA. The action was filed in California state court by the same MSA participating manufacturer that filed the Kentucky action discussed in the preceding paragraph. Other defendants include the State of California and various other participating manufacturers. The plaintiff is seeking a declaratory judgment that its proposed amended adherence agreement with California and other states that are parties to the MSA is consistent with provisions in the MSA, and that the MSA’s limited most favored nations provision does not apply to the proposed agreement. Plaintiff seeks no damages in this action. On July 21, 2009, the court granted defendants’ motion for summary judgment. On July 28, 2009, the court entered final judgment in favor of defendants on all claims asserted by plaintiff. Plaintiff has filed an appeal.

Without naming PM USA or any other private party as a defendant, NPMs and/or their distributors or customers have filed several legal challenges to the MSA and related legislation. New York state officials are defendants in a lawsuit pending in the United States District Court for the Southern District of New York in which cigarette importers allege that the MSA and/or related legislation violates federal antitrust laws and the Commerce Clause of the United States Constitution. In a separate proceeding pending in the same court, plaintiffs assert the same theories against not only New York officials but also the Attorneys General for thirty other states. The United States Court of Appeals for the Second Circuit has held that the allegations in both actions, if proven, establish a basis for relief on antitrust and Commerce Clause grounds and that the trial courts in New York have personal jurisdiction sufficient to enjoin other states’ officials from enforcing their MSA-related legislation. On remand in those two actions, one trial court has granted summary judgment for the New York officials and lifted a preliminary injunction against New York officials’ enforcement against plaintiffs of the state’s “allocable share” amendment to the MSA’s Model Escrow Statute; the other trial court has held that plaintiffs are unlikely to succeed on the merits. The former decision is on appeal to the United States Court of Appeals for the Second Circuit.

In another action, the United States Court of Appeals for the Fifth Circuit reversed a trial court’s dismissal of challenges to MSA-related legislation in Louisiana under the First and Fourteenth Amendments to the United States Constitution. On remand in that case, and in another case filed against the Louisiana Attorney General, trial courts have granted summary judgment for the Louisiana Attorney General. One of those decisions is on appeal to the United States Court of Appeals for the Fifth Circuit. The deadline to appeal the other decision has not yet expired.

The United States Courts of Appeals for the Sixth, Eighth, Ninth and Tenth Circuits have affirmed dismissals or grants of summary judgment in favor of state officials in four other cases asserting antitrust and constitutional challenges to the allocable share amendment legislation in those states.

Another proceeding has been initiated before an international arbitration tribunal under the provisions of the North American Free Trade Agreement. A hearing on the merits that was scheduled for June 2009 has been continued.

Federal Government’s Lawsuit

In 1999, the United States government filed a lawsuit in the United States District Court for the District of Columbia against various cigarette manufacturers, including PM USA, and others, including Altria Group, Inc. asserting claims under three federal statutes, namely the Medical Care Recovery Act (“MCRA”), the MSP provisions of the Social Security Act and the civil provisions of RICO. Trial of the case ended in June 2005. The lawsuit sought to recover an unspecified amount of health care costs for tobacco-related illnesses allegedly caused by defendants’ fraudulent and tortious conduct and paid for by the government under various federal health care programs, including Medicare, military and veterans’ health benefits programs, and the Federal Employees Health Benefits Program. The complaint alleged that such costs total more than $20 billion annually. It also sought what it alleged to be equitable and declaratory relief, including disgorgement of profits which arose from defendants’ allegedly tortious conduct, an injunction prohibiting certain actions by the defendants, and a declaration that the defendants are liable for the federal government’s future costs of providing health care resulting from defendants’ alleged past tortious and wrongful conduct. In September 2000, the trial court dismissed the government’s MCRA and MSP claims, but permitted discovery to proceed on the government’s claims for relief under the civil provisions of RICO.

The government alleged that disgorgement by defendants of approximately $280 billion is an appropriate remedy. In May 2004, the trial court issued an order denying defendants’ motion for partial summary judgment limiting the disgorgement remedy. In February 2005, a panel of the United States Court of Appeals for the District of Columbia Circuit held that disgorgement is not a remedy available to the government under the civil provisions of RICO and entered summary judgment in favor of defendants with respect to the disgorgement claim. In April 2005, the Court of Appeals denied the government’s motion for rehearing. In July 2005, the government petitioned the United States Supreme Court for further review of the Court of Appeals’ ruling that disgorgement is not an available remedy, and in October 2005, the Supreme Court denied the petition.

In June 2005, the government filed with the trial court its proposed final judgment seeking remedies of approximately $14 billion, including $10 billion over a five-year period to fund a national smoking cessation program and $4 billion over a ten-year period to fund a public education and counter-marketing campaign. Further, the government’s proposed remedy would have required defendants to pay additional monies to these programs if targeted reductions in the smoking rate of those under 21 are not achieved according to a prescribed timetable. The government’s proposed remedies also included a series of measures and restrictions applicable to cigarette business operations—including, but not limited to, restrictions on advertising and marketing, potential measures with respect to certain price promotional activities and research and development, disclosure requirements for certain confidential data and implementation of a monitoring system with potential broad powers over cigarette operations.

 

In August 2006, the federal trial court entered judgment in favor of the government. The court held that certain defendants, including Altria Group, Inc. and PM USA, violated RICO and engaged in 7 of the 8 “sub-schemes” to defraud that the government had alleged. Specifically, the court found that:

 

   

defendants falsely denied, distorted and minimized the significant adverse health consequences of smoking;

 

   

defendants hid from the public that cigarette smoking and nicotine are addictive;

 

   

defendants falsely denied that they control the level of nicotine delivered to create and sustain addiction;

 

   

defendants falsely marketed and promoted “low tar/light” cigarettes as less harmful than full-flavor cigarettes;

 

   

defendants falsely denied that they intentionally marketed to youth;

 

   

defendants publicly and falsely denied that ETS is hazardous to non-smokers; and

 

   

defendants suppressed scientific research.

The court did not impose monetary penalties on the defendants, but ordered the following relief: (i) an injunction against “committing any act of racketeering” relating to the manufacturing, marketing, promotion, health consequences or sale of cigarettes in the United States; (ii) an injunction against participating directly or indirectly in the management or control of the Council for Tobacco Research, the Tobacco Institute, or the Center for Indoor Air Research, or any successor or affiliated entities of each; (iii) an injunction against “making, or causing to be made in any way, any material false, misleading, or deceptive statement or representation or engaging in any public relations or marketing endeavor that is disseminated to the United States public and that misrepresents or suppresses information concerning cigarettes”; (iv) an injunction against conveying any express or implied health message through use of descriptors on cigarette packaging or in cigarette advertising or promotional material, including “lights,” “ultra lights” and “low tar,” which the court found could cause consumers to believe one cigarette brand is less hazardous than another brand; (v) the issuance of “corrective statements” in various media regarding the adverse health effects of smoking, the addictiveness of smoking and nicotine, the lack of any significant health benefit from smoking “low tar” or “light” cigarettes, defendants’ manipulation of cigarette design to ensure optimum nicotine delivery and the adverse health effects of exposure to environmental tobacco smoke; (vi) the disclosure on defendants’ public document websites and in the Minnesota document repository of all documents produced to the government in the lawsuit or produced in any future court or administrative action concerning smoking and health until 2021, with certain additional requirements as to documents withheld from production under a claim of privilege or confidentiality; (vii) the disclosure of disaggregated marketing data to the government in the same form and on the same schedule as defendants now follow in disclosing such data to the FTC for a period of ten years; (viii) certain restrictions on the sale or transfer by defendants of any cigarette brands, brand names, formulas or cigarette businesses within the United States; and (ix) payment of the government’s costs in bringing the action.

In September 2006, defendants filed notices of appeal to the United States Court of Appeals for the District of Columbia Circuit. In September 2006, the trial court denied defendants’ motion to stay the judgment pending defendants’ appeals, and defendants then filed an emergency motion with the Court of Appeals to stay enforcement of the judgment pending their appeals. In October 2006, the government filed a notice of appeal in which it appealed the denial of certain remedies, including the disgorgement of profits and the cessation remedies it had sought. In October 2006, a three-judge panel of the Court of Appeals granted defendants’ motion and stayed the trial court’s judgment pending its review of the decision. Certain defendants, including PM USA and Altria Group, Inc., filed a motion to clarify the trial court’s August 2006 Final Judgment and Remedial Order. In March 2007, the trial court denied in part and granted in part defendants’ post-trial motion for clarification of portions of the court’s remedial order.

In May 2009, a three-judge panel of the Court of Appeals for the District of Columbia Circuit issued a per curiam decision largely affirming the trial court’s judgment against defendants and in favor of the government.

Although the panel largely affirmed the remedial order that was issued by the trial court, it vacated the following aspects of the order:

 

   

its application to defendants’ subsidiaries;

 

   

the prohibition on the use of express or implied health messages or health descriptors, but only to the extent of extraterritorial application;

 

   

its point-of-sale display provisions; and

 

   

its application to Brown & Williamson Holdings.

The Court of Appeals panel remanded the case for the trial court to reconsider these four aspects of the injunction and to reformulate its remedial order accordingly.

Furthermore, the Court of Appeals panel rejected all of the government’s and intervenor’s cross appeal arguments and refused to broaden the remedial order entered by the trial court. The Court of Appeals panel also left undisturbed its prior holding that the government cannot obtain disgorgement as a permissible remedy under RICO.

On July 31, 2009, defendants filed petitions for a rehearing before the panel and for a rehearing by the entire Court of Appeals. Defendants also filed a motion to vacate portions of the trial court’s judgment on the grounds of mootness because of the passage of legislation granting FDA broad authority over the regulation of tobacco products. On September 22, 2009, the Court of Appeals entered three per curiam rulings. Two of them denied defendants’ petitions for panel rehearing or for rehearing en banc. In the third per curiam decision, the Court of Appeals denied defendants’ suggestion of mootness and motion for partial vacatur. On September 28, 2009, defendants petitioned the Court of Appeals to issue a stay of its mandate pending the filing and disposition of petitions for writs of certiorari to the United States Supreme Court. On October 21, 2009, the Court of Appeals granted the motion in part, staying the issuance of the mandate until December 28, 2009. Defendants’ certiorari petitions are scheduled to be filed in December 2009. The trial court’s judgment and remedial orders remain stayed.

“Lights/Ultra Lights” Cases

Overview

Plaintiffs in these class actions (some of which have not been certified as such), allege, among other things, that the uses of the terms “Lights” and/or “Ultra Lights” constitute deceptive and unfair trade practices, common law fraud, or RICO violations, and seek injunctive and equitable relief, including restitution and, in certain cases, punitive damages. These class actions have been brought against PM USA and, in certain instances, Altria Group, Inc. or its subsidiaries, on behalf of individuals who purchased and consumed various brands of cigarettes, including Marlboro Lights, Marlboro Ultra Lights, Virginia Slims Lights and Superslims, Merit Lights and Cambridge Lights. Defenses raised in these cases include lack of misrepresentation, lack of causation, injury, and damages, the statute of limitations, express preemption by the Federal Cigarette Labeling and Advertising Act (“FCLAA”) and implied preemption by the policies and directives of the Federal Trade Commission (“FTC”), non-liability under state statutory provisions exempting conduct that complies with federal regulatory directives, and the First Amendment. As of October 26, 2009, thirty-six cases are pending as follows: Arkansas (3), California (1), Colorado (1), Delaware (1), Florida (3), Illinois (3), Kansas (2), Louisiana (3), Maine (1), Massachusetts (1), Minnesota (1), Mississippi (1), Missouri (1), New Hampshire (1), New Jersey (1), New Mexico (1), New York (3), Oregon (1), Pennsylvania (1), Tennessee (1), Texas (2), West Virginia (2) and Wisconsin (1). In addition, a purported “Lights” class action is pending against PM USA in Israel. Other entities have stated that they are considering filing such actions against Altria Group, Inc. and PM USA.

Developments Since December 2008 Good Decision

Since the December 2008 U.S. Supreme Court decision in Good, sixteen “Lights” class actions have been served upon PM USA and Altria Group, Inc. Two of these cases have been filed in each of three states, Florida (Boyd and Rosenthal), New York (Domaingue and Tang) and Texas (Hanson and Salazar), and one case has been filed in each of ten states, Arkansas (Williams), California (Tyrer), Colorado (Fray), Illinois (Biundo, formerly Goins), Kansas (Gisick), Louisiana (LeBoeuf), Mississippi (Mirick), Pennsylvania (Weber), Tennessee (Alcorn) and Wisconsin (Nikolic). Fifteen of the cases were filed in federal court. The Biundo (formerly Goins) action was filed in state court but removed to federal court and, in May 2009, plaintiff’s motion to amend the complaint was granted after the claims of the initial class representative were dismissed without prejudice.

In addition, plaintiffs, in a case filed in state court in Illinois (Cleary), amended their complaint to assert claims on behalf of an additional sub-class of smokers of “Lights” cigarettes. The case was removed to federal court in March 2009, and the district court denied plaintiffs’ motion to remand in May 2009. In July 2009, the district court dismissed plaintiffs’ “Lights” claims against one defendant and denied plaintiffs’ request to remand the remaining case to state court. On September 21, 2009, the court issued its ruling on PM USA’s and the remaining defendants’ motion for summary judgment as to all “Lights” claims. The court granted the motion as to all defendants except PM USA. As to PM USA, the court granted the motion as to all “Lights” and other low tar brands other than Marlboro Lights. As to Marlboro Lights, the court ordered briefing on why the 2002 state court order dismissing the Marlboro Lights claims should not be vacated based upon Good.

In April 2009, a petition was filed with the Judicial Panel on Multidistrict Litigation (“JPMDL”) seeking to transfer to, and consolidate pretrial proceedings in, the following “Lights” and other cases in the United States District Court for the Eastern District of New York or, alternatively, the Southern District of Florida: Tyrer, Fray, Boyd, Biundo (formerly Goins), Cleary, Good, Schwab, Caronia, Tang, Domaingue and Salazar. On September 11, 2009, the JPMDL granted plaintiffs’ motion to consolidate and transfer, and ordered that eight of the eleven “Lights” cases be consolidated to the U.S. District Court for the District of Maine for pretrial proceedings (“MDL proceeding”). Those cases include: Tyrer, Fray, Boyd, Biundo, Good, Tang, Domaingue and Salazar. Altria Group, Inc. and/or PM USA are the defendants in each of the actions. Three pending cases were excluded from the transfer – Caronia, Cleary and Schwab. On September 23, 2009, the JPMDL issued an order which transferred to the MDL proceeding a total of nine additional actions that were not part of the original April 2009 petition (Alcorn, Hanson, Mirick, Moos, Mulford, Newman, Nikolic, Rosenthal and Williams). In addition, by September 29, and October 14, 2009 orders, the JPMDL transferred the LeBoeuf and Weber cases to the MDL proceeding. Additional federal “Lights” cases may be included in the MDL proceeding.

The Good Case

In May 2006, a federal trial court in Maine granted PM USA’s motion for summary judgment in Good, a purported “Lights” class action, on the grounds that plaintiffs’ claims are preempted by the FCLAA and dismissed the case. In August 2007, the United States Court of Appeals for the First Circuit vacated the district court’s grant of PM USA’s motion for summary judgment on federal preemption grounds and remanded the case to district court. The district court stayed the case pending the United States Supreme Court’s ruling on defendants’ petition for writ of certiorari with the United States Supreme Court, which was granted in January 2008. The case was stayed pending the United States Supreme Court’s decision. In December 2008, the United States Supreme Court ruled that plaintiffs’ claims are not barred by federal preemption. Although the Court rejected the argument that the FTC’s actions were so extensive with respect to the descriptors that the state law claims were barred as a matter of federal law, the Court’s decision was limited: it did not address the ultimate merits of plaintiffs’ claim, the viability of the action as a class action, or other state law issues. In February 2009, the United States Court of Appeals for the First Circuit remanded Good to the district court for further proceedings. As discussed above, various other “Lights” cases were consolidated with Good in the U.S. District Court for the District of Maine for pretrial proceedings and more may be added as a result of the MDL proceeding discussed above.

“Lights” Cases Dismissed, Not Certified or Ordered De-Certified

To date, 13 courts in 14 cases have refused to certify class actions, dismissed class action allegations, reversed prior class certification decisions or have entered judgment in favor of PM USA. Trial courts in Arizona, Kansas, New Mexico, Oregon, Tennessee, Washington and New Jersey have refused to certify a class, an appellate court in Florida has overturned class certification by a trial court, the Ohio Supreme Court has overturned class certifications in the Marrone and Phillips cases (in May 2009, the trial court denied the Marrone and Phillips plaintiffs’ motions for leave to amend their complaints to assert class action claims; the plaintiffs voluntarily dismissed these two cases on August 10, 2009), a trial court in Tennessee has dismissed the plaintiffs’ class action allegations, the United States Court of Appeals for the Fifth Circuit has dismissed a purported “Lights” class action brought in Louisiana federal court (Sullivan) on the grounds that plaintiffs’ claims were preempted by the FCLAA, plaintiffs voluntarily dismissed an action in a federal trial court in Michigan after the court dismissed claims asserted under the Michigan Unfair Trade and Consumer Protection Act, and the Supreme Court of Illinois has overturned a judgment in favor of a plaintiff class in the Price case (see the Price case below for further discussion). In September 2006, the trial court in Schwab denied defendants’ summary judgment motions and granted plaintiffs’ motion for certification of a nationwide class of all United States residents that purchased cigarettes in the United States that were labeled “Light” or “Lights.” In April 2008, the Second Circuit overturned the trial court’s class certification decision. An intermediate appellate court in Oregon and the Supreme Court in Washington have denied plaintiffs’ motions for interlocutory review of the trial courts’ refusals to certify a class. In the Oregon case (Pearson), in February 2007, PM USA filed a motion for summary judgment based on federal preemption and the Oregon statutory exemption. In September 2007, the District Court granted PM USA’s motion based on express preemption under the FCLAA, and plaintiffs appealed this dismissal to the Oregon Court of Appeals. In February 2008, the parties filed a joint motion to hold the appeal in abeyance pending the United States Supreme Court’s decision in Good, which motion was denied. Plaintiffs in the case in Washington voluntarily dismissed the case with prejudice. Plaintiffs in the New Mexico case (Mulford) renewed their motion for class certification, which motion was denied by the federal district court in March 2009, with leave to file a new motion for class certification. Plaintiffs in the Florida case (Hines) petitioned the Florida Supreme Court for further review, and in January 2008, the Florida Supreme Court denied this petition. In February 2009, the plaintiffs’ class action allegations in the Tennessee case (McClure) were dismissed with prejudice. In Cleary, discussed above, PM USA has moved to dismiss the “Lights” claims made against it (USSTC is also a defendant in Cleary with respect to non-“Lights” claims).

The Price Case

Trial in the Price case commenced in state court in Illinois in January 2003, and in March 2003, the judge found in favor of the plaintiff class and awarded $7.1 billion in compensatory damages and $3 billion in punitive damages against PM USA. In connection with the judgment, PM USA deposited into escrow various forms of collateral, including cash and negotiable instruments. In December 2005, the Illinois Supreme Court issued its judgment, reversing the trial court’s judgment in favor of the plaintiffs and directing the trial court to dismiss the case. In May 2006, the Illinois Supreme Court denied plaintiffs’ motion for re-hearing, in November 2006, the United States Supreme Court denied plaintiffs’ petition for writ of certiorari and, in December 2006, the Circuit Court of Madison County enforced the Illinois Supreme Court’s mandate and dismissed the case with prejudice. In January 2007, plaintiffs filed a motion to vacate or withhold judgment based upon the United States Supreme Court’s grant of the petition for writ of certiorari in Watson (described below). In May 2007, PM USA filed applications for a writ of mandamus or a supervisory order with the Illinois Supreme Court seeking an order compelling the lower courts to deny plaintiffs’ motion to vacate and/or withhold judgment. In August 2007, the Illinois Supreme Court granted PM USA’s motion for supervisory order and the trial court dismissed plaintiff’s motion to vacate or withhold judgment. The collateral that PM USA deposited into escrow after the initial 2003 judgment has since been released and returned to PM USA.

In December 2008, plaintiffs filed with the trial court a petition for relief from the final judgment that was entered in favor of PM USA. Specifically, plaintiffs sought to vacate the 2005 Illinois Supreme Court judgment, contending that the United States Supreme Court’s December 2008 decision in Good demonstrated that the Illinois Supreme Court’s decision was “inaccurate.” PM USA filed a motion to dismiss plaintiffs’ petition and, in February 2009, the trial court granted PM USA’s motion. In March 2009, the Price plaintiffs filed a notice of appeal with the Fifth Judicial District of the Appellate Court of Illinois.

In June 2009, the plaintiff in an individual smoker lawsuit (Kelly) brought on behalf of an alleged smoker of “Lights” cigarettes in Madison County, Illinois state court filed a motion seeking a declaration that (1) his claims under the Illinois Consumer Fraud Act are not barred by the exemption in that statute based on his assertion that the Illinois Supreme Court’s decision in Price is no longer good law in light of the decisions by the U.S. Supreme Court in Good and Watson, and (2) their claims are not preempted in light of the U.S. Supreme Court’s decision in Good. On September 8, 2009, the court granted plaintiff’s motion as to federal preemption, but denied it with respect to the state statutory exemption.

Trial Court Class Certifications

Trial courts have certified classes against PM USA in Massachusetts (Aspinall), Minnesota (Curtis), and Missouri (Craft). PM USA has appealed or otherwise challenged these class certification orders. Significant developments in these cases include:

Aspinall: In August 2004, the Massachusetts Supreme Judicial Court affirmed the class certification order. In August 2006, the trial court denied PM USA’s motion for summary judgment and granted plaintiffs’ motion for summary judgment on the defenses of federal preemption and a state law exemption to Massachusetts’ consumer protection statute. On motion of the parties, the trial court subsequently reported its decision to deny summary judgment to the appeals court for review and stayed further proceedings pending completion of the appellate review. In December 2008, subsequent to the United States Supreme Court’s decision in Good, the Massachusetts Supreme Judicial Court issued an order requesting that the parties advise the court within 30 days whether the Good decision is dispositive of federal preemption issues pending on appeal. In January 2009, PM USA notified the Massachusetts Supreme Judicial Court that Good is dispositive of the federal preemption issues on appeal, but requested further briefing on the state law statutory exemption issue. In March 2009, the Massachusetts Supreme Judicial Court affirmed the order denying summary judgment to PM USA and granting the plaintiffs’ cross-motion.

Curtis: In April 2005, the Minnesota Supreme Court denied PM USA’s petition for interlocutory review of the trial court’s class certification order. On October 14, 2009, the trial court denied plaintiffs’ motion for partial summary judgment, filed in February 2009, claiming collateral estoppel from the findings in the case brought by the Department of Justice (see Federal Government’s Lawsuit described above). On October 21, 2009, the trial court granted PM USA’s motion for partial summary judgment, filed on August 17, 2009, as to all consumer protection counts. The court has set a trial date of October 25, 2010.

Craft: In August 2005, a Missouri Court of Appeals affirmed the class certification order. Plaintiffs have moved for reconsideration of the period during which potential class members can qualify to become part of the class to expand it from 1998 – 2005 to 1971 – 2005. The court set a trial date of January 11, 2011.

In addition to these cases, in June 2007, the United States Supreme Court reversed the lower court rulings in the Watson case that denied plaintiffs’ motion to have the case heard in a state, as opposed to federal, trial court. The Supreme Court rejected defendant’s contention that the case must be tried in federal court under the “federal officer” statute. The case has been remanded to the state trial court in Arkansas. In December 2005, in the Miner case, which was pending at that time in the United States District Court for the Western District of Arkansas, plaintiffs moved for certification of a class composed of individuals who purchased Marlboro Lights or Cambridge Lights brands in Arkansas, California, Colorado, and Michigan. PM USA’s motion for summary judgment based on preemption and the Arkansas statutory exemption is pending. Following the filing of this motion, plaintiffs moved to voluntarily dismiss Miner without prejudice, which PM USA opposed. The court then stayed the case pending the United States Supreme Court’s decision on a petition for writ of certiorari in Watson. In July 2007, the case was remanded to a state trial court in Arkansas. In August 2007, plaintiffs renewed their motion for class certification. In October 2007, the court denied PM USA’s motion to dismiss on procedural grounds and the court entered a case management order.

Certain Other Tobacco-Related Litigation

Tobacco Price Cases: As of October 26, 2009, two separate cases were pending, one in Kansas and one in New Mexico, in which plaintiffs allege that defendants, including PM USA, conspired to fix cigarette prices in violation of antitrust laws. Altria Group, Inc. is a defendant in the case in Kansas. Plaintiffs’ motions for class certification have been granted in both cases. In June 2006, defendants’ motion for summary judgment was granted in the New Mexico case. In November 2008, the New Mexico Court of Appeals reversed the trial court decision granting summary judgment as to certain defendants, including PM USA. In February 2009, the New Mexico Supreme Court granted the petition for writ of certiorari filed by PM USA and the other defendants. The case in Kansas is pending; there is no trial date.

Cases Under the California Business and Professions Code: In June 1997, a lawsuit (Brown) was filed in California state court alleging that domestic cigarette manufacturers, including PM USA and others, have violated California Business and Professions Code Sections 17200 and 17500 regarding unfair, unlawful and fraudulent business practices. Class certification was granted as to plaintiffs’ claims that class members are entitled to reimbursement of the costs of cigarettes purchased during the class periods and injunctive relief. In September 2004, the trial court granted defendants’ motion for summary judgment as to plaintiffs’ claims attacking defendants’ cigarette advertising and promotion and denied defendants’ motion for summary judgment on plaintiffs’ claims based on allegedly false affirmative statements. Plaintiffs’ motion for rehearing was denied. In March 2005, the court granted defendants’ motion to decertify the class based on a California law, which inter alia limits the ability to bring a lawsuit to only those plaintiffs who have “suffered injury in fact” and “lost money or property” as a result of defendant’s alleged statutory violations (“Proposition 64”). In two July 2006 opinions, the California Supreme Court held Proposition 64 applicable to pending cases (the “Proposition 64 Cases”). Plaintiffs’ motion for reconsideration of the order that decertified the class was denied, and plaintiffs appealed. In September 2006, an intermediate appellate court affirmed the trial court’s order decertifying the class. In May 2009, the California Supreme Court reversed the trial court decision that was affirmed by the appellate court and remanded the case to the trial court. Defendants filed a rehearing petition in June 2009. On August 12, 2009, the California Supreme Court denied defendants’ rehearing petition and issued its mandate.

 

In May 2004, a lawsuit (Gurevitch) was filed in California state court on behalf of a purported class of all California residents who purchased the Merit brand of cigarettes since July 2000 to the present alleging that defendants, including PM USA, violated California’s Business and Professions Code Sections 17200 and 17500 regarding unfair, unlawful and fraudulent business practices, including false and misleading advertising. The complaint also alleges violations of California’s Consumer Legal Remedies Act. Plaintiffs seek injunctive relief, disgorgement, restitution, and attorneys’ fees. In July 2005, defendants’ motion to dismiss was granted; however, plaintiffs’ motion for leave to amend the complaint was also granted, and plaintiffs filed an amended complaint in September 2005. In October 2005, the court stayed this action pending the California Supreme Court’s rulings in the Proposition 64 Cases. In September 2006, the stay was lifted and defendants filed their demurrer to plaintiffs’ amended complaint. In March 2007, the court, without ruling on the demurrer, again stayed the action pending rulings from the California Supreme Court in another case involving Proposition 64 (Brown, described above) that is relevant to PM USA’s demurrer. After the California Supreme Court’s decision in Brown, the case reactivated and on August 24, 2009, PM USA filed its demurrer to plaintiffs’ amended complaint.

Ignition Propensity Cases: PM USA is currently a defendant in six wrongful death actions in which plaintiffs contend that fires caused by cigarettes led to other individuals’ deaths. In one case pending in federal court in Massachusetts (Sarro), the district court on August 13, 2009 granted in part PM USA’s motion to dismiss, but ruled that two claims unrelated to product design could go forward. In a Kentucky federal court case (Walker), the court dismissed plaintiffs’ claims in February 2009 and plaintiffs subsequently filed a notice of appeal. On September 10, 2009 the appeals court dismissed plaintiffs’ appeal for want of prosecution. Plaintiffs are seeking reinstatement of the appeal. The four remaining actions are Green and Hallmark (each filed in April 2009 in Alabama state court), Kerr (filed in Mississippi state court in February 2009 and removed by PM USA to Mississippi federal court in July 2009) and Villarreal (filed in Texas state court on July 1, 2009 against Altria Group, Inc. and PM USA and removed by PM USA to federal court on August 17, 2009). Plaintiff’s motion to remand is pending.

UST Litigation

Types of Cases

Claims related to smokeless tobacco products generally fall within the following categories:

First, UST and/or its tobacco subsidiaries has been named in certain health care cost reimbursement/third-party recoupment/class action litigation against the major domestic cigarette companies and others seeking damages and other relief. The complaints in these cases on their face predominantly relate to the usage of cigarettes; within that context, certain complaints contain a few allegations relating specifically to smokeless tobacco products. These actions are in varying stages of pretrial activities.

Second, UST and/or its tobacco subsidiaries has been named in certain actions in West Virginia brought on behalf of individual plaintiffs against cigarette manufacturers, smokeless tobacco manufacturers, and other organizations seeking damages and other relief in connection with injuries allegedly sustained as a result of tobacco usage, including smokeless tobacco products. Included among the plaintiffs are five individuals alleging use of USSTC’s smokeless tobacco products and alleging the types of injuries claimed to be associated with the use of smokeless tobacco products. While certain of these actions had not been consolidated for pretrial and trial proceedings, USSTC, along with other non-cigarette manufacturers, has remained severed from such proceedings since December 2001.

Third, UST and/or its tobacco subsidiaries has been named in a number of other individual tobacco and health suits. Plaintiffs’ allegations of liability in these cases are based on various theories of recovery, such as negligence, strict liability, fraud, misrepresentation, design defect, failure to warn, breach of implied warranty, addiction, and breach of consumer protection statutes. Plaintiffs seek various forms of relief, including compensatory and punitive damages, and certain equitable relief, including but not limited to disgorgement. Defenses raised in these cases include lack of causation, assumption of the risk, comparative fault and/or contributory negligence, and statutes of limitations. USSTC is currently named in an action in Florida (Vassallo) and in an action in Connecticut (Hill). Trial in the Hill case is set to commence in December 2010.

Antitrust Litigation

Following a previous antitrust action brought against UST and certain of its tobacco subsidiaries by a competitor, Conwood Company L.P., UST and certain of its tobacco subsidiaries were named as defendants in certain actions brought by indirect purchasers (consumers) in a number of jurisdictions. As indirect purchasers of USSTC’s smokeless tobacco products during various periods of time ranging from January 1990 to the date of certification or potential certification of the proposed classes, plaintiffs in those actions allege, individually and on behalf of putative class members in a particular state or individually and on behalf of class members in the applicable states, that UST and certain of its tobacco subsidiaries violated the antitrust laws, unfair and deceptive trade practices statutes and/or common law of those states. In connection with these actions, plaintiffs sought to recover compensatory and statutory damages in an amount not to exceed $75,000 per purported class member or per class member, and certain other relief. The indirect purchaser actions, as filed, were similar in all material respects.

The indirect purchaser actions have been resolved in all jurisdictions.

In January 2008, UST entered into a Settlement Agreement to resolve the New Hampshire action. In July 2008, the court entered a final judgment granting final approval of the settlement, including attorneys’ fees and costs, and dismissing the action with prejudice. A Notice of Appeal was filed by an individual class member in August 2008. In April 2009, the New Hampshire Supreme Court affirmed the trial court order and final judgment approving the class action settlement in this indirect purchaser antitrust case. In May 2009, the New Hampshire Supreme Court modified the final judgment to extend the deadline until December 31, 2009, for class members to submit claims.

In April 2009, UST entered into a Settlement Agreement to resolve the Massachusetts action. No objections to the proposed settlement were filed. The settlement received final court approval on October 23, 2009, and UST has paid the total amount of the approximately $10.6 million proposed cash settlement, for which it had previously recognized a liability.

Pursuant to the settlements in all jurisdictions except California and Massachusetts, adult consumers received or will receive coupons redeemable on future purchases of USSTC’s moist smokeless tobacco products, and UST agreed to pay all related administrative costs and plaintiffs’ attorneys’ fees. The California and Massachusetts settlements are for cash only and do not involve distribution of coupons.

In connection with the settlement of the Kansas, New Hampshire, New York and Wisconsin actions, UST has recognized a liability reflecting the costs attributable to coupons previously distributed to Kansas, New York and Wisconsin class members, and coupons expected to be distributed to New Hampshire class members, which will be redeemable on future purchases of USSTC’s moist smokeless tobacco products, as well as plaintiffs’ attorneys’ fees and other administrative costs of the settlement.

As of September 30, 2009, the liability associated with UST’s estimated costs to resolve all indirect purchaser actions was $9.1 million.

 

Other Litigation

In September 2008, plaintiffs filed a purported class action on behalf of a purported class of UST stockholders in Superior Court in Connecticut to enjoin the proposed acquisition of UST by Altria Group, Inc., alleging, among other things, that UST and/or nine of its directors had violated their fiduciary duties by agreeing to the terms of the acquisition and that Altria Group, Inc. had aided and abetted in the alleged violation. In October 2008, plaintiffs amended the complaint to add allegations concerning UST’s definitive proxy statement and certain benefits payable to UST’s officers in connection with the transaction. The amended complaint also included aiding and abetting claims against UST. In December 2008, the parties entered into a Memorandum of Understanding to settle this lawsuit and resolve all claims. The settlement amount was immaterial. A final settlement hearing was held on October 26, 2009, at which the court stated that it would approve the settlement in an order to follow.

Certain Other Actions

IRS Challenges to PMCC Leases: The IRS concluded its examination of Altria Group, Inc.’s consolidated tax returns for the years 1996 through 1999, and issued a final Revenue Agent’s Report (“RAR”) in March 2006. The RAR disallowed benefits pertaining to certain PMCC leveraged lease transactions for the years 1996 through 1999. Altria Group, Inc. agreed with all conclusions of the RAR, with the exception of the disallowance of benefits pertaining to several PMCC leveraged lease transactions for the years 1996 through 1999. Altria Group, Inc. contests approximately $150 million of tax and net interest assessed and paid with regard to them. The IRS may in the future challenge and disallow more of PMCC’s leveraged lease benefits based on Revenue Rulings, an IRS Notice and subsequent case law addressing specific types of leveraged leases (lease-in/lease-out (“LILO”) and sale-in/lease-out (“SILO”) transactions).

In October 2006, Altria Group, Inc. filed a complaint in the United States District Court for the Southern District of New York to claim refunds on a portion of these tax payments and associated interest for the years 1996 and 1997. On July 9, 2009, the jury returned a unanimous verdict in favor of the IRS. On July 31, 2009, Altria Group, Inc. filed motions for judgment as a matter of law or, in the alternative, for a new trial.

In March 2008, Altria Group, Inc. filed a second complaint in the United States District Court for the Southern District of New York seeking a refund of the tax payments and associated interest for the years 1998 and 1999 attributable to the disallowance of benefits claimed in those years with respect to the leases subject to the recent jury verdict and with respect to certain other leases entered into in 1998 and 1999.

The IRS has indicated that it intends to issue an RAR regarding its audit of Altria Group, Inc.’s consolidated tax returns for the 2000 – 2003 years within the next three months. Based on Notices of Proposed Adjustments received by Altria Group, Inc., we expect that this RAR will challenge and disallow tax benefits claimed by Altria Group, Inc. with respect to the leases subject to the recent jury verdict plus other PMCC leveraged lease transactions characterized by the IRS as LILOs and SILOs, including benefits claimed from LILO and SILO transactions entered into during both the 1996 – 1999 years and the 2000 – 2003 years. The total disallowance for 2000 – 2003 for these leases in federal income tax and related interest would be approximately $1.0 billion. Altria Group, Inc. plans to contest proposed leveraged lease adjustments contained in any RAR.

If the tax benefits for the transactions entered into from 1996 to 2003 were similarly disallowed for the period January 1, 2004 through December 31, 2009, the disallowance for such period for these leases in federal income tax and related interest would be approximately $900 million, taking into account federal income tax paid or payable on gains associated with sales of leased assets during that period. The payment, if any, of such amount would depend upon the timing and outcome of future IRS audits and any related administrative challenges or litigation.

LILO and SILO transactions represent approximately 37% of the Net Finance Assets of PMCC’s lease portfolio. PMCC entered into no LILO or SILO transactions after 2003.

 

Altria Group, Inc. considered these matters in its treatment of FASB Interpretation No. 48 and FASB Staff Position No. FAS 13-2. Should Altria Group, Inc. not prevail in these matters, Altria Group, Inc. may have to accelerate the payment of significant amounts of federal income tax, pay associated interest costs and significantly lower its earnings to reflect the recalculation of the income from the affected leveraged leases, which could have a material effect on the earnings and cash flows of Altria Group, Inc. in a particular fiscal quarter or fiscal year.

Kraft Thrift Plan Case: Four participants in the Kraft Foods Global, Inc. Thrift Plan (“Kraft Thrift Plan”), a defined contribution plan, filed a class action complaint on behalf of all participants and beneficiaries of the Kraft Thrift Plan in July 2008 in the United States District Court for the Northern District of Illinois alleging breach of fiduciary duty under the Employee Retirement Income Security Act (“ERISA”). Named defendants in this action include Altria Corporate Services, Inc. (now Altria Client Services Inc.) and certain company committees that allegedly had a relationship to the Kraft Thrift Plan. Plaintiffs request, among other remedies, that defendants restore to the Kraft Thrift Plan all losses improperly incurred. The Altria Group, Inc. defendants deny any violation of ERISA or other unlawful conduct and intend to defend the case vigorously. Under the terms of a Distribution Agreement between Altria Group, Inc. and Kraft, Altria Client Services Inc. and related defendants may be entitled to indemnity against any liabilities incurred in connection with this case.

Environmental Regulation

Altria Group, Inc. and its subsidiaries (and former subsidiaries) are subject to various federal, state and local laws and regulations concerning the discharge of materials into the environment, or otherwise related to environmental protection, including, in the United States: The Clean Air Act, the Clean Water Act, the Resource Conservation and Recovery Act and the Comprehensive Environmental Response, Compensation and Liability Act (commonly known as “Superfund”), which can impose joint and several liability on each responsible party. Subsidiaries (and former subsidiaries) of Altria Group, Inc. are involved in several matters subjecting them to potential costs of remediation and natural resource damages under Superfund or other laws and regulations. Altria Group, Inc.’s subsidiaries expect to continue to make capital and other expenditures in connection with environmental laws and regulations. Although it is not possible to predict precise levels of environmental-related expenditures, compliance with such laws and regulations, including the payment of any remediation costs or damages and the making of such expenditures, has not had, and is not expected to have, a material adverse effect on Altria Group, Inc.’s consolidated results of operations, capital expenditures, financial position, earnings or competitive position.

Guarantees

At September 30, 2009, Altria Group, Inc. had a $12 million third-party guarantee, related to a divestiture, which was recorded as a liability on its condensed consolidated balance sheet. This guarantee has no specified expiration date. Altria Group, Inc. is required to perform under this guarantee in the event that a third party fails to make contractual payments. In the ordinary course of business, certain subsidiaries of Altria Group, Inc. have agreed to indemnify a limited number of third parties in the event of future litigation. At September 30, 2009, subsidiaries of Altria Group, Inc. were also contingently liable for $25 million of guarantees related to their own performance, consisting primarily of surety bonds. These items have not had, and are not expected to have, a significant impact on Altria Group, Inc.’s liquidity.

Under the terms of a distribution agreement between Altria Group, Inc. and PMI, entered into as a result of the PMI spin-off, liabilities concerning tobacco products will be allocated based in substantial part on the manufacturer. PMI will indemnify Altria Group, Inc. and PM USA for liabilities related to tobacco products manufactured by PMI or contract manufactured for PMI by PM USA, and PM USA will indemnify PMI for liabilities related to tobacco products manufactured by PM USA, excluding tobacco products contract manufactured for PMI. Altria Group, Inc. does not have a related liability recorded on its condensed consolidated balance sheet at September 30, 2009 as the fair value of this indemnification is insignificant.

As more fully discussed in Note 16. Condensed Consolidating Financial Information, PM USA has issued guarantees relating to Altria Group, Inc.’s obligations under its outstanding debt securities and borrowings under the Revolving Facility and its commercial paper program.

Redeemable Noncontrolling Interest

In September 2007, UST completed the acquisition of Stag’s Leap Wine Cellars through one of its consolidated subsidiaries, Michelle-Antinori, LLC (“Michelle-Antinori”), in which UST holds an 85% ownership interest with a 15% noncontrolling interest held by Antinori California (“Antinori”). In connection with the acquisition of Stag’s Leap Wine Cellars, UST entered into a put arrangement with Antinori. The put arrangement, as later amended, provides Antinori with the right to require UST to purchase its 15% ownership interest in Michelle-Antinori at a price equal to Antinori’s initial investment of $27 million. The put arrangement becomes exercisable beginning September 11, 2010. As of September 30, 2009, the redemption value of the put arrangement did not exceed the noncontrolling interest balance. Therefore, no adjustment to the value of the redeemable noncontrolling interest was recognized in the condensed consolidated balance sheet for the put arrangement.

The noncontrolling interest put arrangement is accounted for as mandatorily redeemable securities because redemption is outside of the control of UST. As such, the redeemable noncontrolling interest is reported in the mezzanine equity section in the condensed consolidated balance sheet at September 30, 2009.

2 Aon Corp

16.                                 Contingencies

 

Aon and its subsidiaries are subject to numerous claims, tax assessments, lawsuits and proceedings that arise in the ordinary course of business.  The damages claimed in these matters are or may be substantial, including, in many instances, claims for punitive, treble or extraordinary damages.  Aon has purchased errors and omissions (“E&O”) insurance and other appropriate insurance to provide protection against certain losses that arise in such matters.  Accruals for these items, and related insurance receivables, when applicable, have been provided to the extent that losses are deemed probable and are reasonably estimable.  These accruals and receivables are adjusted from time to time as developments warrant.  Amounts related to settlement provisions are recorded in other general expenses in the condensed consolidated statements of income.

 

At the time of the 2004-05 investigation of the insurance industry by the Attorney General of New York (“NYAG”) and other regulators, purported classes of clients filed civil litigation against Aon and other companies under a variety of legal theories, including state tort, contract, fiduciary duty, antitrust and statutory theories and federal antitrust and Racketeer Influenced and Corrupt Organizations Act (“RICO”) theories.  The federal actions were consolidated in the U.S. District Court for the District of New Jersey, and a state court collective action was filed in California.  In the New Jersey actions, the Court dismissed plaintiffs’ federal antitrust and RICO claims in separate orders in August and October 2007, respectively.  Plaintiffs have appealed these dismissals.  Aon believes it has meritorious defenses in all of these cases and intends to vigorously defend itself against these claims.  The outcome of these lawsuits, and any losses or other payments that may occur as a result, cannot be predicted at this time.

 

Also at the time of the NYAG investigation, putative classes filed actions against Aon in the U.S. District Court for the Northern District of Illinois under the federal securities laws and ERISA.  Plaintiffs in the federal securities class action submitted purported expert reports estimating a range of alleged damages of $353 million to $490 million, and plaintiffs in the ERISA class actions submitted revised purported expert reports estimating a range of alleged damages of $74 million to $349 million.  In the ERISA case, Aon submitted expert reports in opposition concluding that plaintiffs’ theories of liability and causation are meritless and that, in any event, plaintiffs incurred no damages.  The parties are in the final stages of expert discovery and trial is likely to be scheduled within the first half of 2010.  In the securities case, Aon reached agreement on a proposed settlement under which Aon would pay $30 million to the class.  Notice has been provided to class members advising of the proposed settlement, which has received preliminary approval by the district court.  A final hearing and fairness determination has been scheduled for November 17, 2009.  The outcome of these lawsuits, and any losses or other payments that may occur as a result, cannot be predicted at this time.

 

Following inquiries from regulators, the Company commenced an internal review of its compliance with certain U.S. and non-U.S. anti-corruption laws, including the U.S. Foreign Corrupt Practices Act (“FCPA”).  The U.S. Securities and Exchange Commission (“SEC”), and the U.S. Department of Justice (“DOJ”), continue to investigate these matters.  Aon is fully cooperating with these investigations and has agreed with the U.S. agencies to toll any applicable statute of limitations pending completion of the investigations.  Based on current information, the Company is unable to predict at this time when the SEC and DOJ matters will be concluded, or what regulatory or other outcomes may result.

 

A putative class action, Buckner v. Resource Life, is pending in state court in Columbus, Georgia against a former subsidiary of Aon, Resource Life Insurance Company.  The complaint alleges that Resource Life, which wrote policies insuring repayment of auto loans, was obligated to identify and return unearned premium to policyholders whose loans terminated before the end of their scheduled terms.  In connection with the sale of Resource Life in 2006, Aon agreed to indemnify Resource Life’s buyer in certain respects relating to this action.  Aon believes that Resource Life has meritorious defenses and Resource Life is vigorously defending this action.  In October 2009, the court certified a nationwide class of policyholders whose loans terminated before the end of their scheduled terms and who Resource Life cannot prove received a refund of unearned premium. Resource Life will appeal. Also in October 2009, Aon filed a lawsuit in Illinois state court seeking a declaratory judgment with respect to the rights and obligations of Aon and Resource Life under the indemnity agreement. The outcome of the actions, and the amount of any losses or other payments that may result, cannot be predicted at this time.

 

Although the ultimate outcome of all matters referred to above cannot be ascertained, and liabilities in indeterminate amounts may be imposed on Aon or its subsidiaries, on the basis of present information, amounts already provided, availability of insurance coverages and legal advice received, it is the opinion of management that the disposition or ultimate determination of such claims will not have a material adverse effect on the consolidated financial position of Aon.  However, it is possible that future results of operations or cash flows for any particular quarterly or annual period could be materially affected by an unfavorable resolution of these matters.

3 C H ROBINSON WORLDWIDE INC

3. Litigation

Gender Discrimination Lawsuit—As we previously disclosed, certain gender discrimination class claims were settled in 2006. The settlement was within our insurance coverage limits, and was fully funded by insurance.

Although the gender class settlement was fully funded by insurance, those insurers reserved the right to seek a court ruling that a portion of the settlement was not covered under their policies, and also to dispute payment of certain defense costs incurred in that litigation. Insurance coverage litigation between us and one of our insurance carriers concerning these issues and insurance coverage for individual lawsuits that were not part of the class settlement has been pending in Minnesota State Court. Recent court rulings have determined that the gender class settlement payment was appropriately covered under applicable policies, and that the insurance carrier has a duty to reimburse reasonable defense costs in the gender class action in all but two of the individual lawsuits. This ruling is being appealed by the insurance carrier.

The settlement of the gender discrimination class claims did not include claims of putative class members who subsequently filed individual Equal Employment Opportunity Commission (EEOC) charges after the denial of class status. Fifty-four of those EEOC claimants filed lawsuits. Fifty-three of those suits have been settled or dismissed. The settlement amounts were not material to our financial position, results of operations, or cash flows. We are vigorously defending the remaining lawsuit.

Accident Litigation—On March 20, 2009 a jury in Will County, Illinois entered a verdict of $23.75 million against us, a federally authorized motor carrier with which we contracted, and the motor carrier’s driver. The award was entered in favor of three named plaintiffs following a consolidated trial, stemming from an accident that occurred on April 1, 2004. The motor carrier and the driver both admitted that at the time of the accident the driver was acting as an agent for the motor carrier, and that the load was being transported according to the terms of our contract with the motor carrier. Our contract clearly defined the motor carrier as an independent contractor. The verdict has the effect of holding us vicariously liable for the damages caused by the admitted negligence of the motor carrier and its driver. There were no claims that our selection or retention of the motor carrier was negligent.

Given our prior experience with claims of this nature, we believe the court erred in allowing theses claims to be considered by a jury. As a result we are vigorously pursuing all available legal avenues by which we may obtain relief from the verdict. On September 15, 2009, the trial court entered an order denying substantially all of the relief which we had requested in our post-trial motions. Now that the trial court has concluded its handling of the matter, we are entitled to and will be seeking relief from the verdict from the Illinois Court of Appeals.

Under the terms of the insurance program which we had in place in 2004 we would be responsible for the first $5.0 million of claims of this nature. Because there are multiple potential outcomes, many of which are reasonably possible, but none of which we believe is probable, we have not recorded a liability for this claim at this time.

We are not subject to any other pending or threatened litigation other than routine litigation arising in the ordinary course of our business operations, none of which is expected to have a material adverse effect on our financial condition, results of operations, or cash flows.

4 CARDINAL HEALTH INC

9. CONTINGENT LIABILITIES

Legal Proceedings

In addition to commitments and obligations in the ordinary course of business, the Company is subject to various claims, other pending and potential legal actions for damages, investigations relating to governmental laws and regulations and other matters arising out of the normal conduct of its business. When accruing for contingencies related to litigation, the Company considers the degree of probability and range of possible loss. An estimated loss contingency is accrued in the Company’s consolidated financial statements if it is probable that a liability has been incurred and the amount of the loss can be reasonably estimated. Because litigation is inherently unpredictable and unfavorable resolutions could occur, assessing contingencies is highly subjective and requires judgments about future events. The Company regularly reviews contingencies to determine the adequacy of the accruals and related disclosures. The amount of ultimate loss may differ from these estimates. It is possible that cash flows or results of operations could be materially affected in any particular period by the unfavorable resolution of one or more of these contingencies.

The Company recognizes income from the favorable outcome of legal settlements, judgments or other resolution of legal and regulatory matters when the associated cash or assets are received.

Estimated loss contingencies related to litigation and regulatory matters and income from favorable resolution of legal and regulatory matters are recognized in litigation (credits)/charges, net in the Company’s condensed consolidated statements of earnings.

Income Taxes

See Note 8 for discussion of contingencies related to the Company’s income taxes.

Other Matters

The Company also becomes involved from time-to-time in litigation and regulatory matters incidental to its business, including, but not limited to, personal injury claims, employment matters, commercial disputes, intellectual property matters, inclusion as a potentially responsible party for environmental clean-up costs, and litigation in connection with acquisitions and divestitures. The Company intends to vigorously defend itself against such litigation and does not currently believe that the outcome of any such litigation will have a material adverse effect on the Company’s consolidated financial statements.

From time to time, the Company receives subpoenas or requests for information from various government agencies relating to the business, accounting or disclosure practices of customers or suppliers. The responses to these subpoenas and requests for information sometimes require considerable time and effort, and can result in considerable costs being incurred by the Company. The Company expects to incur additional costs in the future in connection with existing and future requests. Such subpoenas and requests also can lead to the assertion of claims or the commencement of legal proceedings against the Company.

Also from time to time, the Company may determine that products marketed, manufactured, or distributed by the Company may not meet Company specifications, published standards or regulatory requirements. In such circumstances, the Company will investigate and take appropriate corrective action. Such actions can lead to costs to repair or replace affected products, temporary interruptions in product sales and action by regulators, and can impact results of operations.

5 CME GROUP INC.

8. Contingencies

Legal Matters. There were two purported class action complaints pending against the former NYMEX Holdings, the former NYMEX Holdings board of directors and CME Group in the Delaware Court of Chancery related to the merger between CME Group and NYMEX Holdings. One of the class actions was brought on behalf of the former NYMEX Holdings’ shareholders and the second class action was brought on behalf of the NYMEX Class A members. On September 30, 2009, the Delaware Court of Chancery granted the defendants’ motions to dismiss the shareholders’ and the NYMEX Class A members’ complaints. The court’s decision remains subject to appeal.

On October 14, 2003, the U.S. Futures Exchange, L.L.C. (Eurex U.S.) and U.S. Exchange Holdings, Inc., filed suit against CBOT and CME in the United States District Court for the District of Columbia. The suit alleges that CBOT and CME violated the antitrust laws and tortiously interfered with the business relationship and contract between Eurex U.S. and The Clearing Corporation. Eurex U.S. and U.S. Exchange Holdings, Inc. are seeking a preliminary injunction and treble damages. On December 12, 2003, CBOT and CME filed separate motions to dismiss or, in the event the motion to dismiss is denied, to move the venue to the United States District Court for the Northern District of Illinois. On September 2, 2004, the judge granted CBOT’s and CME’s motions to transfer venue to the Northern District of Illinois. In light of that decision, the judge did not rule on the motions to dismiss. On March 25, 2005, Eurex U.S. filed a second amended complaint in the United States District Court for the Northern District of Illinois. On June 6, 2005, CME and CBOT filed a motion to dismiss the complaint. On August 25, 2005, the judge denied the joint CME/CBOT motion to dismiss. On April 9, 2007, CME and CBOT filed two joint motions for summary judgment. The parties continue to engage in discovery. Based on its investigation to date and advice from legal counsel, the company believes this suit is without merit and intends to defend itself vigorously against these charges.

On August 19, 2008, Fifth Market filed a complaint against CME Group and CME seeking a permanent injunction against CME’s Globex system and enhanced damages for what the plaintiff alleges is willful infringement, in addition to costs, expenses and attorneys’ fees. The suit alleges that CME infringes two U.S. patents. Based on its investigation to date and advice from legal counsel, the company believes this suit is without merit and intends to defend itself vigorously against these charges.

In addition, the company is a defendant in, and has potential for, various other legal proceedings arising from its regular business activities. While the ultimate results of such proceedings against the company cannot be predicted with certainty, the company believes that the resolution of any of these matters will not have a material adverse effect on its consolidated financial position or results of operations.

Employment Agreements. On August 5, 2009, the compensation committee and the board of directors of CME Group approved a revised employment agreement for Craig S. Donohue, the company’s Chief Executive Officer. In the event of a termination under certain circumstances, Mr. Donohue is entitled to a one-time lump sum severance payment equal to two times the sum of his then current base salary plus the amount of his threshold bonus (75% of his current base salary) under the company’s annual bonus incentive plan for that year. Under the terms of his agreement, Mr. Donohue will be entitled to receive a minimum annual base salary of $0.9 million for 2009 and of $1.0 million thereafter during the term of the agreement. This agreement expires on December 31, 2012, unless terminated sooner by the company or Mr. Donohue.

6 DANAHER CORP /DE/

NOTE 7. CONTINGENCIES

For a further description of the Company’s litigation and contingencies, reference is made to Note 12 to the Consolidated Financial Statements included in the Company’s 2008 Annual Report on Form 10-K.

The Company generally accrues estimated warranty costs at the time of sale. In general, manufactured products are warranted against defects in material and workmanship when properly used for their intended purpose, installed correctly, and appropriately maintained. Warranty period terms depend on the nature of the product and range from 90 days up to the life of the product. The amount of the accrued warranty liability is determined based on historical information such as past experience, product failure rates or number of units repaired, estimated cost of material and labor, and in certain instances estimated property damage. The liability, shown in the table below, is reviewed on a quarterly basis and may be adjusted as additional information regarding expected warranty costs becomes known.

In certain cases the Company will sell extended warranty or maintenance agreements. The proceeds from these agreements are deferred and recognized as revenue over the term of the agreement.

The following is a rollforward of the Company’s warranty accrual for the nine months ended October 2, 2009 ($ in thousands):

 

Balance, December 31, 2008

   $  107,910   

Accruals for warranties issued during the period

     76,014   

Attributable to 2009 acquisitions

     2,482   

Settlements made

     (71,327
        

Balance, October 2, 2009

   $ 115,079   
        

The Company selectively uses derivative financial instruments to manage currency exchange risk and does not hold derivatives for trading purposes. In the fourth quarter of 2008, two wholly-owned subsidiaries of the Company entered into foreign currency forward contracts related to anticipated sales denominated in currencies other than the functional currency of the subsidiaries entering the contracts. A portion of the contracts were settled in the nine months ended October 2, 2009. The remaining open forward contracts, having an aggregate notional amount of 881 million Japanese Yen ($9.8 million) as of October 2, 2009 related to one subsidiary and an aggregate notional amount of 4.2 million Euro ($6.1 million) also as of October 2, 2009, related to the second subsidiary, will be settled at various dates during the remaining three month period ending December 31, 2009 based on their terms. These forward contracts qualify as “effective” or “perfect” hedges. As of October 2, 2009 the aggregate fair value of the forward contracts was less than $1 million.

7 FedEx Corporation
(9) Contingencies

Wage-and-Hour.  We are a defendant in a number of lawsuits containing various class-action allegations of wage-and-hour violations.  The plaintiffs in these lawsuits allege, among other things, that they were forced to work “off the clock,” were not paid overtime or were not provided work breaks or other benefits.  The complaints generally seek unspecified monetary damages, injunctive relief, or both.

In February 2008, one of these wage-and-hour cases, Wiegele v. FedEx Ground, was certified as a class action by a California federal court, and in April 2008, the U.S. Court of Appeals for the Ninth Circuit denied our petition to review the class certification ruling.  The certified class initially included FedEx Ground sort managers and dock service managers in California from May 10, 2002 to the present, but the court subsequently approved the dismissal of the sort managers, leaving only the dock service managers in the class.  The plaintiffs allege that FedEx Ground has misclassified the managers as exempt from the overtime requirements of California wage-and-hour laws and is correspondingly liable for failing to pay them overtime compensation and provide them with rest and meal breaks.

In September 2008, in another one of these wage-and-hour cases, Tidd v. Adecco USA, Kelly Services and FedEx Ground, a Massachusetts federal court conditionally certified a class limited to individuals who were employed by two temporary employment agencies and who worked as temporary pick-up-and-delivery drivers for FedEx Ground in the New England region within the past three years.  Potential claimants must voluntarily “opt in” to the lawsuit in order to be considered part of the class.  In addition, in the same opinion, the court granted summary judgment in favor of FedEx Ground with respect to the plaintiffs’ claims for unpaid overtime wages.  Accordingly, as to FedEx Ground, the conditionally certified class of plaintiffs is now limited to a claim of failure to pay regular wages due under the federal Fair Labor Standards Act.

In April 2009, in another one of these wage-and-hour cases, Bibo v. FedEx Express, a California federal court granted class certification, certifying several subclasses of FedEx Express couriers in California from April 14, 2006 (the date of the settlement of the Foster class action) to the present.  The plaintiffs allege that FedEx Express violated California wage-and-hour laws after the date of the Foster settlement.  In particular, the plaintiffs allege, among other things, that they were forced to work “off the clock” and were not provided with required meal breaks or split-shift premiums.  We asked the U.S. Court of Appeals for the Ninth Circuit to accept a discretionary appeal of the class certification order, but the court refused to accept it at this time.

In July 2009, in another one of these wage-and-hour cases, Taylor v. FedEx Freight, a California state court indicated that it would grant class certification, and an order is being prepared for issuance by the court.  The plaintiffs purport to represent a class of all current and former drivers employed by FedEx Freight in California who performed line haul services since June 2003.  The plaintiffs allege, among other things, that they were forced to work “off the clock” and were not provided with required rest or meal breaks.

These class certification rulings do not address whether we will ultimately be held liable.  We have denied any liability and intend to vigorously defend ourselves in these wage-and-hour lawsuits.  We do not believe that any loss is probable in these lawsuits.

Independent Contractor — Lawsuits and State Administrative Proceedings.  FedEx Ground is involved in approximately 50 class-action lawsuits (including 29 that have been certified as class actions), several individual lawsuits and approximately 40 state tax and other administrative proceedings that claim that the company’s owner-operators should be treated as employees, rather than independent contractors.

Most of the class-action lawsuits have been consolidated for administration of the pre-trial proceedings by a single federal court, the U.S. District Court for the Northern District of Indiana.  With the exception of recently filed cases that have been or will be transferred to the multidistrict litigation, discovery on class certification and classification issues and class certification briefing are now complete.  In October 2007, we received a decision from the court granting class certification in a Kansas action alleging state law claims on behalf of a statewide class and federal law claims under the Employee Retirement Income Security Act of 1974 on behalf of a nationwide class.  In January 2008, the U.S. Court of Appeals for the Seventh Circuit declined our request for appellate review of the class certification decision.  In March 2008, the court granted class certification in 19 additional cases and denied it in nine cases.  In July 2009, the court granted class certification in eight additional cases and denied it in five cases.  The court has not yet ruled on class certification in the other cases that are pending in the multidistrict litigation.  Motions for summary judgment on the classification issue (i.e., independent contractor vs. employee) are (or are expected soon to be) pending in all 28 of the multidistrict litigation cases that have been certified as class actions.

In January 2008, one of the contractor-model lawsuits that is not part of the multidistrict litigation, Anfinson v. FedEx Ground, was certified as a class action by a Washington state court.  The plaintiffs in Anfinson represent a class of FedEx Ground single-route, pickup-and-delivery owner-operators in Washington from December 21, 2001 through December 31, 2005 and allege that the class members should be reimbursed as employees for their uniform expenses and should receive overtime pay.  In March 2009, a jury trial in the Anfinson case was held, and the jury returned a verdict in favor of FedEx Ground, finding that all 320 class members were independent contractors, not employees.  The plaintiffs have appealed the verdict.  The other contractor-model lawsuits that are not part of the multidistrict litigation are not as far along procedurally as Anfinson and all but one of the lawsuits are currently stayed pending further developments in the multidistrict litigation.

FedEx Ground is also involved in several lawsuits, including one purported class action, brought by drivers of the company’s independent contractors who claim that they were jointly employed by the contractor and FedEx Ground.

Adverse determinations in these matters could, among other things, entitle certain of our contractors and their drivers to the reimbursement of certain expenses and to the benefit of wage-and-hour laws and result in employment and withholding tax and benefit liability for FedEx Ground, and could result in changes to the independent contractor status of FedEx Ground’s owner-operators.  We believe that FedEx Ground’s owner-operators are properly classified as independent contractors and that FedEx Ground is not an employer of the drivers of the company’s independent contractors.  Given the nature and status of these lawsuits, we cannot yet determine the amount or a reasonable range of potential loss, if any, but it is reasonably possible that such potential loss or such changes to the independent contractor status of FedEx Ground’s owner-operators could be material.  However, we do not believe that a material loss is probable in any of these matters.

Independent Contractor — IRS Audit.  In September 2009, the Internal Revenue Service’s audit team (“Audit Team”) fully informed us of the results of their employment tax audit for the 2002 calendar year regarding the classification of independent contractors at FedEx Ground.  The Audit Team has proposed that no assessment of federal employment tax be made with respect to FedEx Ground’s independent contractors, with the exception of independent contractors providing the FedEx Home Delivery service.  With respect to those independent contractors, the Audit Team has notified us that they propose to assess tax and penalties of $14 million plus interest for 2002.  Substantially all of the proposed assessment relates to employment and withholding taxes for the 2002 calendar year.  Previously, in December 2007, the IRS indicated it tentatively anticipated assessing tax and penalties of $319 million, plus interest, for 2002 related to all FedEx Ground pick-up-and-delivery owner-operators.  In October 2008, the IRS withdrew its tentative assessment of $319 million plus interest while continuing its audit.  The $14 million assessment for our FedEx Home Delivery independent contractors noted above represents the results of that audit.

We intend to contest the erroneous conclusions in the audit.  We expect that a final resolution may not occur for some time.  We believe that we have strong defenses to the proposed assessment and will vigorously defend our position, as we continue to believe that all of FedEx Ground’s independent contractors, including those providing the FedEx Home Delivery service, are independent contractors.

Similar issues relating to our independent contractors are under audit by the IRS for calendar years 2004 through 2008.  As the IRS is still conducting audit work for calendar years 2004 through 2008, we cannot yet determine the amount or a reasonable range of potential loss for these periods.  However, we do not believe that loss is probable for either calendar year 2002 or any subsequent period.

Independent Contractor — Shareholder Derivative Lawsuits.  The Plumbers and Pipefitters Local 51 Pension Fund and the Western Pennsylvania Bricklayers Pension Fund each filed shareholder derivative lawsuits (which have now been consolidated) in Tennessee federal court naming FedEx Corporation as a nominal defendant and the members of the Board of Directors of FedEx Corporation as defendants (the Plumbers and Pipefitters suit was filed in May 2008 and the Bricklayers suit was filed in June 2008).  The derivative lawsuits, which were purportedly brought to assert the rights of FedEx Corporation, asserted claims against the Board members for breach of fiduciary duty, abuse of control, gross mismanagement, waste of corporate assets and unjust enrichment in connection with the management of FedEx Ground — in particular, the classification of FedEx Ground’s owner-operators as independent contractors.  In July 2009, the court dismissed the consolidated shareholder derivative lawsuits, and the time period for appeal has expired.

ATA Airlines.  ATA Airlines has sued FedEx Express in Indiana federal court alleging that we breached a contract by not including ATA on our 2009 Civil Reserve Air Fleet (CRAF)/Air Mobility Command (AMC) team, which provides cargo and passenger service to the U.S. military.  After being advised that it would not be a part of the 2009 team, ATA ceased operations and filed for bankruptcy.  ATA’s alleged damages include lost profits, aircraft acquisition costs and bankruptcy-related expenses.  We have denied any liability and contend that ATA has suffered no damages.  Discovery is ongoing, and given the preliminary status of the matter, we cannot yet determine the amount or a reasonable range of potential loss, if any.  However, we do not believe that any loss is probable.

Other.  FedEx and its subsidiaries are subject to other legal proceedings that arise in the ordinary course of their business.  In the opinion of management, the aggregate liability, if any, with respect to these other actions will not have a material adverse effect on our financial position, results of operations or cash flows.
8 FISERV INC

10. Litigation and Contingencies

Stambler Litigation

In July 2008, Leon Stambler filed a patent infringement complaint against Fiserv, Inc. and its subsidiary, CheckFree Corporation, in the United States District Court for the Eastern District of Texas styled as Leon Stambler v. Fiserv, Inc. and CheckFree Corporation. The complaint alleges that Fiserv and CheckFree infringe two patents allegedly owned by plaintiff by providing secure online banking services, including but not limited to online bill pay, through websites and through the provision of products and services to financial institutions. The plaintiff seeks an award of damages, including interest, as relief for any past and ongoing alleged infringement activities, costs and attorneys’ fees, and any other relief deemed appropriate by the court.

In May 2008 and December 2008, Leon Stambler filed related patent infringement complaints in the same forum against a number of financial institutions and their holding companies, as well as against a number of other providers of technology to the financial services industry. Those related cases are styled as: Leon Stambler v. JPMorgan Chase & Co., et al. and Leon Stambler v. Merrill Lynch & Co., Inc., et al. Those complaints allege that the defendants infringe the same two patents by providing secure online banking products and/or services, including but not limited to online bill pay and secure funds transfer products and/or services. The plaintiff seeks an award of damages, including interest, related to defendants’ alleged infringing activities and recovery of costs and attorneys’ fees, as well as a permanent injunction against any future infringing conduct. A number of financial institution defendants in these cases have requested indemnification from Fiserv, Inc. and/or CheckFree Corporation for products and services provided by the Company.

On October 23, 2009, the Company and Leon Stambler entered into a confidential settlement agreement, pursuant to which the Company was released from any liability for alleged infringement of Stambler’s patents and received a license to use the same. On October 27, 2009, the Company and Leon Stambler filed a joint stipulation of dismissal with prejudice from the above referenced cases. The settlement did not have a material impact on the Company’s condensed consolidated financial statements.

Indemnifications and Warranties

Subject to limitations and exclusions, the Company generally indemnifies its clients from certain costs resulting from claims of patent, copyright or trademark infringement associated with such clients’ use of its products or services. The Company may also warrant to clients that its products and services will operate substantially in accordance with identified specifications. From time to time, in connection with sales of businesses, the Company agrees to indemnify the buyers for liabilities associated with the businesses that are sold. Historically, payments under such indemnification or warranty provisions have not been significant.

 

9 FORTUNE BRANDS INC
17. Pending Litigation

Tobacco Litigation and Indemnification

On December 22, 1994, we sold The American Tobacco Company (ATCO) subsidiary to Brown & Williamson Tobacco Corporation (B&W), at the time a wholly-owned subsidiary of B.A.T. Industries p.l.c. In connection with the sale, B&W and ATCO, which subsequently merged into B&W, agreed, under an Indemnification Agreement (the Indemnification Agreement), to indemnify Fortune Brands, Inc. against claims including legal expenses arising from smoking and health and fire safe cigarette matters relating to the tobacco business of ATCO.

On July 30, 2004, B&W and R.J. Reynolds Tobacco Holdings, Inc. announced that they had completed the combination of their respective U.S. tobacco businesses, previously conducted by B&W (and ATCO) and R.J. Reynolds Tobacco Co., by forming a new combined company known as R.J. Reynolds Tobacco Company. As a result of the combination and in accordance with the Indemnification Agreement, the new R.J. Reynolds Tobacco Company has assumed the indemnification obligations under the Indemnification Agreement relating to the U.S. business previously conducted by B&W (and ATCO). B&W has not been released from any of its obligations under the Indemnification Agreement. We refer to B&W and the new R.J. Reynolds Tobacco Company as the “Indemnitor” under the Indemnification Agreement.

The Indemnitor has complied with the terms of the Indemnification Agreement since 1994 and we are not aware of any inability on the part of the Indemnitor to satisfy its indemnity obligations.

The Company is a defendant in a number of actions based upon allegations that human ailments have resulted from tobacco use. It is not possible to predict the outcome of the pending litigation, and, as with any litigation, it is possible that some of these actions could be decided unfavorably. We are unable to make a meaningful estimate of the amount or range of loss that could result from an unfavorable outcome of the pending litigation. However, we believe that there are a number of meritorious defenses to the pending actions, including the fact that the Company never made or sold tobacco, and these actions are being vigorously contested by the Indemnitor. We believe that the pending actions will not have a material adverse effect upon our results of operations, cash flows or financial condition because we believe we have meritorious defenses and the Company is indemnified under the Indemnification Agreement.

 

Other Litigation

On February 9, 2006, Callaway Golf Company filed a lawsuit seeking unspecified damages against Acushnet Company in the United States District Court for the District of Delaware. Callaway alleged that Pro V1 golf balls then manufactured by Acushnet Company infringed four of Callaway’s patents. Acushnet stipulated to infringement and a jury trial on the validity of the patent claims asserted by Callaway was conducted in December 2007. The jury was provided evidence related to nine claims contained in the four patents and returned a mixed verdict, finding one claim invalid and eight claims valid. On November 10, 2008, the trial court issued an order enjoining sales of all 2007 Pro V1 golf balls as of January 1, 2009. Acushnet appealed to the United States Court of Appeals for the Federal Circuit.

On August 14, 2009, the Court of Appeals overturned the judgment, vacated the injunction and sent the case back to the District Court. The Court of Appeals also found that the District Court erred in rejecting an Acushnet defense before the trial and that certain evidence supporting that defense may be available to Acushnet for the new trial. The District Court has scheduled a new trial for March 2010.

Separately, subsequent to the first trial in the District Court, the U.S. Patent and Trademark Office (PTO) issued final actions determining that all four of the patents on which Callaway’s infringement claims are based are invalid. The PTO also issued a Right of Appeal Notice on all four of the patents, providing Callaway the opportunity to appeal the determination to the Patent Board of Appeals. Callaway has filed appeals regarding all four of the patents with the Patent Board of Appeals.

In late 2008, Acushnet introduced what it believes to be non-infringing Pro V1 balls. In February 2009, Acushnet introduced new improved versions of the Pro V1 balls, which it also believes are non-infringing. On March 3, 2009, Callaway filed a lawsuit seeking unspecified damages against Acushnet in the United States District Court for the District of Delaware. Callaway alleged that Acushnet’s modified Pro V1 balls and Acushnet’s new 2009 versions of the Pro V1 balls infringe two additional patents owned by Callaway.

In addition, on March 3, 2009, Acushnet filed with the PTO a reexamination request for the two additional patents asserted by Callaway. The PTO has accepted the reexaminations and has issued first office actions that reject all of the claims of both patents as invalid on multiple grounds.

Acushnet believes, and counsel advises, that it has meritorious defenses to all of the litigation brought by Callaway and both of these matters are being vigorously contested. It is not possible at this time to assess the likelihood of an adverse outcome or determine a reasonable estimate, or range of estimates, of potential damages. If decided unfavorably, however, the litigation could have a material adverse effect on the results of the Company’s operations, cash flows or financial condition.

10 HOST HOTELS & RESORTS, INC.
13. Litigation

We are involved in various legal proceedings in the normal course of business. On April 27, 2005, we initiated suit against Keystone-Texas Property Holding Corporation (“Keystone”) in the 73rd Judicial District Court of Bexar County, Texas, Case No. 05-CI-14229, seeking a declaration that a provision of our ground lease for the property under the San Antonio Marriott Rivercenter was valid and claiming that Keystone had breached that lease provision. On April 6, 2006, a Bexar County Court granted an interlocutory motion for summary judgment that the provision was not valid and the lease provision had not been breached. On October 18, 2006, Keystone filed an amended counterclaim and later, a third party claim, alleging that we tortiously interfered with Keystone’s attempted sale of the property and that we slandered Keystone’s title to the property. We believe that we were asserting rights that parties had recognized as valid in past dealings. Keystone is seeking between $30 million and $40 million in damages. A jury trial on Keystone’s amended counterclaim and third party claim potentially could begin as early as mid-January 2010. We believe that our actions were entirely lawful and that Keystone’s claims are without merit.

We are vigorously defending this claim, however, no assurance can be given as to the outcome of any pending legal proceedings. We do not believe that the final resolution will have a material adverse effect on our financial condition.

11 KINDER MORGAN ENERGY PARTNERS L P
10.  Litigation, Environmental and Other Contingencies

Below is a brief description of our ongoing material legal proceedings, including any material developments that occurred in such proceedings during the nine months ended September 30, 2009.  Additional information with respect to these proceedings can be found in Note 16 to our consolidated financial statements that were filed with our 2008 Form 10-K.  This note also contains a description of any material legal proceedings that were initiated against us during the nine months ended September 30, 2009.

In this note, we refer to SFPP, L.P. as SFPP; Calnev Pipe Line LLC as Calnev; Chevron Products Company as Chevron; Navajo Refining Company, L.P. as Navajo; ARCO Products Company as ARCO; BP West Coast Products, LLC as BP WCP; Texaco Refining and Marketing Inc. as Texaco; Western Refining Company, L.P. as Western Refining; ExxonMobil Oil Corporation as ExxonMobil; Tosco Corporation as Tosco; Ultramar Diamond Shamrock Corporation/Ultramar Inc. as Ultramar; Valero Energy Corporation as Valero; Valero Marketing and Supply Company as Valero Marketing; America West Airlines, Inc., Continental Airlines, Inc., Northwest Airlines, Inc., Southwest Airlines Co. and US Airways, Inc., collectively, as the Airlines; the United States Court of Appeals for the District of Columbia Circuit as the D.C. Circuit; and the Federal Energy Regulatory Commission, as the FERC.

Federal Energy Regulatory Commission Proceedings

 
FERC Docket Nos. OR92-8, et al.—Complainants/Protestants: Chevron, Navajo, ARCO, BP WCP, Western Refining, ExxonMobil, Tosco, and Texaco (Ultramar is an intervenor)—Defendant: SFPP—Subject:  Complaints against East Line and West Line rates; appeals pending at the D.C. Circuit.

 
FERC Docket No. OR92-8-025—Complainants/Protestants:  BP WCP; ExxonMobil; Chevron; ConocoPhillips; and Ultramar—Defendant: SFPP—Subject:  Complaints against East Line and West Line rates and Watson Station Drain-Dry Charge; appeal pending at the D.C. Circuit.

 
FERC Docket Nos. OR96-2, et al.—Complainants/Protestants: All Shippers except Chevron (which is an intervenor)—Defendant: SFPP—Subject:  Complaints against all SFPP rates;

 
FERC Docket No. OR02-4—Complainant/Protestant: Chevron—Defendant: SFPP; Subject:  Complaint against SFPP rates; dismissed and Chevron appeal pending at the D.C. Circuit;

 
FERC Docket Nos. OR03-5, OR04-3, OR05-4 & OR05-5—Complainants/Protestants: BP WCP, ExxonMobil, ConocoPhillips, the Airlines (other shippers intervened)—Defendant: SFPP—Subject:  Complaints against all SFPP rates;

 
FERC Docket Nos. OR07-1 & OR07-2—Complainant/Protestant: Tesoro—Defendant: SFPP—Subject:  Complaints against North Line and West Line rates; held in abeyance;

 
FERC Docket Nos. OR07-3 & OR07-6—Complainants/Protestants: BP WCP, Chevron, ConocoPhillips, ExxonMobil, Tesoro, and Valero Marketing—Defendant: SFPP—Subject:  Complaints against 2005 and 2006 indexed rate increases; dismissed by FERC; appeal pending at D.C. Circuit;

 
FERC Docket No. OR07-4—Complainants/Protestants: BP WCP, Chevron, and ExxonMobil—Defendants: SFPP, Kinder Morgan G.P., Inc., and KMI—Subject:  Complaints against all SFPP rates; held in abeyance; complaint withdrawn as to SFPP’s affiliates;

 
FERC Docket Nos. OR07-5 & OR07-7 (consolidated) and IS06-296—Complainants/Protestants: ExxonMobil and Tesoro—Defendants: Calnev, Kinder Morgan G.P., Inc., and KMI—Subject:  Complaints and protest against Calnev rates; OR07-5 and IS06-296 were settled in 2008; OR07-7 complaint amendment pending before FERC;

 
FERC Docket Nos. OR07-18, OR07-19 & OR07-22—Complainants/Protestants: Airlines, BP WCP, Chevron, ConocoPhillips and Valero Marketing—Defendant: Calnev—Subject:  Complaints against Calnev rates; complaint amendments pending before FERC;

 
FERC Docket No. OR07-20—Complainant/Protestant: BP WCP—Defendant: SFPP—Subject:  Complaint against 2007 indexed rate increases; dismissed by FERC; appeal pending at D.C. Circuit;

 
FERC Docket Nos. OR08-13 & OR08-15—Complainants/Protestants: BP WCP and ExxonMobil—Defendant: SFPP—Subject:  Complaints against all SFPP rates and 2008 indexed rate increases;

 
FERC Docket No. IS05-230 (North Line rate case)—Complainants/Protestants: Shippers—Defendant: SFPP—Subject:  SFPP filing to increase North Line rates to reflect expansion; initial decision issued; pending at FERC;

 
FERC Docket No. IS07-137—Complainants/Protestants: Shippers—Defendant: SFPP—Subject:  ULSD surcharge; settled;

 
FERC Docket No. IS08-390—Complainants/Protestants: BP WCP, ExxonMobil, ConocoPhillips, Valero, Chevron, the Airlines—Defendant: SFPP—Subject:  West Line rate increase; Initial Decision expected December 2009;

 
FERC Docket No. IS09-375—Complainants/Protestants: BP, ExxonMobil, Chevron, Tesoro, ConocoPhillips, Western, Navajo, Valero, and Southwest (other shippers intervened)—Defendant: SFPP—Subject:  Protests regarding 2009 indexed rate increases; protests dismissed by FERC;

 
FERC Docket No. IS09-377—Complainants/Protestants: BP, Chevron, and Tesoro (other shippers intervened)—Defendant: Calnev—Subject:  Protests regarding 2009 index-based rate increases; protests dismissed by FERC;

 
FERC Docket No. IS09-437—Complainants/Protestants: BP WCP, ExxonMobil, ConocoPhillips, Valero, Chevron, Western Refining, and the Airlines—Defendant: SFPP—Subject:  East Line rate increases;

 
FERC Docket Nos. OR09-8/OR09-18/OR09-21 (not consolidated)—Complainants/Protestants: Chevron/Tesoro/BP WCP—Defendant: SFPP—Subject:  Complaints against July 1, 2008 (Chevron/Tesoro) and July 1, 2009 (Tesoro/BP WCP) index-based rate increases;

 
FERC Docket Nos. OR09-11/OR09-14 (not consolidated)—Complainants/Protestants: BP WCP/Tesoro—Defendant: Calnev—Subject:  Complaints requesting audit of Page 700 of FERC Form No. 6 for 2007 and 2008;

 
FERC Docket Nos. OR09-12/OR09-16 (not consolidated)—Complainants/Protestants: BP WCP/Tesoro—Defendant: SFPP—Subject:  Complaints requesting audit of Page 700 of FERC Form No. 6 for 2007 and 2008;

 
FERC Docket Nos. OR09-15/OR09-20 (not consolidated)—Complainants/Protestants: Tesoro/BP WCP—Defendant: Calnev—Subject:  Complaints against all Calnev rates;

 
FERC Docket Nos. OR09-17/OR09-22 (not consolidated)—Complainants/Protestants: Tesoro/BP WCP—Defendant: SFPP—Subject:  Complaints against SFPP rates; and

 
FERC Docket Nos. OR09-19/OR09-23 (not consolidated)—Complainants/Protestants: Tesoro/BP WCP—Defendant: Calnev—Subject:  Complaints against July 1, 2009 index-based rate increases.
 
The tariffs and rates charged by SFPP and Calnev are subject to numerous ongoing proceedings at the FERC, including the above listed shippers’ complaints and protests regarding interstate rates on these pipeline systems.   These complaints have been filed over numerous years beginning in 1992 through and including 2009.  In general, these complaints allege the rates and tariffs charged by SFPP and Calnev are not just and reasonable.  If the shippers are successful in proving their claims, they are entitled to seek reparations (which may reach up to two years prior to the filing of their complaint) or refunds of any excess rates paid, and SFPP and Calnev may be required to reduce their rates going forward.  These proceedings tend to be protracted, with decisions of the FERC often appealed to the federal courts. 

As to SFPP, the issues involved in these proceedings include, among others: (i) whether certain of our Pacific operations’ rates are “grandfathered” under the Energy Policy Act of 1992, and therefore deemed to be just and reasonable; (ii) whether “substantially changed circumstances” have occurred with respect to any grandfathered rates such that those rates could be challenged; (iii) whether indexed rate increases are justified; and (iv) the appropriate level of return and income tax allowance we may include in our rates.  The issues involving Calnev are similar.

During 2008, SFPP and Calnev made combined settlement payments to various shippers totaling approximately $30.2 million in connection with OR92-8-025, IS06-283 and OR07-5.  In October 2008, SFPP entered into a settlement resolving disputes regarding its East Line rates filed in Docket No. IS08-28 and related dockets.  In January 2009, the FERC approved the settlement.  Reduced settlement rates became effective on May 1, 2009, and SFPP made refund and settlement payments totaling $15.5 million in May 2009.

Based on our review of these FERC proceedings, we estimate that as of September 30, 2009, shippers are seeking approximately $355 million in reparation and refund payments and approximately $30 to $35 million in additional annual rate reductions.  We assume that, with respect to our SFPP litigation reserves, any reparations and accrued interest thereon will be paid no earlier than the end of 2009. 

California Public Utilities Commission Proceedings

SFPP has previously reported ratemaking and complaint proceedings pending with the California Public Utilities Commission, referred to in this note as the CPUC.  The ratemaking and complaint cases generally involve challenges to rates charged by SFPP for intrastate transportation of refined petroleum products through its pipeline system in the state of California and request prospective rate adjustments and refunds with respect to tariffed and previously untariffed charges for certain pipeline transportation and related services.  These matters have been consolidated and assigned to two administrative law judges.  As of the filing of this report, it is unknown when a decision from the CPUC regarding either of the two groups of consolidated  matters will be issued.  Based on our review of these CPUC proceedings, we estimate that shippers are seeking approximately $100 million in reparation and refund payments and approximately $35 million in annual rate reductions.
 
Carbon Dioxide Litigation

Gerald O. Bailey et al. v. Shell Oil Co. et al/Southern District of Texas Lawsuit

Kinder Morgan CO2 Company, L.P., Kinder Morgan Energy Partners, L.P. and Cortez Pipeline Company are among the defendants in a proceeding in the federal courts for the Southern District of Texas.  Gerald O. Bailey et al. v. Shell Oil Company et al. (Civil Action Nos. 05-1029 and 05-1829 in the U.S. District Court for the Southern District of Texas—consolidated by Order dated July 18, 2005).  The plaintiffs assert claims for the underpayment of royalties on carbon dioxide produced from the McElmo Dome Unit, located in southwestern Colorado.  The plaintiffs assert claims for fraud/fraudulent inducement, real estate fraud, negligent misrepresentation, breach of fiduciary and agency duties, breach of contract and covenants, violation of the Colorado Unfair Practices Act, civil theft under Colorado law, conspiracy, unjust enrichment, and open account.  Plaintiffs Gerald O. Bailey, Harry Ptasynski, and W.L. Gray & Co. also assert claims as private relators under the False Claims Act and for violation of federal and Colorado antitrust laws.  The plaintiffs seek actual damages, treble damages, punitive damages, a constructive trust and accounting, and declaratory relief.  The defendants filed motions for summary judgment on all claims. 

On April 22, 2008, the federal district court granted defendants’ motions for summary judgment and ruled that plaintiffs Bailey and Ptasynski take nothing on their claims, and that the claims of Gray be dismissed with prejudice. The court entered final judgment in favor of the defendants on April 30, 2008.  Defendants have filed a motion seeking sanctions against plaintiffs Bailey and Ptasynski and their attorney.  The plaintiffs have appealed the final judgment to the United States Fifth Circuit Court of Appeals.  The parties concluded their briefing to the Fifth Circuit Court of Appeals in February 2009.

CO2 Claims Arbitration

Cortez Pipeline Company and Kinder Morgan CO2 Company L.P., successor to Shell CO2 Company, Ltd. and referred to in this note as Kinder Morgan CO2, were among the named defendants in CO2 Committee, Inc. v. Shell Oil Co., et al., an arbitration initiated on November 28, 2005.  The arbitration arose from a dispute over a class action settlement agreement which became final on July 7, 2003 and disposed of five lawsuits formerly pending in the U.S. District Court, District of Colorado.  The plaintiffs in such lawsuits primarily included overriding royalty interest owners, royalty interest owners, and small share working interest owners who alleged underpayment of royalties and other payments on carbon dioxide produced from the McElmo Dome Unit. 

The settlement imposed certain future obligations on the defendants in the underlying litigation.  The plaintiffs alleged that, in calculating royalty and other payments, defendants used a transportation expense in excess of what is allowed by the settlement agreement, thereby causing alleged underpayments of approximately $12 million.  The plaintiffs also alleged that Cortez Pipeline Company should have used certain funds to further reduce its debt, which, in turn, would have allegedly increased the value of royalty and other payments by approximately $0.5 million.  On August 7, 2006, the arbitration panel issued its opinion finding that defendants did not breach the settlement agreement.  On June 21, 2007, the New Mexico federal district court entered final judgment confirming the August 7, 2006 arbitration decision.

On October 2, 2007, the plaintiffs initiated a second arbitration (CO2 Committee, Inc. v. Shell CO2 Company, Ltd., aka Kinder Morgan CO2 Company, L.P., et al.) against Cortez Pipeline Company, Kinder Morgan CO2 and an ExxonMobil entity.  The second arbitration asserts claims similar to those asserted in the first arbitration.  On June 3, 2008, the plaintiffs filed a request with the American Arbitration Association seeking administration of the arbitration.  In October 2008, the New Mexico federal district court entered an order declaring that the panel in the first arbitration should decide whether the claims in the second arbitration are barred by res judicata.  The plaintiffs filed a motion for reconsideration of that order, which was denied by the New Mexico federal district court in January 2009.  Plaintiffs have appealed to the Tenth Circuit Court of Appeals and continue to seek administration of the second arbitration by the American Arbitration Association.  The American Arbitration Association has indicated that it intends to stay any action pending the Tenth Circuit appeal.
 
MMS Matters

The U.S. Department of the Interior, Minerals Management Service, referred to in this note as the MMS, and Kinder Morgan CO2 have reached a settlement of the previously reported Notice of Noncompliance and Civil Penalty from December 2006 and Orders to Report and Pay from March 2007 and August 2007.  The settlement agreement is subject to final MMS approval and upon approval will be funded from existing reserves and indemnity payments by Shell CO2 General LLC and Shell CO2 LLC pursuant to a royalty claim indemnification agreement.

J. Casper Heimann, Pecos Slope Royalty Trust and Rio Petro LTD, individually and on behalf of all other private royalty and overriding royalty owners in the Bravo Dome Carbon Dioxide Unit, New Mexico similarly situated v. Kinder Morgan CO2 Company, L.P., No. 04-26-CL (8th Judicial District Court, Union County New Mexico)

This case involves a purported class action against Kinder Morgan CO2 alleging that it has failed to pay the full royalty and overriding royalty, collectively referred to as the royalty interests, on the true and proper settlement value of compressed carbon dioxide produced from the Bravo Dome Unit during the period beginning January 1, 2000.  The complaint purports to assert claims for violation of the New Mexico Unfair Practices Act, constructive fraud, breach of contract and of the covenant of good faith and fair dealing, breach of the implied covenant to market, and claims for an accounting, unjust enrichment, and injunctive relief.  The purported class is comprised of current and former owners, during the period January 2000 to the present, who have private property royalty interests burdening the oil and gas leases held by the defendant, excluding the Commissioner of Public Lands, the United States of America, and those private royalty interests that are not unitized as part of the Bravo Dome Unit. 

The case was tried to a jury in the trial court in September 2008.  The plaintiffs sought $6.8 million in actual damages as well as punitive damages.  The jury returned a verdict finding that Kinder Morgan CO2 did not breach the settlement agreement and did not breach the claimed duty to market carbon dioxide.  The jury also found that Kinder Morgan CO2 breached a duty of good faith and fair dealing and found compensatory damages of $0.3 million and punitive damages of $1.2 million.  On October 16, 2008, the trial court entered judgment on the verdict.

On January 6, 2009, the district court entered orders vacating the judgment and scheduling a new trial beginning on October 19, 2009.  On September 10, 2009, the parties signed a settlement agreement providing for a payment of $3.2 million to the class, a new royalty methodology pursuant to which future royalties will be based on a price formula that is tied in part to published crude oil prices, and a dismissal with prejudice of all claims.  On October 22, 2009, the trial court entered final judgment approving the settlement.
 
Colorado Severance Tax Assessment

On September 16, 2009, the Colorado Department of Revenue issued three Notices of Deficiency to Kinder Morgan CO2.  The Notices of Deficiency assessed additional state severance tax against Kinder Morgan CO2 with respect to carbon dioxide produced from the McElmo Dome Unit for tax years 2005, 2006, and 2007.  The total amount of tax assessed was $5.7 million, plus interest of $1.0 million, plus penalties of $1.7 million.  Kinder Morgan CO2 protested the Notices of Deficiency and paid the tax and interest under protest.  Kinder Morgan CO2 is now awaiting the response of the Colorado Department of Revenue to the Protest.

Montezuma County, Colorado Property Tax Assessment

On September 11, 2009, the County Assessor of Montezuma County, Colorado, issued Special Notices of Valuation to Kinder Morgan CO2.   The Special Notices of Valuation were revised on September 30, 2009.  The revised Special Notices of Valuation were issued based on the assertion that a portion of the actual value of the carbon dioxide produced from the McElmo Dome Unit was omitted from the 2008 tax roll due to an alleged over statement of transportation and other expenses used to calculate the net taxable value. Kinder Morgan CO2 filed a Protest of the revised Special Notices of Valuation and is now awaiting the County Assessor’s response to that Protest.  If tax bills are issued reflecting the Special Notices of Valuation, we expect that additional property taxes will be due from all interest owners at the McElmo Dome Unit in the amount of approximately $2.1 million, plus interest.  Of this amount, 37.2% would be attributed to our interest.  Upon payment of any additional taxes, we expect to file a petition for abatement or refund and vigorously contest Montezuma County’s position.
 
Other

In addition to the matters listed above, audits and administrative inquiries concerning Kinder Morgan CO2’s payments on carbon dioxide produced from the McElmo Dome and Bravo Dome Units are currently ongoing.  These audits and inquiries involve federal agencies, the states of Colorado and New Mexico, and county taxing authorities in the state of Colorado.

Commercial Litigation Matters

Union Pacific Railroad Company Easements

SFPP and Union Pacific Railroad Company (the successor to Southern Pacific Transportation Company and referred to in this note as UPRR) are engaged in a proceeding to determine the extent, if any, to which the rent payable by SFPP for the use of pipeline easements on rights-of-way held by UPRR should be adjusted pursuant to existing contractual arrangements for the ten year period beginning January 1, 2004 (Union Pacific Railroad Company vs. Santa Fe Pacific Pipelines, Inc., SFPP, L.P., Kinder Morgan Operating L.P. “D”, Kinder Morgan G.P., Inc., et al., Superior Court of the State of California for the County of Los Angeles, filed July 28, 2004).  In February 2007, a trial began to determine the amount payable for easements on UPRR rights-of-way.  The trial is ongoing and is expected to conclude by the end of 2009.

SFPP and UPRR are also engaged in multiple disputes over the circumstances under which SFPP must pay for a relocation of its pipeline within the UPRR right-of-way and the safety standards that govern relocations.  In July 2006, a trial before a judge regarding the circumstances under which SFPP must pay for relocations concluded, and the judge determined that SFPP must pay for any relocations resulting from any legitimate business purpose of the UPRR.  SFPP appealed this decision, and in December 2008, the appellate court affirmed the decision.  In addition, UPRR contends that SFPP must comply with the more expensive American Railway Engineering and Maintenance-of-Way standards in determining when relocations are necessary and in completing relocations.  Each party is seeking declaratory relief with respect to its positions regarding the application of these standards with respect to relocations.

It is difficult to quantify the effects of the outcome of these cases on SFPP, because SFPP does not know UPRR’s plans for projects or other activities that would cause pipeline relocations.  Even if SFPP is successful in advancing its positions, significant relocations for which SFPP must nonetheless bear the expense (i.e., for railroad purposes, with the standards in the federal Pipeline Safety Act applying) would have an adverse effect on our financial position and results of operations.  These effects would be even greater in the event SFPP is unsuccessful in one or more of these litigations.

United States of America, ex rel., Jack J. Grynberg v. K N Energy (Civil Action No. 97-D-1233, filed in the U.S. District Court, District of Colorado).

This multi-district litigation proceeding involves four lawsuits filed in 1997 against numerous Kinder Morgan companies.  These suits were filed pursuant to the federal False Claims Act and allege underpayment of royalties due to mismeasurement of natural gas produced from federal and Indian lands.  The complaints are part of a larger series of similar complaints filed by Mr. Grynberg against 77 natural gas pipelines (approximately 330 other defendants) in various courts throughout the country which were consolidated and transferred to the District of Wyoming.

In May 2005, a Special Master appointed in this litigation found that because there was a prior public disclosure of the allegations and that Grynberg was not an original source, the Court lacked subject matter jurisdiction.  As a result, the Special Master recommended that the Court dismiss all the Kinder Morgan defendants.  In October 2006, the United States District Court for the District of Wyoming upheld the dismissal of each case against the Kinder Morgan defendants on jurisdictional grounds.  Grynberg appealed this Order to the Tenth Circuit Court of Appeals.  Briefing was completed and oral argument was held on September 25, 2008.  A decision by the Tenth Circuit Court of Appeals affirming the dismissal of the Kinder Morgan Defendants was issued on March 17, 2009.  Grynberg’s petition for rehearing was denied on May 4, 2009 and the Tenth Circuit issued its Mandate on May 18, 2009.  On October 5, 2009 the United States Supreme Court denied Grynberg’s Petition for Writ of Certiorari, ending his appeal.
 
Prior to the dismissal order on jurisdictional grounds, the Kinder Morgan defendants filed Motions to Dismiss and for Sanctions alleging that Grynberg filed his Complaint without evidentiary support and for an improper purpose.  On January 8, 2007, after the dismissal order, the Kinder Morgan defendants also filed a Motion for Attorney Fees under the False Claim Act.  A decision is still pending on the Motions to Dismiss and for Sanctions and the Requests for Attorney Fees.

Severstal Sparrows Point Crane Collapse

On June 4, 2008, a bridge crane owned by Severstal Sparrows Point, LLC in Sparrows Point, Maryland collapsed while being operated by our subsidiary Kinder Morgan Bulk Terminals, Inc.  According to our investigation, the collapse was caused by unexpected, sudden and extreme winds.  On June 24, 2009, Severstal filed suit against Kinder Morgan Bulk Terminals in the United States District Court for the District of Maryland, cause no. WMN 09CV1668.  Severstal alleges that we were contractually obligated to replace the collapsed crane and that our employees were negligent in failing to properly secure the crane prior to the collapse.  Severstal seeks unspecified damages for value of the crane and lost profits.  Kinder Morgan Bulk Terminals denies each of Severstal’s allegations.

Leukemia Cluster Litigation

Richard Jernee, et al v. Kinder Morgan Energy Partners, et al, No. CV03-03482 (Second Judicial District Court, State of Nevada, County of Washoe) (“Jernee”).

Floyd Sands, et al v. Kinder Morgan Energy Partners, et al, No. CV03-05326  (Second Judicial District Court, State of Nevada, County of Washoe) (“Sands”).

On May 30, 2003, plaintiffs, individually and on behalf of Adam Jernee, filed a civil action in the Nevada State trial court against us and several Kinder Morgan related entities and individuals and additional unrelated defendants. Plaintiffs in the Jernee matter claim that defendants negligently and intentionally failed to inspect, repair and replace unidentified segments of their pipeline and facilities, allowing “harmful substances and emissions and gases” to damage “the environment and health of human beings.”  Plaintiffs claim that “Adam Jernee’s death was caused by leukemia that, in turn, is believed to be due to exposure to industrial chemicals and toxins.”  Plaintiffs purport to assert claims for wrongful death, premises liability, negligence, negligence per se, intentional infliction of emotional distress, negligent infliction of emotional distress, assault and battery, nuisance, fraud, strict liability (ultra hazardous acts), and aiding and abetting, and seek unspecified special, general and punitive damages.

On August 28, 2003, a separate group of plaintiffs, represented by the counsel for the plaintiffs in the Jernee matter, individually and on behalf of Stephanie Suzanne Sands, filed a civil action in the Nevada State trial court against the same defendants and alleging the same claims as in the Jernee case with respect to Stephanie Suzanne Sands.  The Jernee case has been consolidated for pretrial purposes with the Sands case.

In July, 2009, plaintiffs in both the Sands and Jernee cases agreed to dismiss all claims against the Kinder Morgan related defendants with prejudice in exchange for the Kinder Morgan defendants’ agreement that they would not seek to recover their defense costs against the plaintiffs.  The Kinder Morgan defendants filed a Motion for Approval of Good Faith Settlement which was granted by the court on August 27, 2009, effectively concluding these cases with respect to all Kinder Morgan related entities and individuals.

Pipeline Integrity and Releases

From time to time, despite our best efforts, our pipelines experience leaks and ruptures.  These leaks and ruptures may cause explosions, fire, and damage to the environment, damage to property and/or personal injury or death.  In connection with these incidents, we may be sued for damages caused by an alleged failure to properly mark the locations of our pipelines and/or to properly maintain our pipelines.  Depending upon the facts and circumstances of a particular incident, state and federal regulatory authorities may seek civil and/or criminal fines and penalties.
 
Midcontinent Express Pipeline LLC Construction Incident

On July 15, 2009, a Midcontinent Express Pipeline LLC contractor and subcontractor were conducting a nitrogen pressure test on facilities at a Midcontinent Express delivery meter station that was under construction in Smith County, Mississippi.  An unexpected release occurred during testing, resulting in one fatality and injuries to four other employees of the contractor or subcontractor.  The United States Occupational Safety and Health Administration is investigating and has completed an on-site investigation into the cause of the incident with assistance from the United States Department of Transportation Pipeline and Hazardous Materials Safety Administration, referred to in this note as the PHMSA.  We are awaiting a report on the results of the investigation.  All construction work at other Midcontinent Express meter sites was allowed to continue after safety and construction reviews confirmed that the work could resume safely.

Pasadena Terminal Fire

On September 23, 2008, a fire occurred in the pit 3 manifold area of our Pasadena, Texas terminal facility.  One of our employees was injured and subsequently died.  In addition, the pit 3 manifold was severely damaged.

On July 13, 2009, a civil lawsuit was filed by and on behalf of the family of the deceased employee entitled Brandy Williams et. al. v. KMGP Services Company, Inc. in the 133rd District Court of Harris County, Texas, case no. 2009-44321.  The suit alleges one count of gross negligence against defendant and seeks unspecified compensatory and punitive damages.  We have filed an Answer denying the allegations in the Complaint, and the parties are currently engaged in discovery.

Rockies Express Pipeline LLC Wyoming Construction Incident

On November 11, 2006, a bulldozer operated by an employee of Associated Pipeline Contractors, Inc., a third-party contractor to Rockies Express Pipeline LLC, struck an existing subsurface natural gas pipeline owned by Wyoming Interstate Company, a subsidiary of El Paso Pipeline Group.  The pipeline was ruptured, resulting in an explosion and fire.  The incident occurred in a rural area approximately nine miles southwest of Cheyenne, Wyoming.  The incident resulted in one fatality (the operator of the bulldozer) and there were no other reported injuries.  The cause of the incident was investigated by the PHMSA.  In March 2008, the PHMSA issued a Notice of Probable Violation, Proposed Civil Penalty and Proposed Compliance Order, referred to in this note as a NOPV, to El Paso Corporation in which it concluded that El Paso failed to comply with federal law and its internal policies and procedures regarding protection of its pipeline, resulting in this incident.

To date, the PHMSA has not issued any NOPV’s to Rockies Express Pipeline LLC, referred to as Rockies Express, and we do not expect that it will do so.  Immediately following the incident, Rockies Express and El Paso Pipeline Group reached an agreement on a set of additional enhanced safety protocols designed to prevent the reoccurrence of such an incident.

In September 2007, the family of the deceased bulldozer operator filed a wrongful death action against us, Rockies Express and several other parties in the District Court of Harris County, Texas, 189th Judicial District, at case number 2007-57916.  The plaintiffs seek unspecified compensatory and exemplary damages plus interest, attorney’s fees and costs of suit.  We have asserted contractual claims for complete indemnification for any and all costs arising from this incident, including any costs related to this lawsuit, against third parties and their insurers.  On March 25, 2008, we entered into a settlement agreement with one of the plaintiffs, the decedent’s daughter, resolving any and all of her claims against us, Rockies Express and its contractors.  We were indemnified for the full amount of this settlement by one of Rockies Express’ contractors.  On October 17, 2008, the remaining plaintiffs filed a Notice of Nonsuit, which dismissed the remaining claims against all defendants without prejudice to the plaintiffs’ ability to re-file their claims at a later date.  The remaining plaintiffs re-filed their Complaint against Rockies Express, us and several other parties on November 7, 2008, Cause No. 2008-66788, currently pending in the District Court of Harris County, Texas, 189th Judicial District.  The parties are currently engaged in discovery.
 
Charlotte, North Carolina

On November 27, 2006, the Plantation Pipeline experienced a release of approximately 95 barrels of gasoline from a Plantation Pipe Line Company block valve on a delivery line into a terminal owned by a third party company.  The line was repaired and put back into service within a few days.  Remediation efforts are continuing under the direction of the North Carolina Department of Environment and Natural Resources, referred to in this note as the NCDENR, which issued a Notice of Violation and Recommendation of Enforcement against Plantation on January 8, 2007.  Plantation continues to cooperate fully with the NCDENR.

In April 2007, during pipeline maintenance activities near Charlotte, North Carolina, Plantation discovered the presence of historical soil contamination near the pipeline, and reported the presence of impacted soils to the NCDENR.  Subsequently, Plantation contacted the owner of the property to request access to the property to investigate the potential contamination.  The results of that investigation indicate that there is soil and groundwater contamination which appears to be from a historical turbine fuel release.  The groundwater contamination is underneath at least two lots on which there is current construction of single family homes that are part of a new residential development.  Further investigation and remediation are being conducted under the oversight of the NCDENR.  Plantation reached a settlement with the builder of the two homes that were impacted.  Plantation continues to negotiate with the owner of the property to address any potential claims that it may bring.

Barstow, California

The United States Department of Navy has alleged that historic releases of methyl tertiary-butyl ether, referred to in this report as MTBE, from Calnev Pipe Line Company’s Barstow terminal (i) have migrated underneath the Navy’s Marine Corps Logistics Base in Barstow; (ii) have impacted the Navy’s existing groundwater treatment system for unrelated groundwater contamination not alleged to have been caused by Calnev; and (iii) could affect the Barstow, California Marine Corps Logistic Base’s water supply system.  Although Calnev believes that it has certain meritorious defenses to the Navy’s claims, it is working with the Navy to agree upon an Administrative Settlement Agreement and Order on Consent for federal Comprehensive Environmental Response, Compensation and Liability Act (referred to as CERCLA) Removal Action to reimburse the Navy for $0.5 million in past response actions, plus potentially perform other work, if the parties determine it to be necessary, to ensure protection of the Navy’s existing treatment system and water supply. 

Westridge Terminal, Burnaby, British Columbia

On July 24, 2007, a third-party contractor installing a sewer line for the City of Burnaby struck a crude oil pipeline segment included within our Trans Mountain pipeline system near its Westridge terminal in Burnaby, BC, resulting in a release of approximately 1,400 barrels of crude oil.  The release impacted the surrounding neighborhood, several homes and nearby Burrard Inlet.  No injuries were reported.  To address the release, we initiated a comprehensive emergency response in collaboration with, among others, the City of Burnaby, the British Columbia Ministry of Environment, the National Energy Board, and the National Transportation Safety Board.  Cleanup and environmental remediation is complete and we have applied to the British Columbia Ministry of Environment for a Certificate of Compliance confirming complete remediation.  Certification is expected prior to year end.

The National Transportation Safety Board released its investigation report on the incident on March 18, 2009.  The report confirmed that an absence of pipeline location marking in advance of excavation and inadequate communication between the contractor and our subsidiary Kinder Morgan Canada Inc., the operator of the line, were the primary causes of the accident.  No directives, penalties or actions of Kinder Morgan Canada Inc. were required as a result of the report.

On July, 22, 2009, the British Columbia Ministry of Environment issued regulatory charges against the third-party contractor, the engineering consultant to the sewer line project, Kinder Morgan Canada Inc., and Trans Mountain L.P. (the last two of which are subsidiaries of ours).  The charges claim that the parties charged caused the release of crude oil, and in doing so were in violation of various sections of the Environmental, Fisheries and Migratory Bird Acts.  We are of the view that the charges have been improperly laid against us, and we intend to vigorously defend against them.
 
General

Although no assurance can be given, we believe that we have meritorious defenses to the actions set forth in this note and, to the extent an assessment of the matter is possible, if it is probable that a liability has been incurred and the amount of loss can be reasonably estimated, we believe that we have established an adequate reserve to cover potential liability.

Additionally, although it is not possible to predict the ultimate outcomes, we also believe, based on our experiences to date, that the ultimate resolution of these matters will not have a material adverse impact on our business, financial position, results of operations or cash flows.  As of September 30, 2009 and December 31, 2008, we have recorded a total reserve for legal fees, transportation rate cases and other litigation liabilities in the amount of $207.7 million and $234.8 million, respectively.  The reserve is primarily related to various claims from lawsuits arising from our West Coast products pipeline transportation rates, and the contingent amount is based on both the circumstances of probability and reasonability of dollar estimates.  We regularly assess the likelihood of adverse outcomes resulting from these claims in order to determine the adequacy of our liability provision.

Environmental Matters

The City of Los Angeles v. Kinder Morgan Liquids Terminals, LLC, Shell Oil Company, Equilon Enterprises LLC;  California Superior Court, County of Los Angeles, Case No. NC041463.

Kinder Morgan Liquids Terminals LLC is a defendant in a lawsuit filed in 2005 alleging claims for environmental cleanup costs at the former Los Angeles Marine Terminal in the Port of Los Angeles. The lawsuit was stayed for the first half of 2009 in order to allow the parties to work with the regulatory agency concerning the scope of the required cleanup. The regulatory agency has not yet made any final decisions concerning cleanup of the former terminal, although the agency is expected to issue final cleanup orders in 2009.

The lawsuit stay has now been lifted, and two new defendants have been added to the lawsuit by plaintiff in a Third Amended Complaint.  Plaintiff’s Third Amended Complaint alleges that future environmental cleanup costs at the former terminal will exceed $10 million, and that Plaintiff’s past damages exceed $2 million. No trial date has yet been set.

Exxon Mobil Corporation v. GATX Corporation, Kinder Morgan Liquids Terminals, LLC and ST Services, Inc.

On April 23, 2003, Exxon Mobil Corporation filed a complaint in the Superior Court of New Jersey, Gloucester County.  The lawsuit relates to environmental remediation obligations at a Paulsboro, New Jersey liquids terminal owned by ExxonMobil from the mid-1950s through November 1989, by GATX Terminals Corp. from 1989 through September 2000, later owned by Support Terminals.  The terminal is now owned by Pacific Atlantic Terminals, LLC, and it too is a party to the lawsuit.

The complaint seeks any and all damages related to remediating all environmental contamination at the terminal, and, according to the New Jersey Spill Compensation and Control Act, treble damages may be available for actual dollars incorrectly spent by the successful party in the lawsuit.  The parties are currently involved in mandatory mediation and met in June and October 2008.  No progress was made at any of the mediations.  The mediation judge has referred the case back to the litigation court room.

On June 25, 2007, the New Jersey Department of Environmental Protection, the Commissioner of the New Jersey Department of Environmental Protection and the Administrator of the New Jersey Spill Compensation Fund, referred to collectively as the plaintiffs, filed a complaint against ExxonMobil Corporation and Kinder Morgan Liquids Terminals LLC, f/k/a GATX Terminals Corporation.  The complaint was filed in Gloucester County, New Jersey.  Both ExxonMobil and KMLT filed third party complaints against Support Terminals seeking to bring Support Terminals into the case.  Support Terminals filed motions to dismiss the third party complaints, which were denied.  Support Terminals is now joined in the case and it filed an Answer denying all claims.
 
The plaintiffs seek the costs and damages that the plaintiffs allegedly have incurred or will incur as a result of the discharge of pollutants and hazardous substances at the Paulsboro, New Jersey facility.  The costs and damages that the plaintiffs seek include cleanup costs and damages to natural resources.  In addition, the plaintiffs seek an order compelling the defendants to perform or fund the assessment and restoration of those natural resource damages that are the result of the defendants’ actions.  As in the case brought by ExxonMobil against GATX Terminals, the issue is whether the plaintiffs’ claims are within the scope of the indemnity obligations between GATX Terminals (and therefore, Kinder Morgan Liquids Terminals) and Support Terminals.  The court has consolidated the two cases.  All parties participated in mediation on October 26, 2009.

Mission Valley Terminal Lawsuit

In August 2007, the City of San Diego, on its own behalf and purporting to act on behalf of the People of the state of California, filed a lawsuit against us and several affiliates seeking injunctive relief and unspecified damages allegedly resulting from hydrocarbon and MTBE impacted soils and groundwater beneath the city’s stadium property in San Diego arising from historic operations at the Mission Valley terminal facility.  The case was filed in the Superior Court of California, San Diego County, case number 37-2007-00073033-CU-OR-CTL.  On September 26, 2007, we removed the case to the United States District Court, Southern District of California, case number 07CV1883WCAB.  On October 3, 2007, we filed a Motion to Dismiss all counts of the Complaint.  The court denied in part and granted in part the Motion to Dismiss and gave the City leave to amend their complaint.  The City submitted its Amended Complaint and we filed an Answer.  The parties have commenced with discovery.  This site has been, and currently is, under the regulatory oversight and order of the California Regional Water Quality Control Board.

Kinder Morgan Port Manatee Terminal LLC, Palmetto, Florida

On June 18, 2009, our subsidiary Kinder Morgan Port Manatee Terminal LLC received a Revised Warning Letter from the Florida Department of Environmental Protection, referred to in this note as the Florida DEP, advising us of possible regulatory and air permit violations regarding operations at the Port Manatee, Florida terminal.  We previously conducted a voluntary internal audit at this facility in March 2008 and identified various environmental compliance and permitting issues primarily related to air quality compliance.  We reported our findings from this audit in a self-disclosure letter to the Florida DEP in March 2008.  Following the submittal of our self-disclosure letter, the agency conducted numerous inspections of the air pollution control devices at the terminal and issued this Revised Warning Letter.  We intend to schedule a meeting with the Florida DEP to attempt to resolve these issues.

In addition, we have received a subpoena from the U.S. Department of Justice for production of documents related to the service and operation of the Kinder Morgan Port Manatee terminal.  We are fully cooperating with the investigation of this matter.

Other Environmental

We are subject to environmental cleanup and enforcement actions from time to time.  In particular, the CERCLA generally imposes joint and several liability for cleanup and enforcement costs on current and predecessor owners and operators of a site, among others, without regard to fault or the legality of the original conduct.  Our operations are also subject to federal, state and local laws and regulations relating to protection of the environment.  Although we believe our operations are in substantial compliance with applicable environmental law and regulations, risks of additional costs and liabilities are inherent in pipeline, terminal and carbon dioxide field and oil field operations, and there can be no assurance that we will not incur significant costs and liabilities.  Moreover, it is possible that other developments, such as increasingly stringent environmental laws, regulations and enforcement policies thereunder, and claims for damages to property or persons resulting from our operations, could result in substantial costs and liabilities to us.

We are currently involved in several governmental proceedings involving alleged air, water and waste violations issued by various governmental authorities related to compliance with environmental regulations.  As we receive notices of non-compliance, we negotiate and settle these matters.  We do not believe that these alleged violations will have a material adverse effect on our business.
 
We are also currently involved in several governmental proceedings involving groundwater and soil remediation efforts under administrative orders or related state remediation programs issued by various regulatory authorities related to compliance with environmental regulations associated with our assets.  We have established a reserve to address the costs associated with the cleanup.

In addition, we are involved with and have been identified as a potentially responsible party in several federal and state superfund sites.  Environmental reserves have been established for those sites where our contribution is probable and reasonably estimable.  In addition, we are from time to time involved in civil proceedings relating to damages alleged to have occurred as a result of accidental leaks or spills of refined petroleum products, natural gas liquids, natural gas and carbon dioxide.  See “—Pipeline Integrity and Releases” above for additional information with respect to ruptures and leaks from our pipelines.

General

Although it is not possible to predict the ultimate outcomes, we believe that the resolution of the environmental matters set forth in this note will not have a material adverse effect on our business, financial position, results of operations or cash flows.  However, we are not able to reasonably estimate when the eventual settlements of these claims will occur and changing circumstances could cause these matters to have a material adverse impact.  As of September 30, 2009, we have accrued an environmental reserve of $74.9 million, and we believe the establishment of this environmental reserve is adequate such that the resolution of pending environmental matters will not have a material adverse impact on our business, cash flows, financial position or results of operations.  In addition, as of September 30, 2009, we have recorded a receivable of $17.0 million for expected cost recoveries that have been deemed probable.  As of December 31, 2008, our environmental reserve totaled $78.9 million and our estimated receivable for environmental cost recoveries totaled $20.7 million, respectively.  Additionally, many factors may change in the future affecting our reserve estimates, such as (i) regulatory changes; (ii) groundwater and land use near our sites; and (iii) changes in cleanup technology.

Other

We are a defendant in various lawsuits arising from the day-to-day operations of our businesses.  Although no assurance can be given, we believe, based on our experiences to date, that the ultimate resolution of such items will not have a material adverse impact on our business, financial position, results of operations or cash flows.
 
12 MARRIOTT INTERNATIONAL INC /MD/
15. Contingencies

Guarantees

We issue guarantees to certain lenders and hotel owners primarily to obtain long-term management contracts. The guarantees generally have a stated maximum amount of funding and a term of three to 10 years. The terms of guarantees to lenders generally require us to fund if cash flows from hotel operations are inadequate to cover annual debt service or to repay the loan at the end of the term. The terms of the guarantees to hotel owners generally require us to fund if the hotels do not attain specified levels of operating profit. Guarantee fundings to lenders and hotel owners are generally recoverable as loans repayable to us out of future hotel cash flows and/or proceeds from the sale of hotels. We also enter into project completion guarantees with certain lenders in conjunction with hotels and Timeshare segment properties that we or our joint venture partners are building.

The maximum potential amount of future fundings for guarantees where we are the primary obligor and the carrying amount of the liability for expected future fundings at September 11, 2009, are as follows:

 

($ in millions)          

Guarantee Type

   Maximum Potential
Amount of
Future Fundings
   Liability for
Expected Future
Fundings at
September 11, 2009

Debt service

   $ 37    $ 1

Operating profit

     152      26

Other

     102      7
             

Total guarantees where we are the primary obligor

   $ 291    $ 34
             

The liability for expected future fundings at September 11, 2009, is included in our Condensed Consolidated Balance Sheets as follows: $6 million in the “Other payables and accruals” line item and $28 million in the “Other long-term liabilities” line item.

Our guarantees of $291 million listed in the preceding table include $33 million of operating profit guarantees that will not be in effect until the underlying properties open and we begin to operate the properties, along with $3 million of debt service guarantees that will not be in effect until the underlying debt has been funded, and $9 million of other guarantees that will not be in effect until certain requirements are met.

The guarantees of $291 million in the preceding table do not include $179 million of guarantees that we anticipate will expire in the years 2011 through 2013, related to Senior Living Services lease obligations totaling $123 million and lifecare bonds totaling $56 million for which we are secondarily liable. Sunrise Senior Living, Inc. (“Sunrise”) is the primary obligor of the leases and $8 million of the lifecare bonds, and CNL Retirement Properties, Inc., which subsequently merged with Health Care Property Investors, Inc. (“HCP”), is the primary obligor of $46 million of the lifecare bonds. Five Star is the primary obligor of the remainder of the lifecare bonds. Prior to our sale of the Senior Living Services business in 2003, these preexisting guarantees were guarantees by us of obligations of consolidated Senior Living Services subsidiaries. Sunrise and HCP have indemnified us for any guarantee fundings we may be called on to make in connection with these lease obligations and lifecare bonds. While we currently do not expect to fund under the guarantees, according to recent SEC filings made by Sunrise there has been a significant deterioration in Sunrise’s financial position and access to liquidity; accordingly, Sunrise’s continued ability to meet these guarantee obligations cannot be assured.

The table also does not include lease obligations for which we became secondarily liable when we acquired the Renaissance Hotel Group N.V. in 1997, consisting of annual rent payments of approximately $6 million and total remaining rent payments through the initial term of approximately $64 million. Most of these obligations expire at the end of 2020. CTF Holdings Ltd. (“CTF”) had originally made available €35 million in cash collateral in the event that we are required to fund under such guarantees. Approximately €7 million ($9 million) of this cash collateral remained at the end of the 2009 third quarter. Our contingent liability exposure of approximately $64 million will decline to the extent that CTF obtains releases from the landlords or these hotels exit the system. Since the time we assumed these guarantees, we have not funded any amounts and we do not expect to fund any amounts under these guarantees in the future.

In addition to the guarantees noted in the preceding table, we have provided a project completion guarantee to a lender for a project with an estimated aggregate total cost of $586 million. Payments for cost overruns for this project will be satisfied by the joint venture through contributions from the partners, and we are liable on a several basis with our partners in an amount equal to our pro rata ownership in the joint venture, which is 34 percent. We do not expect to fund under the guarantee. At the end of the 2009 third quarter, the carrying value of the liabilities associated with this project completion guarantee was $6 million. We have provided a project completion guarantee to another lender for a project with an estimated aggregate total cost of CAD $466 million (USD $427 million). Payments for cost overruns for this project will be satisfied by the joint venture through contributions from the partners, and we are liable on a several basis with our partners in an amount equal to our pro rata ownership in the joint venture, which is 20 percent. We do not expect to fund under the guarantee. At September 11, 2009, the carrying value of the liabilities associated with this project completion guarantee was $3 million.

In addition to the guarantees described in the preceding paragraphs, in conjunction with financing obtained for specific projects or properties owned by joint ventures in which we are a party, we may provide industry standard indemnifications to the lender for loss, liability, or damage occurring as a result of the actions of the other joint venture owner or our own actions.

Commitments and Letters of Credit

In addition to the guarantees noted previously, we had the following commitments outstanding as of September 11, 2009:

 

   

$5 million of loan commitments we have extended to owners of lodging properties, under which we expect to fund approximately $3 million, in two to three years. We do not expect to fund the remaining $2 million of commitments, $1 million of which will expire in two to three years and $1 million of which will expire after six years.

 

   

Commitments to invest up to $50 million of equity for noncontrolling interests in partnerships that plan to purchase North American full-service and limited-service properties or purchase or develop hotel-anchored mixed-use real estate projects. We expect to fund $40 million of these commitments in two to three years and $10 million after three years. If not funded, $30 million of these investment commitments will expire within three years, and $20 million will expire in more than three years.

 

   

A commitment, with no expiration date, to invest up to $12 million in a joint venture for development of a new property that we expect to fund in two to three years.

 

   

A commitment, with no expiration date, to invest up to $7 million in a joint venture that we do not expect to fund.

 

   

A commitment, subject to certain conditions, to invest up to $50 million (€35 million) into a new fund, which we expect will be capitalized and launched within six to 18 months, to purchase or develop Marriott brand hotels in Western Europe that will be managed exclusively by us. After the initial closing of the fund, we expect that our commitment will expire after four years subject to a one-year extension option with funding occurring over time during that period.

 

   

A commitment to invest up to $29 million (€20 million) in a joint venture in which we are a partner. We do not expect to fund under this commitment.

 

   

We have two commitments aggregating to $139 million to purchase units upon completion of construction for use in our Asia Pacific points and the Ritz-Carlton Destination Club programs. We have already made deposits of $21 million in conjunction with these commitments, and we expect to make the remaining payment of $118 million in 2010.

At September 11, 2009, we also had $118 million of letters of credit outstanding, the majority of which related to our self-insurance programs. Surety bonds issued as of September 11, 2009, totaled $405 million, the majority of which were requested by federal, state or local governments related to our lodging operations, including our Timeshare segment and self-insurance programs.

 

13 MARSH & MCLENNAN COMPANIES, INC.
16. Claims, Lawsuits and Other Contingencies

Brokerage Compensation Practices Settlement and Related Matters

In January 2005, MMC and its subsidiary Marsh Inc. entered into an agreement with the New York State Attorney General (“NYAG”) and the New York State Insurance Department to settle a civil complaint filed in New York State court by NYAG in October 2004 (the “NYAG Lawsuit”) and a related citation issued by the Insurance Department. Among other things, the NYAG Lawsuit and the citation alleged that Marsh’s use of market service agreements with various insurance companies entailed fraudulent business practices, bid-rigging, illegal restraint of trade and other statutory violations.

 

Following the filing of the NYAG Lawsuit, various state regulators and attorneys general initiated investigations relating to the conduct alleged in the NYAG Lawsuit. Over the past year, MMC and Marsh entered into settlements with attorneys general or state regulators in ten states. One action filed by the Attorney General of the State of Ohio against MMC, Marsh and certain Marsh subsidiaries remains pending.

Numerous private party lawsuits were also commenced against MMC, one or more of its subsidiaries, and their current and former directors and officers, relating to matters alleged in the NYAG Lawsuit. These lawsuits include the following:

Policyholder Claims

 

¡  

Various putative class actions that were consolidated into two actions in the U.S. District Court for the District of New Jersey (one on behalf of a purported class of “commercial” policyholders and the second on behalf of a purported class of “employee benefit” policyholders) included claims against MMC, Marsh and certain Marsh subsidiaries. In February 2009, the trial court approved a settlement of the claims against MMC, Marsh and certain Marsh subsidiaries in both actions. The court’s approval of the settlement has been appealed.

 

¡  

Sixteen actions instituted by individual policyholders are pending in federal and state courts relating to matters alleged in the NYAG Lawsuit. One putative class action is pending in Canada.

Shareholder Claims

Following the announcement of the NYAG Lawsuit and related actions taken by MMC, MMC’s stock price dropped from approximately $45 per share to a low of approximately $22.75 per share. The number of shares outstanding at the time was approximately 526 million. The plaintiffs in the securities claims described below have asserted damages in the billions of dollars.

 

¡  

A purported securities class action against MMC, Marsh and certain of their former officers is pending in the U.S. District Court for the Southern District of New York. Plaintiffs make factual allegations similar to those asserted in the NYAG Lawsuit, including that MMC artificially inflated its share price by making misrepresentations and omissions relating to Marsh’s market service agreements and business practices. Plaintiffs also allege that MMC failed to disclose alleged anti-competitive and illegal practices at Marsh, such as “bid-rigging” and soliciting fictitious quotes. Plaintiffs allege violations of Sections 10(b) and 20(a) of the Securities Exchange Act of 1934 and Section 11 of the Securities Act of 1933 and seek unspecified damages. The parties have been engaged in a mediation process; however, no agreement has been reached to settle this case. At this time, MMC is unable to determine if a settlement is likely to occur. Discovery in this matter is near conclusion and trial is expected to commence in 2010.

 

¡  

A purported ERISA class action is pending against MMC and various current and former employees, officers and directors in the U.S. District Court for the Southern District of New York on behalf of participants and beneficiaries of an MMC retirement plan. The complaint alleges, among other things, that in light of the alleged misconduct described in the NYAG Lawsuit, the defendants knew or should have known that the investment of the plan’s assets in MMC stock was imprudent, that certain defendants failed to provide plan participants with complete and accurate information about MMC stock, that certain defendants responsible for selecting, removing and monitoring other fiduciaries did not comply with ERISA, and that MMC knowingly participated in other defendants’ breaches of fiduciary duties. The complaint seeks, among other things, unspecified compensatory damages, injunctive relief and attorneys’ fees and costs. Discovery in this matter is near conclusion and trial is expected to commence in 2010.

 

¡  

Several shareholder derivative actions are pending against MMC’s current and former directors and officers. Most of these actions have been consolidated into two proceedings, one in the Court of Chancery of the State of Delaware, and one in the U.S. District Court for the Southern District of New York. These actions allege, among other things, breach of fiduciary duties with respect to the alleged misconduct described in the NYAG Lawsuit, and that the defendants are liable for and must contribute to or indemnify MMC for any related damages MMC has suffered. The consolidated action in federal court in New York has been stayed in favor of the consolidated action in Delaware. In June 2009, the Delaware court denied a motion to dismiss filed by MMC, Marsh and certain other defendants.

Other Claims

 

¡  

A shareholder derivative suit in the Delaware Court of Chancery against the directors and officers of American International Group, Inc. (“AIG”) and other parties also named as additional defendants MMC, Marsh and certain Marsh subsidiaries. The suit alleged that MMC, Marsh and the Marsh subsidiaries engaged in conspiracy and fraud with respect to the alleged misconduct described in the NYAG Lawsuit, and that they aided and abetted current and former directors and officers of AIG in breaching their fiduciary duties to AIG with respect to AIG’s participation in the alleged misconduct. The complaint sought damages including the return of all contingent commissions paid by AIG to MMC and Marsh. In June 2009, the Delaware court granted a motion to dismiss all claims against MMC and the Marsh defendants. The dismissal has been appealed and is currently pending in the Delaware Supreme Court.

Other Governmental Inquiries and Claims Relating to MMC and its Subsidiaries

 

¡  

In December 2007, the Alaska Retirement Management Board filed a civil lawsuit against Mercer (US) Inc. in Alaska state court. An amended complaint was filed in May 2009. The amended complaint alleges professional negligence and malpractice, breach of contract, breach of implied covenant of good faith and fair dealing, negligent misrepresentation, unfair trade practices and fraud and misrepresentation related to actuarial services that Mercer provided to the Alaska Division of Retirement and Benefits relating to the Alaska Public Employees Retirement System and the Alaska Teachers Retirement System. The amended complaint seeks damages of “at least $2.8 billion”, treble damages related to the unfair trade practices claim, punitive damages, attorneys’ fees, costs and interest. Mercer has filed a motion to dismiss the amended complaint. Discovery is ongoing in this matter and trial is currently scheduled for March 2010.

 

¡  

In October 2007, the State of Connecticut brought a civil action against Guy Carpenter in Connecticut state court, alleging that Guy Carpenter violated the state’s antitrust and unfair trade practices laws by engaging in allocation of markets, price-fixing and other allegedly improper conduct by taking part in the operation of several reinsurance facilities over a period of decades. An amended complaint was filed in October 2009. The amended complaint alleges damages to Guy Carpenter’s insurance company clients and their customers, as well as to the general economy of Connecticut, and seeks monetary damages, civil penalties, attorneys’ fees, costs and injunctive and other equitable relief. Discovery is underway in this matter.

 

¡  

Our activities are regulated extensively under the laws of the United States and its various states, the European Union and its member states, and the other jurisdictions in which we operate. Therefore, in the ordinary course of business, in addition to private party lawsuits, we may be subject to investigations, lawsuits and/or other regulatory actions undertaken by governmental authorities.

Other Contingencies Relating to MMC and its Subsidiaries

Errors and Omissions Claims

 

¡  

MMC and its subsidiaries are subject to a significant number of other claims, lawsuits and proceedings in the ordinary course of business. Such claims and lawsuits consist principally of alleged errors and omissions in connection with the performance of professional services. Certain of these claims, including the action filed against Mercer by the Alaska Retirement Management Board, seek damages, including punitive damages, in amounts that could, if awarded, be significant. In establishing liabilities for errors and omissions claims in accordance with FASB ASC Topic No. 450 (“Contingencies”), MMC utilizes internal actuarial and other estimates, and case level reviews by inside and outside counsel. A liability is established when a loss is both probable and reasonably estimable. The liability is reviewed quarterly and adjusted as developments warrant. In many cases, including the lawsuit brought by the Alaska Retirement Management Board against Mercer, MMC has not recorded a liability, other than for legal fees to defend the claim, because MMC is unable, at the present time, to make a determination that a loss is both probable and reasonably estimable.

To the extent that expected losses exceed MMC’s deductible in any policy year, MMC also records an asset for the amount that MMC expects to recover under any available third-party insurance programs. MMC has varying levels of third-party insurance coverage, with policy limits and coverage terms varying significantly by policy year. MMC is not aware of coverage defenses or other obstacles to coverage that would limit recoveries through policy year 2001-2002 in a material amount. In policy years subsequent to 2001-2002, the availability of third-party insurance has declined significantly, such that the Company has, for example, only limited third-party insurance for the lawsuit brought by the Alaska Retirement Management Board against Mercer.

Guarantees

 

¡  

In connection with its acquisition of U.K.-based Sedgwick Group in 1998, MMC acquired several insurance underwriting businesses that were already in run-off, including River Thames Insurance Company Limited (“River Thames”), which MMC sold in 2001. Sedgwick guaranteed payment of claims on certain policies underwritten through the Institute of London Underwriters (the “ILU”) by River Thames. The policies covered by this guarantee are reinsured up to £40 million by a related party of River Thames. Payment of claims under the reinsurance agreement is collateralized by segregated assets held in a trust. As of September 30, 2009, the reinsurance coverage exceeded the best estimate of the projected liability of the policies covered by the guarantee. To the extent River Thames or the reinsurer is unable to meet its obligations under those policies, a claimant may seek to recover from MMC under the guarantee.

 

¡  

From 1980 to 1983, MMC owned indirectly the English & American Insurance Company (“E&A”), which was a member of the ILU. The ILU required MMC to guarantee a portion of E&A’s obligations. After E&A became insolvent in 1993, the ILU agreed to discharge the guarantee in exchange for MMC’s agreement to post an evergreen letter of credit that is available to pay claims by policyholders on certain E&A policies issued through the ILU and incepting between July 3, 1980 and October 6, 1983. Certain claims have been paid under the letter of credit and MMC anticipates that additional claimants may seek to recover against the letter of credit.

Putnam-related Matters

On August 3, 2007, Great-West Lifeco Inc. (“GWL”) completed its purchase of Putnam Investments Trust from MMC. Under the terms of the stock purchase agreement with GWL, a copy of which was included as an exhibit to MMC’s Current Report on Form 8-K filed on February 1, 2007, MMC agreed to indemnify GWL in the future with respect to certain Putnam-related litigation and regulatory matters. The matters described below directly involve MMC and/or may be subject to these indemnification obligations.

In 2003 and 2004, Putnam entered into settlements with the SEC and the Commonwealth of Massachusetts with respect to excessive short-term trading by, among others, certain former Putnam employees in shares of the Putnam mutual funds (the “Putnam Funds”). MMC and Putnam were named in a substantial number of civil complaints, filed in various state and federal courts, alleging “market-timing” and, in some cases, “late trading” activities. The actions filed in or removed to federal court have been transferred, along with actions against other mutual fund complexes, to the U.S. District Court for the District of Maryland. The following summarizes the consolidated matters pending in the District of Maryland:

 

  ¡  

Two putative class actions by investors in certain Putnam Funds are pending against Putnam. One action asserts claims under Sections 10(b) and 20(a) of the Securities Exchange Act of 1934, and Section 36(b) of the Investment Company Act of 1940. The other action purports to assert derivative claims on behalf of all Putnam Funds under Section 36(b) of the Investment Company Act. Both suits seek to recover unspecified damages allegedly suffered by the Putnam Funds and their investors as a result of purported market-timing and late trading activity in certain Putnam Funds. In December 2008 and April 2009, the court granted Putnam’s motion for summary judgment in the action relating to securities claims, and the plaintiffs have filed an appeal. In the derivative action, the court denied Putnam’s motion for summary judgment.

 

  ¡  

A complaint asserting shareholder derivative claims, purportedly on behalf of MMC, was filed against current and former members of MMC’s Board of Directors, two of Putnam’s former officers, and MMC as a nominal defendant. This action alleges violation of fiduciary duties in failing to provide oversight regarding market-timing in the Putnam Funds. This action has been stayed pursuant to an agreement of the parties.

 

  ¡  

MMC, Putnam and certain of their current and former officers, directors and employees are defendants in purported ERISA class actions, one brought by participants in an MMC retirement plan and the other brought by participants in a Putnam retirement plan. The actions allege, among other things, that, in view of the market-timing that was allegedly allowed to occur at Putnam, the investment of the plans’ funds in MMC stock and the Putnam Funds was imprudent and constituted a breach of fiduciary duties to plan participants. Both actions seek unspecified damages and equitable relief. Following a September 2006 dismissal of the action regarding the Putnam plan, the plaintiff appealed the decision to the Fourth Circuit Court of Appeals. In June 2008, the appellate court reversed the dismissal and remanded the case for further proceedings.

The proceedings and other matters described in this Note 16 on Claims, Lawsuits and Other Contingencies may expose MMC to liability for significant monetary damages and other forms of relief. Where a loss is both probable and reasonably estimable, MMC establishes liabilities in accordance with FASB ASC Topic No. 450 (“Contingencies”). Except as specifically set forth above, MMC is unable, at the present time, to provide a reasonable estimate of the range of possible loss attributable to these matters or the impact they may have on MMC’s consolidated results of operations or financial position or MMC’s cash flows. This is primarily because many of these matters are in early stages of litigation in which discovery is ongoing or are still developing. Adverse determinations in one or more of the matters discussed above could have a material impact on MMC’s financial condition, results of MMC’s operations or cash flows in a future period.

 

14 MICROSOFT CORP

NOTE 15    CONTINGENCIES

Government Competition Law Matters

In March 2004, the European Commission issued a competition law decision that, among other things, ordered us to license certain Windows server protocol technology to our competitors. In March 2007, the European Commission issued a statement of objections claiming that the pricing terms we proposed for licensing the technology as required by the March 2004 decision were “not reasonable.” Following additional steps we took to address these concerns, the Commission announced on October 22, 2007 that we were in compliance with the March 2004 decision and that no further penalty should accrue after that date. On February 27, 2008, the Commission issued a fine of $1.4 billion (899 million) relating to the period prior to October 22, 2007. In May 2008, we filed an application with the European Court of First Instance to annul the February 2008 fine. We paid the $1.4 billion (899 million) fine in June 2008, pending the outcome of the appeal.

In January 2008 the Commission opened a competition law investigation relating to the inclusion of various capabilities in our Windows operating system software, including Web browsing software. The investigation was precipitated by a complaint filed with the Commission by Opera Software ASA, a firm that offers Web browsing software. On January 15, 2009, the European Commission issued a statement of objections expressing the Commission’s preliminary view that the inclusion of Internet Explorer in Windows since 1996 has violated European competition law. According to the statement of objections, other browsers are foreclosed from competing because Windows includes Internet Explorer. On October 7, 2009, the Commission announced its preliminary view that a set of commitments offered by Microsoft would resolve the Commission’s competition law concerns. These commitments broadly ensure that computer manufacturers will remain free to install any browser on the PCs they ship and they provide for a Web browser ballot mechanism so that end users throughout Europe are offered a choice of browsers. The Commission stated that it intends to issue a decision making these commitments legally binding, subject to the results of a of a 30-day public comment period.

In January 2008 the Commission also opened a competition law investigation that relates primarily to interoperability with respect to our Microsoft Office family of products. This investigation resulted from complaints filed with the Commission by a trade association of Microsoft’s competitors. Microsoft has made a number of proposals to address the Commission’s competition law concerns in this area. The Commission also indicated in its October 7, 2009 statement that it may consider the commitments described above to provide a sufficient basis to resolve these competition law concerns.

We are subject to a Consent Decree and Final Judgment (“Final Judgments”) that resolved lawsuits brought by the U.S. Department of Justice, 18 states, and the District of Columbia in two separate actions. The Final Judgments imposed various constraints on our Windows operating system businesses. Originally, the Final Judgments were scheduled to expire in November 2007. In 2006, we voluntarily agreed to extend certain elements of the Final Judgments to November 2009. The U.S. Department of Justice and other states advised the Court that they would not seek any extension of the Final Judgments to which they are party. In January 2008, the court issued a decision granting the states’ motion to extend these additional provisions of the Final Judgments until November 2009. On April 16, 2009, we agreed with the Department of Justice and the states, respectively, to extend the Final Judgments to May 2011, and submitted to the U.S. District Court for the District of Columbia joint motions for this extension. In April 2009, the Court entered an order approving the extension.

In other ongoing investigations, various foreign governments and several state attorneys general have requested information from us concerning competition, privacy, and security issues.

Antitrust, Unfair Competition, and Overcharge Class Actions

A large number of antitrust and unfair competition class action lawsuits were filed against us in various state, federal, and Canadian courts on behalf of various classes of direct and indirect purchasers of our PC operating system and certain other software products. We obtained dismissals of damages claims of indirect purchasers under federal law and in 15 states. Courts refused to certify classes in two additional states. We have reached agreements to settle all claims that have been made to date in 19 states and the District of Columbia.

Under the settlements, generally class members can obtain vouchers that entitle them to be reimbursed for purchases of a wide variety of platform-neutral computer hardware and software. The total value of vouchers that we may issue varies by state. We will make available to certain schools a percentage of those vouchers that are not issued or claimed (one-half to two-thirds depending on the state). The total value of vouchers we ultimately issue will depend on the number of class members who make claims and are issued vouchers. The maximum value of vouchers to be issued is approximately $2.7 billion. The actual costs of these settlements will be less than that maximum amount, depending on the number of class members and schools that are issued and redeem vouchers.

The settlements in all states except Arizona have received final court approval. Cases in Canada have not been settled. We estimate the total cost to resolve all of the overcharge class action cases will range between $1.8 billion and $2.1 billion. The actual cost depends on factors such as the claim rate, the quantity and mix of products for which claims are made, the number of eligible class members who ultimately use the vouchers, the nature of hardware and software that is acquired using the vouchers, and the cost of administering the claims. At September 30, 2009, we have recorded a liability related to these claims of approximately $800 million, which reflects our estimated exposure of $1.8 billion less payments made to date of approximately $1.0 billion mostly for vouchers, legal fees, and administrative expenses.

Other Antitrust Litigation and Claims

In November 2004, Novell, Inc. filed a complaint in U.S. District Court, asserting antitrust and unfair competition claims against us related to Novell’s ownership of WordPerfect and other productivity applications during the period between June 1994 and March 1996. This case was transferred to Maryland. In June 2005, the trial court granted our motion to dismiss four of six claims of the complaint. Both parties appealed, and in October 2007, the court of appeals affirmed the decision of the trial court, and remanded the case to that court for further proceedings. Fact discovery has closed and summary judgment motions were filed in October 2009.

Patent and Intellectual Property Claims

In 2003 we filed an action in U.S. District Court in California seeking a declaratory judgment that we do not infringe certain Alcatel-Lucent patents (although this action began before the merger of Alcatel and Lucent in 2006, for simplicity we refer to the post-merger entity of Alcatel-Lucent). In April 2008, a jury returned a verdict in Alcatel-Lucent’s favor in a trial on a consolidated group of one video and three user interface patents. The jury concluded that we had infringed two user interface patents and awarded $367 million in damages. In June 2008, the trial judge increased the amount of damages to $512 million to include $145 million of interest. We appealed that award to the Federal Circuit. In December 2008, we entered into a settlement agreement resolving all other litigation pending between Microsoft and Alcatel-Lucent, leaving approximately $500 million remaining in dispute. In April 2009, the U.S. Patent and Trademark Office, after a reexamination of the remaining patent in dispute, determined that the patent was invalid and Alcatel-Lucent has appealed that ruling. On September 11, 2009, the United States Court of Appeals for the Federal Circuit affirmed the liability award but vacated the verdict and remanded the case to the trial court for a re-trial of the damages ruling, indicating the damages previously awarded were too high.

 

In October 2003, Uniloc USA Inc., a subsidiary of a Singapore-based security technology company, filed a patent infringement suit in U.S. District Court in Rhode Island, claiming that product activation technology in Windows XP and certain other Microsoft programs violated a Uniloc patent. After we obtained a favorable summary judgment that we did not infringe any of the claims of this patent, the court of appeals vacated the trial court decision and remanded the case for trial. In April 2009, the jury returned a $388 million verdict against us, including a finding of willful infringement. On September 29, 2009, the district court judge overturned the jury verdict, ruling that the evidence did not support the jury’s finding that Microsoft infringed the patent.

In March 2007, i4i Limited Partnership, based in Canada, sued Microsoft in U.S. District Court in Texas, claiming that certain custom XML technology in Word 2003 and 2007 infringed i4i’s patent. In May 2009, a jury returned a verdict against us, finding damages of $200 million and that we willfully infringed the patent. In August 2009, the court denied our post-trial motions and also awarded enhanced damages of $40 million, prejudgment interest of $37 million and issued a permanent injunction prohibiting additional distribution of the allegedly infringing technology. The appellate court stayed the injunction pending our appeal.

There are over 50 other patent infringement cases pending against Microsoft, 10 of which are set for trial in fiscal year 2010. These include a lawsuit filed by JuxtaComm Technologies, Inc. against us and other defendants in U.S. District Court in Texas. JuxtaComm claims that technologies in several Microsoft products including SQL Server, Visual Studio, Visio, and .Net Framework infringe a JuxtaComm patent relating to data integration. Trial has been scheduled for November 2009. Another lawsuit was filed against Microsoft by VirnetX Inc. in U.S. District Court in Texas in which VirnetX asserts that various Microsoft products including Windows client and server operating systems software and communications software infringe patents relating to certain secure Internet communications. Trial is scheduled for March 2010.

Other

We also are subject to a variety of other claims and suits that arise from time to time in the ordinary course of our business. Although management currently believes that resolving claims against us, individually or in aggregate, will not have a material adverse impact on our financial position, our results of operations, or our cash flows, these matters are subject to inherent uncertainties and management’s view of these matters may change in the future.

As of September 30, 2009, we had accrued aggregate liabilities of approximately $700 million in other current liabilities and approximately $400 million in other long-term liabilities for all of the contingent matters described in this note. While we intend to vigorously defend these matters, there exists the possibility of adverse outcomes that we estimate could be up to $1.9 billion in aggregate beyond recorded amounts. The foregoing amount does not include the January 15, 2009 European Commission statement of objections, the outcome and range of which is not reasonably estimable. Were unfavorable final outcomes to occur, there exists the possibility of a material adverse impact on our financial position, results of operations, and cash flows for the period in which the effects become reasonably estimable.

15 MIRANT CORP

K. Litigation and Other Contingencies

The Company is involved in a number of significant legal proceedings. In certain cases, plaintiffs seek to recover large and sometimes unspecified damages, and some matters may be unresolved for several years. The Company cannot currently determine the outcome of the proceedings described below or the ultimate amount of potential losses and therefore has not made any provision for such matters unless specifically noted below. Pursuant to guidance related to accounting for contingencies, management provides for estimated losses to the extent information becomes available indicating that losses are probable and that the amounts are reasonably estimable. Additional losses could have a material adverse effect on the Company’s results of operations, financial position or cash flows.

Environmental Matters

EPA Information Request.    In January 2001, the EPA issued a request for information to Mirant concerning the implications under the EPA’s NSR regulations promulgated under the Clean Air Act of past repair and maintenance activities at the Potomac River facility in Virginia and the Chalk Point, Dickerson and Morgantown facilities in Maryland. The requested information concerned the period of operations that predates the ownership and lease of those facilities by Mirant Potomac River, Mirant Chalk Point and Mirant Mid-Atlantic. Mirant responded fully to this request. Under the APSA, Pepco is responsible for fines and penalties arising from any violation of the NSR regulations associated with operations prior to the acquisition or lease of the facilities by Mirant Potomac River, Mirant Chalk Point and Mirant Mid-Atlantic. If a violation is determined to have occurred at any of the facilities, Mirant Potomac River, Mirant Chalk Point and Mirant Mid-Atlantic, as the owner or lessee of the facility, may be responsible for the cost of purchasing and installing emissions control equipment, the cost of which may be material. Mirant Chalk Point and Mirant Mid-Atlantic have installed and are installing a variety of emissions control equipment on the Chalk Point, Dickerson and Morgantown facilities in Maryland to comply with the Maryland Healthy Air Act, but that equipment may not include all of the emissions control equipment that could be required if a violation of the EPA’s NSR regulations is determined to have occurred at one or more of those facilities. If such a violation is determined to have occurred after the acquisition or lease of the facilities by Mirant Potomac River, Mirant Chalk Point and Mirant Mid-Atlantic or, if occurring prior to the acquisition or lease, is determined to constitute a continuing violation, Mirant Potomac River, Mirant Chalk Point or Mirant Mid-Atlantic could also be subject to fines and penalties by the state or federal government for the period after its acquisition or lease of the facility at issue, the cost of which may be material, although applicable bankruptcy law may bar such liability for periods prior to January 3, 2006, when the Plan became effective for Mirant Potomac River, Mirant Chalk Point and Mirant Mid-Atlantic.

Faulkner Fly Ash Facility.    By letter dated April 2, 2008, the Environmental Integrity Project and the Potomac Riverkeeper notified Mirant and various of its subsidiaries that they and certain individuals intend to file suit alleging that violations of the Clean Water Act are occurring at the Faulkner Fly Ash Facility owned by Mirant MD Ash Management. The April 2, 2008, letter alleges that the Faulkner facility discharges certain pollutants at levels that exceed Maryland’s water quality criteria, that it discharged certain pollutants without obtaining an appropriate National Pollutant Discharge Elimination System (“NPDES”) permit, and that Mirant MD Ash Management failed to perform monthly monitoring required under an applicable NPDES permit. The letter indicated that the organizations intend to file suit to enjoin the violations alleged, to obtain civil penalties for past violations occurring after January 3, 2006, and to recover attorneys’ fees. Mirant disputes the allegations of violations of the Clean Water Act made by the two organizations in the April 2, 2008, letter.

 

In May 2008, the MDE filed a complaint in the Circuit Court for Charles County, Maryland, against Mirant MD Ash Management and Mirant Mid-Atlantic. The complaint alleges violations of Maryland’s water pollution laws similar to those asserted in the April 2, 2008, letter from the Environmental Integrity Project and the Potomac Riverkeeper. The MDE complaint requests that the court (1) prohibit continuation of the alleged unpermitted discharges, (2) require Mirant MD Ash Management and Mirant Mid-Atlantic to cease from disposing of any further coal combustion byproducts at the Faulkner Fly Ash Facility and close and cap the existing disposal cells within one year and (3) assess civil penalties of up to $10,000 per day for each violation. The discharges that are the subject of the MDE’s complaint result from a leachate treatment system installed by Mirant MD Ash Management in accordance with a December 18, 2000, Complaint and Consent Order (the “December 2000 Consent Order”) entered by the Maryland Secretary of the Environment, Water Management Administration pursuant to an agreement between the MDE and Pepco, the previous owner of the Faulkner Fly Ash Facility. Mirant MD Ash Management and Mirant Mid-Atlantic on July 23, 2008, filed a motion seeking dismissal of the MDE complaint, arguing that the discharges are permitted by the December 2000 Consent Order. In September 2009, the court denied a motion by Environmental Integrity Project seeking to intervene as a party to the suit and the Environmental Integrity Project has appealed that ruling.

Suit Regarding Chalk Point Emissions.    On June 25, 2009, the Chesapeake Climate Action Network and four individuals filed a complaint against Mirant Mid-Atlantic and Mirant Chalk Point in the United States District Court for the District of Maryland. The plaintiffs allege that Mirant Chalk Point has violated the Clean Air Act and Maryland environmental regulations by failing to install controls to limit emissions of particulate matter on unit 3 and unit 4 of the Chalk Point generating facility, which at times burn residual fuel oil. The plaintiffs seek to enjoin the alleged violations, to obtain civil penalties of up to $32,500 per day for past noncompliance and to recover attorney’s fees. Mirant Mid-Atlantic and Mirant Chalk Point dispute the plaintiffs’ allegations of violations of the Clean Air Act and Maryland environmental regulations.

Riverkeeper Suit Against Mirant Lovett.    On March 11, 2005, Riverkeeper, Inc. filed suit against Mirant Lovett in the United States District Court for the Southern District of New York under the Clean Water Act. The suit alleges that Mirant Lovett failed to implement a marine life exclusion system at its Lovett generating facility and to perform monitoring for the exclusion of certain aquatic organisms from the facility’s cooling water intake structures in violation of Mirant Lovett’s water discharge permit issued by the State of New York. The plaintiff requested the court to impose civil penalties of $32,500 per day of violation and to award the plaintiff attorneys’ fees. Mirant Lovett’s view is that it complied with the terms of its water discharge permit, as amended by a Consent Order entered June 29, 2004. Mirant Lovett has filed a motion seeking dismissal of the suit on the grounds that it complied with the terms of its water discharge permit, the closure of the Lovett generating facility in April 2008 moots the plaintiff’s request for injunctive relief, and the discharge in bankruptcy received by Mirant Lovett in 2007 bars any claim for penalties.

Notices of Intent to Sue for Alleged Violations of the Endangered Species Act.    By letter dated September 27, 2007, the Coalition for a Sustainable Delta, four water districts, and an individual (the “Noticing Parties”) provided notice to Mirant and Mirant Delta of their intent to file suit alleging that Mirant Delta has violated, and continues to violate, the Federal Endangered Species Act through the operation of its Contra Costa and Pittsburg generating facilities. The Noticing Parties contend that the facilities use of water drawn from the Sacramento-San Joaquin Delta for cooling purposes results in harm to four species of fish listed as endangered species. The Noticing Parties assert that Mirant Delta’s authorizations to take (i.e., cause harm to) those species, a biological opinion and incidental take statement issued by the National Marine Fisheries Service on October 17, 2002, for three of the fish species and a biological opinion and incidental take statement issued by the United States Fish and Wildlife Service on November 4, 2002, for the fourth fish species, have been violated by Mirant Delta and no longer apply to permit the effects on the four fish species caused by the operation of the Contra Costa and Pittsburg generating facilities. Following receipt of these letters, in late October 2007, Mirant Delta received correspondence from the United States Fish and Wildlife Service, the National Marine Fisheries Service and the United States Army Corps of Engineers (the “Corps”) clarifying that Mirant Delta continued to be authorized to take the four species of fish protected under the Federal Endangered Species Act. The agencies have initiated a process that will review the environmental effects of Mirant Delta’s water usage, including effects on the protected species of fish. That process could lead to changes in the manner in which Mirant Delta can use river water for the operation of the Contra Costa and Pittsburg generating facilities. In a subsequent letter, the Coalition for a Sustainable Delta also alleged violations of the National Environmental Policy Act and the California Endangered Species Act associated with the operation of Mirant Delta’s facilities. On May 14, 2009, the Coalition for a Sustainable Delta, Kern County Water Agency and an individual sent a new notice of intent to sue to the Corps alleging that the Corps had violated the Federal Endangered Species Act by issuing permits related to the operation of Mirant Delta’s Contra Costa and Pittsburg generating facilities without ensuring that conservation measures would be implemented to minimize and mitigate the harm to the four endangered fish species and their habitat allegedly resulting from such operation. Mirant Delta disputes the allegations made by the Noticing Parties and those made in the May 14, 2009, notice.

Chapter 11 Proceedings

On July 14, 2003, and various dates thereafter, Mirant Corporation and certain of its subsidiaries (collectively, the “Mirant Debtors”) filed voluntary petitions for relief under Chapter 11 of the Bankruptcy Code in the Bankruptcy Court. Mirant and most of the Mirant Debtors emerged from bankruptcy on January 3, 2006, when the Plan became effective. The remaining Mirant Debtors (Mirant New York, Mirant Bowline, Mirant Lovett, Mirant NY-Gen and Hudson Valley Gas) emerged from bankruptcy on various dates in 2007. As of September 30, 2009, approximately 837,000 of the shares of Mirant common stock to be distributed under the Plan had not yet been distributed and have been reserved for distribution with respect to claims disputed by the Mirant Debtors that have not been resolved. Under the terms of the Plan, upon the resolution of such a disputed claim, the claimant will receive the same pro rata distributions of Mirant common stock, cash, or both common stock and cash as previously allowed claims, regardless of the price at which Mirant common stock is trading at the time the claim is resolved.

To the extent the aggregate amount of the payouts determined to be due with respect to disputed claims ultimately exceeds the amount of the funded claim reserve, Mirant would have to issue additional shares of common stock to address the shortfall, which would dilute existing Mirant stockholders, and Mirant and Mirant Americas Generation would have to pay additional cash amounts as necessary under the terms of the Plan to satisfy such pre-petition claims. If Mirant is required to issue additional shares of common stock to satisfy unresolved claims, certain parties who received approximately 21 million of the 300 million shares of common stock distributed under the Plan are entitled to receive additional shares of common stock to avoid dilution of their distributions under the Plan.

Actions Pursued by MC Asset Recovery

Under the Plan, the rights to certain actions filed by Mirant and various of its subsidiaries against third parties were transferred to MC Asset Recovery. MC Asset Recovery, although wholly-owned by Mirant, is governed by managers who are independent of Mirant and its other subsidiaries. Under the Plan, any cash recoveries obtained by MC Asset Recovery from the actions transferred to it, net of fees and costs incurred in prosecuting the actions, are to be paid to the unsecured creditors of Mirant Corporation in the Chapter 11 proceedings and the holders of the equity interests in Mirant immediately prior to the effective date of the Plan except where such a recovery results in an allowed claim in the bankruptcy proceedings, as described below. MC Asset Recovery is a disregarded entity for income tax purposes, and Mirant is responsible for income taxes related to its operations. The Plan provides that Mirant may not reduce payments to be made to unsecured creditors and former holders of equity interests from recoveries obtained by MC Asset Recovery for the taxes owed by Mirant, if any, on any net recoveries up to $175 million. If the aggregate recoveries exceed $175 million net of costs, then under the Plan Mirant may reduce the payments to be made to such unsecured creditors and former holders of equity interests by the amount of any taxes it will owe or NOLs utilized with respect to taxable income resulting from the amount in excess of $175 million.

The Plan and MC Asset Recovery’s Limited Liability Company Agreement also obligated Mirant to make contributions to MC Asset Recovery as necessary to pay professional fees and certain other costs reasonably incurred by MC Asset Recovery, including expert witness fees and other costs of the actions transferred to MC Asset Recovery. In June 2008, Mirant and MC Asset Recovery, with the approval of the Bankruptcy Court, agreed to limit the total amount of funding to be provided by Mirant to MC Asset Recovery to $67.8 million, and the amount of such funding obligation not already incurred by Mirant at that time was fully accrued. Mirant was entitled to be repaid the amounts it funded from any recoveries obtained by MC Asset Recovery before any distribution was made from such recoveries to the unsecured creditors of Mirant Corporation and the former holders of equity interests.

On March 31, 2009, The Southern Company (“Southern Company”) and MC Asset Recovery entered into a settlement agreement (the “MCAR Settlement”) resolving claims asserted by MC Asset Recovery in MC Asset Recovery, LLC v. Southern Company, a suit that was pending in the Northern District of Georgia (the “Southern Company Litigation”). Southern Company filed a Form 8-K dated April 2, 2009, that described the settlement and the claims that it resolved. Southern Company and MC Asset Recovery finalized certain terms of the settlement on June 8, 2009. Pursuant to the settlement, Southern Company paid $202 million to MC Asset Recovery in settlement of all claims asserted in the Southern Company Litigation. MC Asset Recovery used a portion of that payment to pay fees owed to the managers of MC Asset Recovery and other expenses of MC Asset Recovery not previously funded by Mirant, and it retained $47 million from that payment to fund future expenses and to apply against unpaid expenditures. MC Asset Recovery distributed the remaining $155 million to Mirant. In accordance with the Plan, Mirant has retained approximately $52 million of that distribution as reimbursement for the funds it had provided to MC Asset Recovery and costs it incurred related to MC Asset Recovery that had not been previously reimbursed. In the second quarter of 2009, the Company recognized the $52 million as a reduction of operations and maintenance expense. Pursuant to MC Asset Recovery’s Limited Liability Company Agreement and an order of the Bankruptcy Court dated October 31, 2006, Mirant distributed approximately $1.7 million to the managers of MC Asset Recovery. In September 2009, the remaining approximately $101 million of the amount recovered by MC Asset Recovery was distributed pursuant to the terms of the Plan. Following these distributions, Mirant has no further obligation to provide funding to MC Asset Recovery. As a result, Mirant reversed its remaining accrual of $10 million of funding obligations as a reduction in operations and maintenance expense in the second quarter of 2009. The Company does not expect to owe any taxes related to the MC Asset Recovery settlement with Southern Company. MC Asset Recovery had $45 million of assets included in funds on deposit and $45 million of liabilities included in accounts payable and accrued liabilities in the accompanying unaudited condensed consolidated balance sheet at September 30, 2009.

 

One of the two remaining actions transferred to MC Asset Recovery seeks to recover damages for fraudulent transfers that occurred prior to the filing of Mirant’s bankruptcy proceedings. That action alleges that the defendants engaged in transactions with Mirant at a time when it was insolvent or was rendered insolvent by the resulting transfers and that it did not receive fair value for those transfers. If MC Asset Recovery succeeds in obtaining any recoveries on these avoidance claims transferred to it, the party or parties from which such recoveries are obtained could seek to file claims in Mirant’s bankruptcy proceedings. Mirant would vigorously contest the allowance of any such claims on the ground that, among other things, the recovery of such amounts does not reinstate any enforceable pre-petition obligation that could give rise to a claim. If such a claim were to be allowed by the Bankruptcy Court as a result of a recovery by MC Asset Recovery, then the party receiving the claim would be entitled to either Mirant common stock or such stock and cash as provided under the Plan. Under such circumstances, the order entered by the Bankruptcy Court on December 9, 2005, confirming the Plan provides that Mirant would retain from the net amount recovered an amount equal to the dollar amount of the resulting allowed claim rather than distribute such amount to the unsecured creditors and former equity holders as described above.

California and Western Power Markets

FERC Refund Proceedings Arising Out of California Energy Crisis.    High prices experienced in California and western wholesale electricity markets in 2000 and 2001 caused various purchasers of electricity in those markets to initiate proceedings seeking refunds. Several of those proceedings remain pending either before the FERC or on appeal to the United States Court of Appeals for the Ninth Circuit (the “Ninth Circuit”). The proceedings that remain pending include proceedings (1) ordered by the FERC on July 25, 2001, (the “FERC Refund Proceedings”) to determine the amount of any refunds and amounts owed for sales made by market participants, including Mirant Americas Energy Marketing, in the CAISO or the Cal PX markets from October 2, 2000, through June 20, 2001 (the “Refund Period”), (2) ordered by the FERC to determine whether there had been unjust and unreasonable charges for spot market bilateral sales in the Pacific Northwest from December 25, 2000, through June 20, 2001 (the “Pacific Northwest Proceeding”), and (3) arising from a complaint filed in 2002 by the California Attorney General that sought refunds for transactions conducted in markets administered by the CAISO and the Cal PX outside the Refund Period set by the FERC and for transactions between the DWR and various owners of generation and power marketers, including Mirant Americas Energy Marketing and subsidiaries of Mirant Americas Generation. Various parties appealed the FERC orders related to these proceedings to the Ninth Circuit seeking review of a number of issues, including changing the Refund Period to include periods prior to October 2, 2000, and expanding the sales of electricity subject to potential refund to include bilateral sales made to the DWR and other parties. While various of these appeals remain pending, the Ninth Circuit ruled in orders issued on August 2, 2006, and September 9, 2004, that the FERC should consider further whether to grant relief for sales of electricity made in the CAISO and Cal PX markets prior to October 2, 2000, at rates found to be unjust, and, in the proceeding initiated by the California Attorney General, what remedies, including potential refunds, are appropriate where entities, including Mirant Americas Energy Marketing, purportedly did not comply with certain filing requirements for transactions conducted under market-based rate tariffs.

On January 14, 2005, Mirant and certain of its subsidiaries (the “Mirant Settling Parties”) entered into a Settlement and Release of Claims Agreement (the “California Settlement”) with PG&E, Southern California Edison Company, San Diego Gas and Electric Company, the CPUC, the DWR, the EOB and the Attorney General of the State of California (collectively, the “California Parties”). The California Settlement was approved by the FERC on April 13, 2005, and became effective on April 15, 2005, upon its approval by the Bankruptcy Court. The California Settlement resulted in the release of most of Mirant Americas Energy Marketing’s potential liability (1) in the FERC Refund Proceedings for sales made in the CAISO or the Cal PX markets, (2) in the Pacific Northwest Proceeding, and (3) in any proceedings at the FERC resulting from the complaint filed in 2002 by the California Attorney General. Based on the California Settlement, on April 15, 2008, the FERC dismissed Mirant Americas Energy Marketing and the other subsidiaries of the Company from the proceeding initiated by the complaint filed in 2002 by the California Attorney General.

Under the California Settlement, the California Parties and those other market participants who have opted into the settlement have released the Mirant Settling Parties, including Mirant Americas Energy Marketing, from any liability for refunds related to sales of electricity and natural gas in the western markets from January 1, 1998, through July 14, 2003. Also, the California Parties have assumed the obligation of Mirant Americas Energy Marketing to pay any refunds determined by the FERC to be owed by Mirant Americas Energy Marketing to other parties that do not opt into the settlement for transactions in the CAISO and Cal PX markets during the Refund Period, with the liability of the California Parties for such refund obligation limited to the amount of certain receivables assigned by Mirant Americas Energy Marketing to the California Parties under the California Settlement. The settlement did not relieve Mirant Americas Energy Marketing of liability for any refunds that the FERC determines it to owe (1) to participants in the Cal PX and CAISO markets that are not California Parties (or that did not elect to opt into the settlement) for periods outside the Refund Period and (2) to participants in bilateral transactions with Mirant Americas Energy Marketing that are not California Parties (or that did not elect to opt into the settlement).

Resolution of the refund proceedings that remain pending before the FERC or that currently are on appeal to the Ninth Circuit could ultimately result in the FERC concluding that the prices received by Mirant Americas Energy Marketing in some transactions occurring in 2000 and 2001 should be reduced. The Company’s view is that the bulk of any obligations of Mirant Americas Energy Marketing to make refunds as a result of sales completed prior to July 14, 2003, in the CAISO or Cal PX markets or in bilateral transactions either have been addressed by the California Settlement or have been resolved as part of Mirant Americas Energy Marketing’s bankruptcy proceedings. To the extent that Mirant Americas Energy Marketing’s potential refund liability arises from contracts that were transferred to Mirant Energy Trading as part of the transfer of the trading and marketing business under the Plan, Mirant Energy Trading may have exposure to any refund liability related to transactions under those contracts.

Complaint Challenging Capacity Rates Under the RPM Provisions of PJM’s Tariff

On May 30, 2008, a variety of parties, including the state public utility commissions of Maryland, Pennsylvania, New Jersey, and Delaware, ratepayer advocates, certain electric cooperatives, various groups representing industrial electricity users, and federal agencies (the “RPM Buyers”), filed a complaint with the FERC asserting that capacity auctions held to determine capacity payments under PJM’s reliability pricing model (the “RPM”) tariff had produced rates that were unjust and unreasonable. PJM conducted the capacity auctions that are the subject of the complaint to set the capacity payments in effect under the RPM provisions of PJM’s tariff for twelve month periods beginning June 1, 2008, June 1, 2009, and June 1, 2010. The RPM Buyers allege that (i) the time between when the auctions were held and the periods that the resulting capacity rates would be in effect were too short to allow competition from new resources in the auctions, (ii) the administrative process established under the RPM provisions of PJM’s tariff was inadequate to restrain the exercise of market power through the withholding of capacity to increase prices, and (iii) the locational pricing established under the RPM provisions of PJM’s tariff created opportunities for sellers to raise prices while serving no legitimate function. The RPM Buyers asked the FERC to reduce significantly the capacity rates established by the capacity auctions and to set June 1, 2008, as the date beginning on which any rates found by the FERC to be excessive would be subject to refund. If the FERC were to reduce the capacity payments set through the capacity auctions to the rates proposed by the RPM Buyers, the capacity revenue the Company has received or expects to receive for the period June 1, 2008 through May 31, 2011, would be reduced by approximately $600 million. On September 19, 2008, the FERC issued an order dismissing the complaint. The FERC found that no party had violated the RPM provisions of PJM’s tariff and that the prices determined during the auctions were in accordance with the tariff’s provisions. The RPM Buyers filed a request for rehearing, which the FERC denied on June 18, 2009. Certain of the RPM Buyers have appealed the orders entered by the FERC to the United States Court of Appeals for the Fourth Circuit.

Other Legal Matters

The Company is involved in various other claims and legal actions arising in the ordinary course of business. In the opinion of management, the ultimate disposition of these matters will not have a material adverse effect on the Company’s results of operations, financial position or cash flows.

16 MURPHY OIL CORP /DE

Note L – Commitments and Contingencies

In September 2009, the Company entered into a forward sales contract to mitigate the price risk for a portion of the natural gas sales volumes in 2010 related to its Tupper field in Western Canada. The contract calls for natural gas deliveries of approximately 33 million cubic feet per day during 2010 and is priced at Cdn$5.30 per thousand cubic feet at the AECO “c” sales point. The contract will be accounted for as a normal sale for accounting purposes.

The Company’s operations and earnings have been and may be affected by various forms of governmental action both in the United States and throughout the world. Examples of such governmental action include, but are by no means limited to: tax increases and retroactive tax claims; royalty and revenue sharing increases; import and export controls; price controls; currency controls; allocation of supplies of crude oil and petroleum products and other goods; expropriation of property; restrictions and preferences affecting the issuance of oil and gas or mineral leases; restrictions on drilling and/or production; laws and regulations intended for the promotion of safety and the protection and/or remediation of the environment; governmental support for other forms of energy; and laws and regulations affecting the Company’s relationships with employees, suppliers, customers, stockholders and others. Because governmental actions are often motivated by political considerations and may be taken without full consideration of their consequences, and may be taken in response to actions of other governments, it is not practical to attempt to predict the likelihood of such actions, the form the actions may take or the effect such actions may have on the Company.

Murphy and other companies in the oil and gas industry are subject to numerous federal, state, local and foreign laws and regulations dealing with the environment. Violation of federal or state environmental laws, regulations and permits can result in the imposition of significant civil and criminal penalties, injunctions and construction bans or delays. A discharge of hazardous substances into the environment could, to the extent such event is not insured, subject the Company to substantial expense, including both the cost to comply with applicable regulations and claims by neighboring landowners and other third parties for any personal injury and property damage that might result.

The Company currently owns or leases, and has in the past owned or leased, properties at which hazardous substances have been or are being handled. Although the Company has used operating and disposal practices that were standard in the industry at the time, hazardous substances may have been disposed of or released on or under the properties owned or leased by the Company or on or under other locations where these wastes have been taken for disposal. In addition, many of these properties have been operated by third parties whose treatment and disposal or release of hydrocarbons or other wastes were not under Murphy’s control. Under existing laws the Company could be required to remove or remediate previously disposed wastes (including wastes disposed of or released by prior owners or operators), to clean up contaminated property (including contaminated groundwater) or to perform remedial plugging operations to prevent future contamination. While some of these historical properties are in various stages of negotiation, investigation, and/or cleanup, the Company is investigating the extent of any such liability and the availability of applicable defenses and believes costs related to these sites will not have a material adverse affect on Murphy’s net income, financial condition or liquidity in a future period.

The Company’s liability for remedial obligations includes certain amounts that are based on anticipated regulatory approval for proposed remediation of former refinery waste sites. Although regulatory authorities may require more costly alternatives than the proposed processes, the cost of such potential alternative processes is not expected to exceed the accrued liability by a material amount. Certain environmental expenditures are likely to be recovered by the Company from other sources, primarily environmental funds maintained by certain states. Since no assurance can be given that future recoveries from other sources will occur, the Company has not recorded a benefit for likely recoveries.

The U.S. Environmental Protection Agency (EPA) currently considers the Company to be a Potentially Responsible Party (PRP) at two Superfund sites. The potential total cost to all parties to perform necessary remedial work at these sites may be substantial. However, based on current negotiations and available information, the Company believes that it is a de minimis party as to ultimate responsibility at these Superfund sites. The Company has not recorded a liability for remedial costs on Superfund sites. The Company could be required to bear a pro rata share of costs attributable to nonparticipating PRPs or could be assigned additional responsibility for remediation at the two sites or other Superfund sites. The Company believes that its share of the ultimate costs to clean-up the Superfund sites will be immaterial and will not have a material adverse effect on its net income, financial condition or liquidity in a future period.

There is the possibility that environmental expenditures could be required at currently unidentified sites, and new or revised regulations could require additional expenditures at known sites. However, based on information currently available to the Company, the amount of future remediation costs incurred at known or currently unidentified sites is not expected to have a material adverse effect on the Company’s future net income, cash flows or liquidity.

Based on the results of litigation entitled Kerr-McGee v. Allred, the Company has an unrecorded contingent gain for recovery of Gulf of Mexico federal royalties totaling approximately $244 million, plus accrued interest. In October 2009, the U.S. Supreme Court refused to review the decision handed down by the U.S. Court of Appeals for the Fifth Circuit whereby Kerr-McGee was held not liable for royalties when oil and/or natural gas price thresholds were exceeded for certain deepwater Gulf of Mexico leases. The Company paid federal royalties on similar leases when the prices exceeded the benchmark levels. The Company filed a claim in October 2009 requesting refund of these royalties plus interest with the U.S. Department of Interior, and awaits word on the outcome of the claim. The Company will recognize this benefit to income, net of applicable income tax effects, when the U.S. Department of Interior provides appropriate evidence that it intends to honor the Company’s request for refund. The Company cannot predict how or when the government will respond to this request for refund.

Class action litigation and related opt-out claims involving the Hurricane Katrina related crude oil release in 2005 at the Company’s Meraux, Louisiana refinery have been resolved. Remaining litigation arising out of this incident consists of fewer than ten individual claims from outside the class area for which the Company’s exposure is de minimis. The Company originally recorded expense of $18 million in 2006 related to settlement costs not expected to be covered by insurance. As a result of a confidential arbitral tribunal ruling issued on September 10, 2009 relating to liability insurance coverage issues, the Company recorded a benefit of $4.5 million in the third quarter 2009 to reduce the total overall expected expense related to this matter. Accordingly, the matter will not have a material adverse effect on the Company’s net income, financial condition or liquidity in a future period.

Litigation arising out of a June 10, 2003 fire in the Residual Oil Supercritical Extraction (ROSE) unit at the Company’s Meraux, Louisiana refinery was settled in July 2009 and memorialized via a filing in the U.S. District Court for the Eastern District of Louisiana on July 24, 2009. An arbitral tribunal heard the Company’s claim for indemnity from one of its insurers, AEGIS, in September 2009 and a decision is expected before year end. The Company believes that insurance coverage does apply for this matter. The Company continues to believe that the ultimate resolution of the June 2003 ROSE fire litigation, including associated insurance coverage issues, will not have a material adverse effect on its net income, financial condition or liquidity in a future period.

The joint agreement between the owners of the Terra Nova field offshore eastern Canada requires a redetermination of working interests based on an analysis of reservoir quality among fault separated areas where varying ownership interests exist. Heretofore, the Company’s ownership interest has been 12.0%. The matter will be the subject of arbitration before final interests are established. This redetermination is expected to be finalized in 2010, and is retroactive to approximately January 2005. Upon completion of the redetermination process, a cash settlement is required among partners to balance cash flows retroactive to the effective date. Information filed with the arbiter indicates that the Company’s interest at Terra Nova will be reduced. During the nine-month period ended September 30, 2009, the Company recorded a $36.4 million pretax charge ($25.6 million after tax) to reflect the estimated liability that will be owed through September 2009 activity for the anticipated reduction in working interest to 11.5%. The final results of the arbitration process could further reduce the Company’s working interest. The Company cannot predict at this time how its final ownership interest will be affected by the redetermination process, and it is unable to determine whether the ultimate settlement of this matter will have a material adverse effect on its net income in a future period.

Murphy and its subsidiaries are engaged in a number of other legal proceedings, all of which Murphy considers routine and incidental to its business. Based on information currently available to the Company, the ultimate resolution of these matters is not expected to have a material adverse effect on the Company’s net income, financial condition or liquidity in a future period.

In the normal course of its business, the Company is required under certain contracts with various governmental authorities and others to provide financial guarantees or letters of credit that may be drawn upon if the Company fails to perform under those contracts. At September 30, 2009, the Company had contingent liabilities of $7.8 million under a financial guarantee and $166.0 million on outstanding letters of credit. The Company has not accrued a liability in its balance sheet related to the financial guarantee and letters of credit because it is believed that the likelihood of having these drawn is remote.

17 NORTHROP GRUMMAN CORP /DE/
 
10.  LITIGATION
 
U.S. Government Investigations and Claims – Departments and agencies of the U.S. Government have the authority to investigate various transactions and operations of the company, and the results of such investigations may lead to administrative, civil or criminal proceedings, the ultimate outcome of which could be fines, penalties, repayments or compensatory or treble damages. U.S. Government regulations provide that certain findings against a contractor may lead to suspension or debarment from future U.S. Government contracts or the loss of export privileges for a company or an operating division or subdivision. Suspension or debarment could have a material adverse effect on the company because of its reliance on government contracts.
 
In the second quarter of 2007, the U.S. Coast Guard issued a revocation of acceptance under the Deepwater Program for eight converted 123-foot patrol boats (the vessels) based on alleged “hull buckling and shaft alignment problems” and alleged “nonconforming topside equipment” on the vessels. The company submitted a written response that argued that the revocation of acceptance was improper. The Coast Guard advised Integrated Coast Guard Systems, LLC (ICGS), which was formed by the contractors to perform the Deepwater Program, that it was seeking $96.1 million from ICGS as a result of the revocation of acceptance. The majority of the costs associated with the 123-foot conversion effort are associated with the alleged structural deficiencies of the vessels, which were converted under contracts with the company and a subcontractor to the company. In 2008, the Coast Guard advised ICGS that the Coast Guard would support an investigation by the U.S. Department of Justice of ICGS and its subcontractors instead of pursuing its $96.1 million claim independently. The Department of Justice conducted an investigation of ICGS under a sealed False Claims Act complaint filed in the U.S. District Court for the Northern District of Texas and decided in early 2009 not to intervene at that time. On February 12, 2009, the Court unsealed the complaint filed by Michael J. DeKort, a former Lockheed Martin employee, against ICGS, Lockheed Martin Corporation and the company, relating to the 123-foot conversion effort. On July 22, 2009, the three defendants moved to dismiss the complaint. On October 2, 2009, the Court denied a motion to dismiss by defendants as moot because it granted leave for plaintiff to file an amended complaint and set a trial date of November 1, 2010. Based upon the information available to the company to date, the company believes that it has substantive defenses to any potential claims but can give no assurance that the company will prevail in this litigation.
 
In August 2008, the company disclosed to the Antitrust Division of the U.S. Department of Justice possible violations of federal antitrust laws in connection with the bidding process for certain maintenance contracts at a military installation in California. In February 2009, the company and the Department of Justice signed an agreement admitting the company into the Corporate Leniency Program. As a result of the company’s acceptance into the Program, the company will be exempt from federal criminal prosecution and criminal fines relating to the matters the company reported to the Department of Justice if the company complies with certain conditions, including its continued cooperation with the government’s investigation and its agreement to make restitution if the government was harmed by the violations.
 
Based upon the available information regarding matters that are subject to U.S. Government investigations, the company believes that the outcome of any such matters would not have a material adverse effect on its consolidated financial position, results of operations or cash flows.
 
Litigation – Various claims and legal proceedings arise in the ordinary course of business and are pending against the company and its properties. Based upon the information available, the company believes that the resolution of any of these various claims and legal proceedings would not have a material adverse effect on its consolidated financial position, results of operations, or cash flows.
 
The company is one of several defendants in litigation brought by the Orange County Water District in Orange County Superior Court in California on December 17, 2004, for alleged contribution to volatile organic chemical contamination of the County’s shallow groundwater. The lawsuit includes counts against the defendants for violation of the Orange County Water District Act, the California Super Fund Act, negligence, nuisance, trespass and declaratory relief. Among other things, the lawsuit seeks unspecified damages for the cost of remediation, payment of attorney fees and costs, and punitive damages. The June 2009 trial date was vacated and a status conference has been set for mid-November 2009.
 
The U.S. District Court for the Central District of California consolidated two separately filed Employee Retirement Income Security Act (ERISA) lawsuits, which the plaintiffs seek to have certified as class actions, into the In Re Northrop Grumman Corporation ERISA Litigation. On August 7, 2007, the District Court denied plaintiffs’ motion for class certification, and the plaintiffs appealed the Court’s decision on class certification to the U.S. Court of Appeals for the Ninth Circuit. On September 8, 2009, the Ninth Circuit vacated the Order denying class certification, remanded the issue to the District Court for further consideration, and ordered that the case be reassigned to a different judge. The company believes that the outcome of these matters would not have a material adverse effect on its consolidated financial position, results of operations or cash flows.
 
On June 22, 2007, a putative class action was filed against the Northrop Grumman Pension Plan and the Northrop Grumman Retirement Plan B and their corresponding administrative committees, styled as Skinner et al. v. Northrop Grumman Pension Plan, etc., et al., in the U.S. District Court for the Central District of California. The putative class representatives alleged violations of ERISA and breaches of fiduciary duty concerning a 2003 modification to the Northrop Grumman Retirement Plan B. The modification relates to the employer funded portion of the pension benefit available during a five-year transition period that ended on June 30, 2008. The plaintiffs dismissed the Northrop Grumman Pension Plan, and in 2008 the District Court granted summary judgment in favor of all remaining defendants on all claims. The plaintiffs appealed, and in May 2009, the Ninth Circuit reversed the decision of the District Court and remanded the matter back to the District Court for further proceedings, finding that there was ambiguity in a 1998 summary plan description related to the employer funded component of the pension benefit.
 
Insurance Recovery – The company is pursuing legal action against an insurance provider arising out of a disagreement concerning the coverage of certain losses related to Hurricane Katrina (see Note 11). The company commenced the action against Factory Mutual Insurance Company (FM Global) on November 4, 2005, which is now pending in the U.S. District Court for the Central District of California, Western Division. In August 2007, the District Court issued an order finding that the excess insurance policy provided coverage for the company’s Katrina-related loss. In November 2007, FM Global filed a notice of appeal of the District Court’s order. On August 14, 2008, the U.S. Court of Appeals for the Ninth Circuit reversed the earlier summary judgment order in favor of the company, holding that the FM Global excess policy unambiguously excludes damage from the storm surge caused by Hurricane Katrina under its “Flood” exclusion. The Ninth Circuit remanded the case to the District Court to determine whether the California efficient proximate cause doctrine affords the company coverage under the policy even if the Flood exclusion of the policy is unambiguous. The company filed a Petition for Rehearing En Banc, or in the Alternative, For Panel Rehearing with the Ninth Circuit on August 27, 2008. On April 2, 2009, the Ninth Circuit denied the company’s Petition for Rehearing and remanded the case to the District Court. On June 10, 2009, the company filed a motion seeking leave of court to file a complaint adding AON Risk Services, Inc. of Southern California as a defendant. On July 1, 2009, FM Global filed a motion for partial summary judgment seeking a determination that the California efficient proximate cause doctrine is not applicable or that it affords no coverage under the policy. Both motions have been fully briefed and argued. Based on the current status of the litigation, no assurances can be made as to the ultimate outcome of this matter.
 
During 2008, the company received notification from Munich-American Risk Partners (Munich Re), the only remaining insurer within the primary layer of insurance coverage with which a resolution has not been reached, that it will pursue arbitration proceedings against the company related to approximately $19 million owed by Munich Re to Northrop Grumman Risk Management Inc. (NGRMI), a wholly-owned subsidiary of the company, for certain losses related to Hurricane Katrina. The company was subsequently notified that Munich Re also will seek reimbursement of approximately $44 million of funds previously advanced to NGRMI for payment of claim losses of which Munich Re provided reinsurance protection to NGRMI pursuant to an executed reinsurance contract, and $6 million of adjustment expenses. The company believes that NGRMI is entitled to full reimbursement of its covered losses under the reinsurance contract and has substantive defenses to the claim of Munich Re for return of the funds paid to date.
 
Provisions for Legal & Investigative Matters – Litigation accruals are recorded as charges to earnings when management, after taking into consideration the facts and circumstances of each matter, including any settlement offers, has determined that it is probable that a liability has been incurred and the amount of the loss can be reasonably estimated. The ultimate resolution of any exposure to the company may vary from earlier estimates as further facts and circumstances become known.
18 Oracle Corporation

13.    LEGAL PROCEEDINGS

 

Securities Class Action

Stockholder class actions were filed in the United States District Court for the Northern District of California against us and our Chief Executive Officer on and after March 9, 2001. Between March 2002 and March 2003, the court dismissed plaintiffs’ consolidated complaint, first amended complaint and a revised second amended complaint. The last dismissal was with prejudice. On September 1, 2004, the United States Court of Appeals for the Ninth Circuit reversed the dismissal order and remanded the case for further proceedings. The revised second amended complaint named our Chief Executive Officer, our then Chief Financial Officer (who currently is Chairman of our Board of Directors) and a former Executive Vice President as defendants. This complaint was brought on behalf of purchasers of our stock during the period from December 14, 2000 through March 1, 2001. Plaintiffs alleged that the defendants made false and misleading statements about our actual and expected financial performance and the performance of certain of our applications products, while certain individual defendants were selling Oracle stock in violation of federal securities laws. Plaintiffs further alleged that certain individual defendants sold Oracle stock while in possession of material non-public information. Plaintiffs also allege that the defendants engaged in accounting violations. On July 26, 2007, defendants filed a motion for summary judgment, and plaintiffs filed a motion for partial summary judgment against all defendants and a motion for summary judgment against our Chief Executive Officer.  On August 7, 2007, plaintiffs filed amended versions of these motions.  On October 5, 2007, plaintiffs filed a motion seeking a default judgment against defendants or various other sanctions because of defendants’ alleged destruction of evidence.  A hearing on all these motions was held on December 20, 2007.  On April 7, 2008, the case was reassigned to a new judge.  On June 27, 2008, the court ordered supplemental briefing on plaintiffs’ sanctions motion.  On September 2, 2008, the court issued an order denying plaintiffs’ motion for partial summary judgment against all defendants.  The order also denied in part and granted in part plaintiffs’ motion for sanctions.  The court denied plaintiffs’ request that judgment be entered in plaintiffs’ favor due to the alleged destruction of evidence, and the court found that no sanctions were appropriate for several categories of evidence.  The court found that sanctions in the form of adverse inferences were appropriate for two categories of evidence: e-mails from our Chief Executive Officer’s account, and materials that had been created in connection with a book regarding our Chief Executive Officer.  The court then denied defendants’ motion for summary judgment and plaintiffs’ motion for summary judgment against our Chief Executive Officer and directed the parties to revise and re-file these motions to clearly specify the precise contours of the adverse inferences that should be drawn, and to take these inferences into account with regard to the propriety of summary judgment.  The court also directed the parties to address certain legal issues in the briefing. 

On October 13, 2008, the parties participated in a court-ordered mediation, which did not result in a settlement.  On October 20, 2008, defendants filed a motion for summary judgment, and plaintiffs filed a motion for summary judgment against our Chief Executive Officer.  The parties also filed several motions challenging the admissibility of the testimony of various expert witnesses.  Opposition briefs were filed on November 17, 2008, and reply briefs were filed on December 12, 2008.  A hearing on all these motions was held on February 13, 2009.

On June 16, 2009, the court issued an order granting defendants’ motion for summary judgment and denying plaintiffs’ motion for summary judgment against our Chief Executive Officer, and it entered a judgment dismissing the entire case with prejudice.  On July 14, 2009, plaintiffs filed a notice of appeal.  Plaintiffs seek unspecified damages plus interest, attorneys’ fees and costs, and equitable and injunctive relief. 

EpicRealm/Parallel Networks Intellectual Property Litigation

On June 30, 2006, we filed a declaratory judgment action against EpicRealm Licensing, LP (“EpicRealm”) in the United States District Court, District of Delaware, seeking a judicial declaration of noninfringement and invalidity of U.S. Patent Nos. 5,894,554 (the ‘554 Patent) and 6,415,335B1 (the ‘335 Patent).  We filed the lawsuit following the resolution of an indemnification claim by one of our customers related to EpicRealm’s assertion of the ‘554 Patent and ‘335 Patent against the customer in a patent infringement case in the United States District Court for the Eastern District of Texas.  

On April 13, 2007, EpicRealm filed an Answer and Counterclaim in which it: (1) denies our noninfringement and invalidity allegations; (2) alleges that we have willfully infringed, and are willfully infringing, the ‘554 Patent and ‘335 Patent; and (3) requests a permanent injunction, an award of unspecified money damages, interest, attorneys’ fees, and costs. On May 7, 2007, we filed an Answer to EpicRealm’s infringement counterclaim, denying EpicRealm’s infringement allegations and asserting affirmative defenses.   In August 2007, the patents-in-suit were sold to Parallel Networks, LLC, which thereafter substituted in as the defendant in place of EpicRealm.  

The parties have completed discovery and filed briefing on claim construction and summary judgment motions.  A Markman hearing and oral argument on summary judgment motions were held October 3, 2008.  A court-ordered mediation was held on October 8, 2008, which did not result in a settlement.  On December 4, 2008, the court issued an order granting summary judgment that our Web Cache, Internet Application Server, and RAC Database do not infringe the patents.  The court also denied our motion for summary judgment that the patents are invalid, and denied in part and granted in part Parallel Networks’s motion for summary judgment that certain prior art references do not invalidate the patents through anticipation.  Trial was scheduled to begin on January 12, 2009, on issues of invalidity and inequitable conduct.  On December 23, 2008, the parties reached an agreement allowing Parallel Networks to immediately appeal the court’s summary judgment order and preserving Oracle’s invalidity and inequitable conduct claims in the event that the matter is remanded for trial at a later time.  On January 23, 2009, Parallel Networks filed a notice of appeal, and filed its opening brief on April 10, 2009.  A court-ordered mediation was held on June 1, 2009, which did not result in a settlement. Oracle’s opposition on appeal was filed on September 10, 2009, and EpicRealm’s reply is due October 9, 2009.  We will continue to pursue this action vigorously. 

SAP Intellectual Property Litigation

On March 22, 2007, Oracle Corporation, Oracle USA, Inc. and Oracle International Corporation (collectively, Oracle) filed a complaint in the United States District Court for the Northern District of California against SAP AG, its wholly owned subsidiary, SAP America, Inc., and its wholly owned subsidiary, TomorrowNow, Inc., (collectively, the SAP Defendants) alleging violations of the Federal Computer Fraud and Abuse Act and the California Computer Data Access and Fraud Act, civil conspiracy, trespass, conversion, violation of the California Unfair Business Practices Act, and intentional and negligent interference with prospective economic advantage. Oracle alleged that SAP unlawfully accessed Oracle’s Customer Connection support website and improperly took and used Oracle’s intellectual property, including software code and knowledge management solutions. The complaint seeks unspecified damages and preliminary and permanent injunctive relief. On June 1, 2007, Oracle filed its First Amended Complaint, adding claims for infringement of the federal Copyright Act and breach of contract, and dropping the conversion and separately pled conspiracy claims.  On July 2, 2007 the SAP Defendants’ filed their Answer and Affirmative Defenses, acknowledging that TomorrowNow had made some “inappropriate downloads” and otherwise denying the claims alleged in the First Amended Complaint. The parties are engaged in discovery and continue to negotiate a Preservation Order. At case management conferences held on February 12, 2008 and April 24, 2008, Oracle advised the Court that Oracle intended to file a Second Amended Complaint, based on new facts learned during the course of discovery.

On July 28, 2008, Oracle filed a Second Amended Complaint, which added additional allegations based on facts learned during discovery.  Among the new allegations contained in the Second Amended Complaint, Oracle alleges that TomorrowNow’s business model relied on illegal copies of Oracle’s underlying software applications and that TomorrowNow used these copies as generic software environments that TomorrowNow then used to create fixes and updates, to service customers and to train employees.  The Second Amended Complaint also alleges that these practices may have extended to other Oracle products, including Siebel products.

On October 8, 2008, Oracle filed a Third Amended Complaint pursuant to stipulation.  The Third Amended Complaint made some changes relating to the Oracle plaintiff entities (removing Oracle Corporation and adding Oracle Systems Corporation, Oracle EMEA Ltd., and J.D. Edwards Europe Ltd.) but did not change the substantive allegations.    On October 15, 2008, the SAP Defendants filed a motion to dismiss portions of the Third Amended Complaint, and after full briefing, the court heard oral argument on November 26, 2008.  On December 15, 2008, the court issued an order granting in part and denying in part the motion.  The court dismissed with prejudice the claims asserted by plaintiffs JD Edwards Europe Ltd. and Oracle Systems Corporation, and denied the motion in all other respects.  The parties are engaged in discovery.

On July 15, 2009, Oracle filed a motion for leave to file a Fourth Amended Complaint to add claims for infringement of Oracle’s Siebel software and database programs.  The Court granted Oracle’s motion and Oracle filed its Fourth Amended Complaint on August 18, 2009.  The SAP Defendants filed an Answer to Oracle’s Fourth Amended Complaint on August 26, 2009.

On August 26, 2009, the SAP Defendants filed an early motion for summary judgment directed to Oracle’s damages theory.  Oracle’s opposition is due September 23, 2009.  That motion is set to be heard on October 28, 2009. 

On June 11, 2009, the court entered a Stipulated Revised Case Management and Pretrial Order, pursuant to which the court set a new trial date of November 2010.

Other Litigation

We are party to various other legal proceedings and claims, either asserted or unasserted, which arise in the ordinary course of business, including proceedings and claims that relate to acquisitions we have completed or to companies we have acquired or are attempting to acquire. While the outcome of these matters cannot be predicted with certainty, we do not believe that the outcome of any of these claims or any of the above mentioned legal matters will have a materially adverse effect on our consolidated financial position, results of operations or cash flows.

 

19 PARKER HANNIFIN CORP
12. Contingencies

The Company is involved in various legal proceedings arising in the normal course of business, including proceedings based on product liability claims, workers’ compensation claims and alleged violations of various environmental laws. The Company is self-insured in the United States for health care, workers’ compensation, general liability and product liability up to predetermined amounts, above which third party insurance applies. Management regularly reviews the probable outcome of these proceedings, the expenses expected to be incurred, the availability and limits of the insurance coverage, and the established accruals for liabilities. While the outcome of pending proceedings cannot be predicted with certainty, management believes that any liabilities that may result from these proceedings will not have a material adverse effect on the Company’s liquidity, financial condition or results of operations.

Parker ITR S.r.l. (Parker ITR), a subsidiary acquired on January 31, 2002, has been the subject of a number of lawsuits and regulatory investigations, which are more fully described in Part II, Item 1 of this Quarterly Report on Form 10-Q. Each of these lawsuits and regulatory investigations was also described in the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2009. The status of these lawsuits and regulatory investigations has not significantly changed since June 30, 2009. No additional accruals were recorded during the first quarter of fiscal 2010 relating to these lawsuits and regulatory investigations. The Company has made all required payments as of September 30, 2009 and has a remaining reserve of $2.9 million for future losses relating to these matters. Legal expenses related to these matters are being expensed as incurred and were insignificant in the first quarter of fiscal 2010.

20 PROGRESSIVE CORP/OH/

Note 10 Litigation — The Progressive Corporation and/or its insurance subsidiaries are named as defendants in various lawsuits arising out of claims made under insurance policies issued by our subsidiaries in the ordinary course of their businesses. All legal actions relating to such insurance claims are considered by us in establishing our loss and loss adjustment expense reserves.

In addition, various Progressive entities are named as defendants in various class action or individual lawsuits arising out of the operations of our insurance subsidiaries. These cases include those alleging damages as a result of our use of consumer reports (such as credit reports) in underwriting and related notice requirements under the federal Fair Credit Reporting Act; practices in evaluating or paying medical or injury claims or benefits, including, but not limited to, personal injury protection, medical payments, uninsured motorist/underinsured motorist (UM/UIM) coverage, and bodily injury benefits; rating practices at policy renewal; the utilization, content, or appearance of UM/UIM rejection forms; the practice of taking betterment on boat repairs; labor rates paid to auto body repair shops; and cases challenging other aspects of our claims or marketing practices or other business operations. Other insurance companies face many of these same issues.

We plan to contest the outstanding suits vigorously, but may pursue settlement negotiations in some cases, if appropriate. In accordance with accounting principles generally accepted in the United States of America (GAAP), we establish loss reserves for a lawsuit when it is probable that a loss has been incurred and we can reasonably estimate its potential exposure. Pursuant to GAAP, we have not established reserves for those lawsuits where the loss is not probable and/or we are currently unable to estimate our potential exposure. If any one or more of these lawsuits results in a judgment against, or settlement by, our insurance subsidiaries for an amount that is significantly greater than the amount, if any, so reserved, the resulting liability could have a material effect on our financial condition, cash flows, and results of operations.

For a further discussion on our pending litigation, see “Item 3-Legal Proceedings” in our Annual Report on Form 10-K for the year ended December 31, 2008.

21 ROPER INDUSTRIES INC
10.  
Contingencies

We, in the ordinary course of business, are the subject of, or a party to, various pending or threatened legal actions, including those pertaining to product liability and employment practices. We are vigorously contesting all lawsuits that, in general, are based upon claims of the kind that have been customary over the past several years. After analyzing our contingent liabilities on a gross basis and, based upon past experience with resolution of its product liability and employment practices claims and the limits of the primary, excess, and umbrella liability insurance coverages that are available with respect to pending claims, management believes that adequate provision has been made to cover any potential liability not covered by insurance, and that the ultimate liability, if any, arising from these actions should not have a material adverse effect on our consolidated financial position, results of operations or cash flows.

Over recent years there has been a significant increase in certain U.S. states in asbestos-related litigation claims against numerous industrial companies. Roper or its subsidiaries have been named defendants in some such cases. No significant resources have been required by us to respond to these cases and we believe we have valid defenses to such claims and, if required, intend to defend them vigorously. Given the state of these claims it is not possible to determine the potential liability, if any.

Our financial statements include accruals for potential product liability and warranty claims based on our claims experience. Such costs are accrued at the time revenue is recognized. A summary of the warranty accrual activity for the nine months ended September 30, 2009 is presented below (in thousands).
 
Balance at December 31, 2008
 
$
9,885
 
Additions charged to costs and expenses
   
2,984
 
Deductions
   
(5,847
)
Other
   
285
 
Balance at September 30, 2009
 
$
7,307
 
 
22 ROWAN COMPANIES INC
During 2005, Rowan lost four offshore rigs, including the Rowan-Halifax, and incurred significant damage on a fifth as a result of Hurricanes Katrina and Rita.  The Company had leased the Rowan-Halifax under a charter agreement that commenced in 1984 and was scheduled to expire in March 2008.  The rig was insured for $43.4 million, a value that Rowan believes to be more than sufficient to satisfy its obligations under the charter agreement, and by a margin sufficient to cover the $6.3 million carrying value of Rowan equipment installed on the rig.  However, the parties holding interests in the rig under the charter claimed that the rig should have been insured for its fair market value and sought recovery from Rowan for compensation above the insured value.  Thus, Rowan assumed no insurance proceeds related to the Rowan-Halifax and recorded a charge during 2005 for the full carrying value of its equipment.  On November 3, 2005, the Company filed a declaratory judgment action styled Rowan Companies, Inc. vs. Textron Financial Corporation and Wilmington Trust Company as Owner Trustee of the Rowan-Halifax 116-C Jack-Up Rig in the 215th Judicial District Court of Harris County, Texas.  The owner interests filed a counterclaim for a variety of relief, claiming a right to payment under the charter based on a post-casualty rig valuation of approximately $83 million.  The insurance proceeds were placed in escrow.  The district court ultimately granted judgment against Rowan for the difference between (a) what Rowan had already paid to the Owner Trustee out of the escrowed insurance proceeds and (b) that rig valuation.  On March 31, 2009, the Court of Appeals for the 14th District of Texas reversed this judgment, holding that the Company’s interpretation of the charter was substantially correct, but directing Rowan to pay additional amounts due under the charter.  The Company has since made this payment out of the escrowed insurance proceeds.  In addition, the Court of Appeals remanded the case for further proceedings in the district court to resolve additional issues and to determine the parties’ respective rights to the balance of the escrowed insurance proceeds, which is currently $21.4 million.  The owner interests filed a motion for rehearing of the Court of Appeals’ decision. On October 8, 2009, the Court of Appeals denied the motion, but issued a substitute opinion to clarify the scope of the remand.  The Court of Appeals again held that the trial court is to resolve issues concerning the proper disposition of excess insurance proceeds.  The Court of Appeals further held that the owner interests’ claim that Rowan breached the charter agreement by failing to maintain adequate insurance remains to be decided by the trial court.  The owner interests have filed another motion for rehearing, which motion remains pending.  The Company believes that no further payment is owed to the opposing parties under the charter and intends to pursue that position vigorously in all subsequent court proceedings.

10

ROWAN COMPANIES, INC. AND SUBSIDIARIES

NOTES TO UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)


During 2004, Rowan learned that the Environmental and Natural Resources Division, Environmental Crimes Section of the U.S. Department of Justice (“DOJ”) had begun conducting a criminal investigation of environmental matters involving several of the Company’s offshore drilling rigs, including a rig known as the  Rowan-Midland, which at various times operated in the Gulf of Mexico.  In 2007, the Company entered into a plea agreement with the DOJ, as amended, under which the Company paid fines and made community service payments totaling $9 million and agreed to be subject to unsupervised probation for a period of three years.  During this period the Company must ensure that it commits no further criminal violations of federal, state, or local laws or regulations and must also continue to implement its comprehensive Environmental Management System Plan.  Subsequent to the conduct at issue, the Company sold the Rowan-Midland to a third party.  Concurrent with the plea agreement, the Environmental Protection Agency approved a compliance agreement with Rowan which, among other things, contains a certification that the conditions giving rise to the violations to which the Company entered guilty pleas have been corrected.  The Company believes that if it fully complies with the terms of the compliance agreement, it will not be suspended or debarred from entering into or participating in contracts with the U.S. Government or any of its agencies.

On January 3, 2008, a civil lawsuit styled State of Louisiana, ex. rel. Charles C. Foti, Jr., Attorney General vs. Rowan Companies, Inc. was filed in U.S District Court, Eastern District of Texas, Marshall Division, seeking damages, civil penalties and costs and expenses for alleged commission of maritime torts and violations of environmental and other laws and regulations involving the Rowan-Midland and other facilities in areas in or near Louisiana.  Subsequently, the case was transferred to U.S. District Court, Southern District of Texas, Houston Division.  The Company intends to vigorously defend its position in this case but cannot estimate any potential liability at this time.

In June 2007, Rowan received a subpoena for documents from the U.S. District Court, Eastern District of Louisiana, relating to a grand jury hearing.  The agency requesting the information is the U.S. Department of the Interior, Office of Inspector General Investigations.  The documents requested include all records relating to use of the Company’s entertainment facilities and entertainment expenses for a former employee of the Minerals Management Service, U.S. Department of Interior, and other records relating to items of value provided to any official or employee of the U.S. Government.  The Company fully cooperated with the subpoena.

The construction of Rowan’s fourth Tarzan Class jack-up rig, the J.P. Bussell, was originally subcontracted to an outside Gulf of Mexico shipyard, Signal International LLC (“Signal”), and scheduled for delivery in the third quarter of 2007 at a total cost of approximately $145 million.  As a result of various problems encountered on the project, Rowan exercised its right to take over the rig construction pursuant to the terms of the construction contract, and Signal turned the rig over to the Company in March 2008.  The rig was later completed by the Company more than one year behind schedule, and its final cost was approximately 40% over the original estimate.  Accordingly, Rowan has declared Signal in breach of contract and initiated court proceedings styled Rowan Companies, Inc. and LeTourneau Technologies, Inc. vs. Signal International LLC in the 269th Judicial District Court of Harris County, Texas, to recover the cost to complete the rig over and above the agreed contract price and other damages, plus interest.  Signal filed a separate counterclaim against Rowan styled Signal International LLC vs. LeTourneau, Inc., in the U.S. District Court, Southern District of Texas, Houston Division, alleging breach of contract and claiming unspecified damages for cost overruns.  That case has been administratively stayed in favor of the State Court proceeding filed by the Company.  Signal reasserted its claimed damages for amounts owed and additional costs incurred, totaling approximately $63 million, as a counterclaim in the State Court suit.  The Company intends to vigorously defend its rights under the contract.  The Company does not believe that it is probable that Signal will prevail in its claim and has made no accrual for such at September 30, 2009.


11

ROWAN COMPANIES, INC. AND SUBSIDIARIES

NOTES TO UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)


On December 9, 2008, the Company received a termination letter from a customer regarding two contracts for the purchase of nine land rigs in the amount of $90.2 million and nine top drives in the amount of $10.3 million.  In the letter, the customer alleged that the top drive contract had not become effective because a down payment was never made and further alleged that they had the right to terminate the land rig contract because of late deliveries.  The Company firmly believes that both allegations are without merit.  Accordingly, the Company initiated court proceedings styled LeTourneau Technologies Drilling Systems, Inc. (“LTDSI”) vs. Nomac Drilling, LLC (“Nomac”) in the U.S. District Court, Southern District of Texas, Houston, on December 13, 2008 requesting a declaratory judgment and alleged anticipatory repudiation.  On January 5, 2009, Nomac filed a Notice of Removal to Federal Court.  The Company does not believe any loss that may result in the event of an unfavorable resolution of this matter would have a material adverse effect on its financial position, results of operations or cash flows.

During 2005, the Company learned that the DOJ was conducting an investigation of potential antitrust violations among helicopter transportation providers in the Gulf of Mexico.  Rowan's former aviation subsidiary, which was sold effective December 31, 2004, received a subpoena in connection with the investigation.  The Company has not been contacted by the DOJ, but the purchaser claimed that Rowan is responsible for any exposure it may have.  The Company has disputed that claim. On August 6, 2009, the Comp